The file's text, extracted by GovTribe without its formatting.
Contract Opportunity Combined Synopsis/Solicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice S208 National Cemetery Administration - Southeast District - Cape Canaveral National Cemetery - Solicitation for New Grounds Maintenance contract-Base and 4 Option years.
22172 36C78621Q0067 01-25-2021 16:00
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
561730 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 Kenneth Randle
(703) 630-9356 Kenneth.Randle@va.gov 703-630-9356 Cape Canaveral National Cemetery 5525 U.S. Highway 1 Mims
FL
32754
USA
https://www.va.gov Department of Veterans Affairs Kenneth.Randle@va.gov Contracting Officer
RFQ FOR COMMERCIAL ITEMS
GENERAL INFORMATION
| Document Type: | | Combined Synopsis Solicitation | |
| Solicitation Number: | | 36C78621Q0067 | |
| Post Date: | | | 12/28/2020 |
| Original Response Date: | 01/25/2021 16:00 EST | | |
| Applicable NAICS: | | 561730 | |
| Classification Code: | | S208, Grounds Maintenance Services | |
| Set Aside Type: | | | 100% Service Disable Owned Small Business (SDVOSB) |
| Period of Performance: | Date of Award through February 3, 2026 | | |
| Issuing Contracting Office: | Department of Veterans Affairs | |
| | National Cemetery Administration, Contract Services |
| | 18434 Joplin Road |
| | Triangle, VA 22172 |
| | Mr. Kenneth Randle Sr., Contracting Officer |
| Place of Performance: | Cape Canaveral National Cemetery | |
| | 5525 U.S. Highway 1 |
Mims, FL, 32754
Attachments: A – Past Performance Questionnaire B – Wage Determination, Brevard County FL – 22 Dec 2020
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; offers are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78621Q0067
This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2021-2.
This is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB).
The applicable North American Industrial Classification System (NAICS) code for this procurement is 561730, with a business size standard of 8 Million.
This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to an acquisition approach.
The U.S. Department of Veteran Affairs, National Cemetery Administration anticipates the award of a Firm Fixed Priced Requirement Contract for Grounds Maintenance Services at Cape Canaveral National Cemetery.
POST AWARD CONFERENCE: Date and time to be determined (TBD) after contract award.
SITE VISIT: Offerors or quoters are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. All contractors and attendees shall follow CDC guidelines for COVID-19 on government premises and must practice safe social distancing and wear acceptable facial coverings; in addition to any other required personal protective equipment (PPE) outlined for the state of Florida at the time of the site visit.
If you plan to attend a site visit / inspection at Cape Canaveral National Cemetery, YOU MUST CONTACT the COR Mr. Edward Calderon via email at Edward.Calderon@va.gov to make arrangements
RESPONSE TO REQUEST FOR QUOTATION (RFQ): Quotes are due to the Contracting officer no later than 16:00 on 25 January 2021. Responses to this announcement will result in a Firm-Fixed Priced Requirement Contract. The Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining any and all amendments or additional information concerning this announcement at beta.sam.gov.
SOLICITATION QUESTIONS:
Questions pertaining to this announcement must be sent by email to Kenneth.Randle@va.gov. by no later than close of business, 18 January 2021. Telephone inquiries will not be accepted.
PRICE SCHEDULE: Contractor shall furnish all supervision, labor, equipment, tools, and materials necessary to provide grounds maintenance services (mowing, trimming, edging, trash / debris removal & fall leaf cleanup ,tree pruning & removal) to the Cape Canaveral National Cemetery located at 5525 U.S. Highway 1. Cape Canaveral , FL 32754. Services include mowing cemetery turf on a seven (7) day cycle, trimming upright and flat grave markers trimming of fence lines, curbs & trees, headstone cleaning, trash & debris removal and Fall leaf removal.
Term of Contract: The contract term shall be from February 4th, 2021 (or date of award – whichever is sooner) to February 3rd 2022 - This contract shall be awarded in the format of One (1) - 1-year Base Period and four (4) one-year options periods . All services described in the Work Statement, including technical specifications, schedules, addenda, clauses, terms and conditions of the contract shall form the complete scope of work.
The quantities of services specified in the Price Schedule are estimates only and are not purchased by this contract. The Government reserves the right to add additional line items related to cemetery grounds maintenance. Services can include emergency storm damage cleanup and snow removal. The Government will do so via a modification to the contract and SOW after obtaining fair and reasonable pricing from the contractor.
BASE YEAR (Date of Contract Award – February 3, 2022)
| CLIN |
| ITEM |
| EST. QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001 |
| Headstone Installation |
| 1500 |
| EA |
| 0002 |
| Headstone Cleaning - (Twice a Year) |
| 13,500 |
| EA |
| 0003 |
| Headstone Trimming (Weekly-48) |
| 324,000 |
| EA |
| 0004 |
| Cleaning – All Niche & Memorial Wall Markers (twice yearly) |
| 15,040 |
| EA |
| 0005 |
| Cleaning- Columbarium Walls including end Caps, Top Caps & Niche Markers-Columbarium A, Memorial Wall, including Ossuary, Flag Assembly Area Wall & Stage, and all concrete hard surfaces in these areas (Twice a year) |
| 2 |
| EA |
| 0006 |
| Phase II - Cleaning- Columbarium Walls to include end Caps, Top Caps & vacant Niche Markers-Columbarium B & C (Twice a year) (Estimated start date April 1, 2023) |
| 2 |
| EA |
| 0007 |
| Headstone fine tune adjustment |
| 100 |
| EA |
| 0008 |
| Headstone raise, lower, realign, reset and backfill |
| 100 |
| EA |
| 0009 |
| Headstones to be removed by the contractor and transported to the inscription area (R2 or disposal) |
| 250 |
| EA |
| 0010 |
| Sunken Grave Repair-Repair of damage turf. Top dressing/grade adjustment |
| 100 |
| EA |
| 0011 |
| Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds (approximately 65.0 acres) |
| 48 |
| WK |
| 0012 |
| Phase II - Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds. (approximately 20.0 acres) (Estimated start date April 1, 2023) |
| 48 |
| WK |
| 0013 |
| Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 65 acres) |
| 20 |
| JB |
| 0014 |
| Phase II - Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 20 |
| JB |
| 0015 |
| Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 114,800 square feet of hard surface and 13,834 linear feet of roads daily or as needed) |
| 12 |
| MO |
| 0016 |
| Phase II - Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 20,000 square feet of hard surface and 1,000 linear feet of roads daily or as needed (Estimated start date April 1, 2023) |
| 6 |
| MO |
| 0017 |
| Sweeping and Blowing off 32,000 sq. ft. of artificial turf at Administration office, Flag assembly area, Columbarium and Memorial wall |
| 12 |
| MO |
| 0018 |
| Remove, replace prep and supply (certified by sod farm) sod on casket gravesites (3 x 8 gravesites) |
| 650 |
| EA |
| 0019 |
| Remove, replace, prep and supply (certified by sod farm) sod on casket gravesites. (4 x 4 gravesites) |
| 1200 |
| EA |
| 0020 |
| Remove, replace, prep and supply (certified by sod farm) sod as needed on all non-burial turf areas |
| 30,000 |
| SQUARE FEET |
| 0021 |
| Landscape plant and Tree maintenance to include tree trimming, pruning, maintenance and debris removal of all trees on cemetery property including easements and rights-of-way. Weekly trimming, pruning, maintenance and debris removal of all plants in cemetery, including weeding of all planting beds (weekly basis) |
| 52 |
| JB |
| 0022 |
| Remove all trash and debris from roads, walkways, hard surfaces, burial sections, and committal shelters daily at the end of the workday |
| 12 |
| MO |
| 0023 |
| Removal of unauthorized & unsightly floral items weekly in accordance with cemetery regulations |
| 52 |
| WK |
| 0024 |
| Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and electrical wiring (approximately 65 acres) |
| 12 |
| MO |
| 0025 |
| Phase II - Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and maintenance of pump houses. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 25 |
| MO |
| 0026 |
| Daily janitorial service, maintenance & supplies (to include cleaning supplies, trash bags, paper towels, etc.) of Public Restrooms, and all visitor and employee areas of the Administrative and Maintenance Buildings (approximately 5500 square footage) |
Monday through Friday between the times of 8:00AM to 12:00PM.
| 0027 |
| Pressure wash all buildings including Administrative, Maintenance and 2 Committal Shelters including all concrete hard surfaces (Twice a year) |
| 2 |
| YR |
| 0028 |
| Clean columns and front entrance gate area |
| 4 |
| QR |
| 0029 |
| Clean all roadway curbing and split-rail concrete fencing |
| 1 |
| YR |
| 0030 |
| Transport Casket & Floral Arrangements from Committal Shelter to Gravesite |
| 700 |
| EA |
| 0031 |
| Transport Cremated Remains & Floral Arrangements from Committal Shelter to Gravesite |
| 1600 |
| EA |
| 0032 |
| Daily Committal Shelter set-up, cleaning (interior & exterior) and close-up each day (2 Shelters) |
| 500 |
| EA |
| 0033 |
| Holiday and weekend support for burials, transportation of casket and cremated remains and floral arrangements from Committal Shelter to gravesite |
| 80 |
| EA |
| 0034 |
| Clean Public Restrooms (Weekends & Holidays): |
Furnish all equipment, supplies, materials, Labor and supervision necessary to thoroughly Clean Public Restrooms on both Saturday & Sunday from 9:00AM to 11:00AM and on all Federal holidays from 9:00 AM to 11:00AM. Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day (July 4th), Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day.
| 0035 |
| Ceremony and Special Event support to include Set-up, tear down, clean-up and provide traffic control |
| 8 |
| EA |
| 0036 |
| Break and remove concrete headstone sockets as needed on urn vaults to ensure proper headstone alignment during headstone installation |
| 500 |
| EA |
| 0037 |
| Spray for weeds in natural tree save areas and along the fence lines |
| 46 |
| YR |
| 0038 |
| Install Pine Bark mulch in natural tree save areas (120,000 square feet) -*4” for base year* |
| 1 |
| YR |
| 0039 |
| Install Pine Bark mulch for all trees and planting beds once annually (1,910 cubic yards) |
| 1 |
| YR |
| 0040 |
| Phase II - Install pine bark mulch for all trees and planting beds once annually (100 cubic yards) (Estimated start date April 1, 2023) |
| 1 |
| YR |
Base Period - Total Estimated Price:
OPTION YEAR 1 (February 4, 2022 – February 3, 2023)
| CLIN |
| ITEM |
| EST. QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001 |
| Headstone Installation |
| 1500 |
| EA |
| 1002 |
| Headstone Cleaning - (Twice a Year) |
| 13,500 |
| EA |
| 1003 |
| Headstone Trimming (Weekly-48) |
| 324,000 |
| EA |
| 1004 |
| Cleaning – All Niche & Memorial Wall Markers (twice yearly) |
| 15,040 |
| EA |
| 1005 |
| Cleaning- Columbarium Walls including end Caps, Top Caps & Niche Markers-Columbarium A, Memorial Wall, including Ossuary, Flag Assembly Area Wall & Stage, and all concrete hard surfaces in these areas (Twice a year) |
| 2 |
| EA |
| 1006 |
| Phase II - Cleaning- Columbarium Walls to include end Caps, Top Caps & vacant Niche Markers-Columbarium B & C (Twice a year) (Estimated start date April 1, 2023) |
| 2 |
| EA |
| 1007 |
| Headstone fine tune adjustment |
| 100 |
| EA |
| 1008 |
| Headstone raise, lower, realign, reset and backfill |
| 100 |
| EA |
| 1009 |
| Headstones to be removed by the contractor and transported to the inscription area (R2 or disposal) |
| 250 |
| EA |
| 1010 |
| Sunken Grave Repair-Repair of damage turf. Top dressing/grade adjustment |
| 100 |
| EA |
| 1011 |
| Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds (approximately 65.0 acres) |
| 48 |
| WK |
| 1012 |
| Phase II - Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds. (approximately 20.0 acres) (Estimated start date April 1, 2023) |
| 48 |
| WK |
| 1013 |
| Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 65 acres) |
| 20 |
| JB |
| 1014 |
| Phase II - Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 20 |
| JB |
| 1015 |
| Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 114,800 square feet of hard surface and 13,834 linear feet of roads daily or as needed) |
| 12 |
| MO |
| 1016 |
| Phase II - Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 20,000 square feet of hard surface and 1,000 linear feet of roads daily or as needed (Estimated start date April 1, 2023) |
| 6 |
| MO |
| 1017 |
| Sweeping and Blowing off 32,000 sq. ft. of artificial turf at Administration office, Flag assembly area, Columbarium and Memorial wall |
| 12 |
| MO |
| 1018 |
| Remove, replace prep and supply (certified by sod farm) sod on casket gravesites (3 x 8 gravesites) |
| 650 |
| EA |
| 1019 |
| Remove, replace, prep and supply (certified by sod farm) sod on casket gravesites. (4 x 4 gravesites) |
| 1200 |
| EA |
| 1020 |
| Remove, replace, prep and supply (certified by sod farm) sod as needed on all non-burial turf areas |
| 30,000 |
| SQUARE FEET |
| 1021 |
| Landscape plant and Tree maintenance to include tree trimming, pruning, maintenance and debris removal of all trees on cemetery property including easements and rights-of-way. Weekly trimming, pruning, maintenance and debris removal of all plants in cemetery, including weeding of all planting beds (weekly basis) |
| 52 |
| JB |
| 1022 |
| Remove all trash and debris from roads, walkways, hard surfaces, burial sections, and committal shelters daily at the end of the workday |
| 12 |
| MO |
| 1023 |
| Removal of unauthorized & unsightly floral items weekly in accordance with cemetery regulations |
| 52 |
| WK |
| 1024 |
| Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and electrical wiring (approximately 65 acres) |
| 12 |
| MO |
| 1025 |
| Phase II - Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and maintenance of pump houses. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 25 |
| MO |
| 1026 |
| Daily janitorial service, maintenance & supplies (to include cleaning supplies, trash bags, paper towels, etc.) of Public Restrooms, and all visitor and employee areas of the Administrative and Maintenance Buildings (approximately 5500 square footage) |
Monday through Friday between the times of 8:00AM to 12:00PM.
| 1027 |
| Pressure wash all buildings including Administrative, Maintenance and 2 Committal Shelters including all concrete hard surfaces (Twice a year) |
| 2 |
| YR |
| 1028 |
| Clean columns and front entrance gate area |
| 4 |
| QR |
| 1029 |
| Clean all roadway curbing and split-rail concrete fencing |
| 1 |
| YR |
| 1030 |
| Transport Casket & Floral Arrangements from Committal Shelter to Gravesite |
| 700 |
| EA |
| 1031 |
| Transport Cremated Remains & Floral Arrangements from Committal Shelter to Gravesite |
| 1600 |
| EA |
| 1032 |
| Daily Committal Shelter set-up, cleaning (interior & exterior) and close-up each day (2 Shelters) |
| 500 |
| EA |
| 1033 |
| Holiday and weekend support for burials, transportation of casket and cremated remains and floral arrangements from Committal Shelter to gravesite |
| 80 |
| EA |
| 1034 |
| Clean Public Restrooms (Weekends & Holidays): |
Furnish all equipment, supplies, materials, Labor and supervision necessary to thoroughly Clean Public Restrooms on both Saturday & Sunday from 9:00AM to 11:00AM and on all Federal holidays from 9:00 AM to 11:00AM. Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day (July 4th), Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day.
| 1035 |
| Ceremony and Special Event support to include Set-up, tear down, clean-up and provide traffic control |
| 8 |
| EA |
| 1036 |
| Break and remove concrete headstone sockets as needed on urn vaults to ensure proper headstone alignment during headstone installation |
| 500 |
| EA |
| 1037 |
| Spray for weeds in natural tree save areas and along the fence lines |
| 46 |
| YR |
| 1038 |
| Install Pine Bark mulch in natural tree save areas (120,000 square feet) -*4” for base year* |
| 1 |
| YR |
| 1039 |
| Install Pine Bark mulch for all trees and planting beds once annually (1,910 cubic yards) |
| 1 |
| YR |
| 1040 |
| Phase II - Install pine bark mulch for all trees and planting beds once annually (100 cubic yards) (Estimated start date April 1, 2023) |
| 1 |
| YR |
Option Year 1 - Total Estimated Price:
OPTION YEAR 2 (February 4, 2023 – February 3, 2024)
| CLIN |
| ITEM |
| EST. QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001 |
| Headstone Installation |
| 1500 |
| EA |
| 2002 |
| Headstone Cleaning - (Twice a Year) |
| 13,500 |
| EA |
| 2003 |
| Headstone Trimming (Weekly-48) |
| 324,000 |
| EA |
| 2004 |
| Cleaning – All Niche & Memorial Wall Markers (twice yearly) |
| 15,040 |
| EA |
| 2005 |
| Cleaning- Columbarium Walls including end Caps, Top Caps & Niche Markers-Columbarium A, Memorial Wall, including Ossuary, Flag Assembly Area Wall & Stage, and all concrete hard surfaces in these areas (Twice a year) |
| 2 |
| EA |
| 2006 |
| Phase II - Cleaning- Columbarium Walls to include end Caps, Top Caps & vacant Niche Markers-Columbarium B & C (Twice a year) (Estimated start date April 1, 2023) |
| 2 |
| EA |
| 2007 |
| Headstone fine tune adjustment |
| 100 |
| EA |
| 2008 |
| Headstone raise, lower, realign, reset and backfill |
| 100 |
| EA |
| 2009 |
| Headstones to be removed by the contractor and transported to the inscription area (R2 or disposal) |
| 250 |
| EA |
| 2010 |
| Sunken Grave Repair-Repair of damage turf. Top dressing/grade adjustment |
| 100 |
| EA |
| 2011 |
| Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds (approximately 65.0 acres) |
| 48 |
| WK |
| 2012 |
| Phase II - Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds. (approximately 20.0 acres) (Estimated start date April 1, 2023) |
| 48 |
| WK |
| 2013 |
| Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 65 acres) |
| 20 |
| JB |
| 2014 |
| Phase II - Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 20 |
| JB |
| 2015 |
| Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 114,800 square feet of hard surface and 13,834 linear feet of roads daily or as needed) |
| 12 |
| MO |
| 2016 |
| Phase II - Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 20,000 square feet of hard surface and 1,000 linear feet of roads daily or as needed (Estimated start date April 1, 2023) |
| 6 |
| MO |
| 2017 |
| Sweeping and Blowing off 32,000 sq. ft. of artificial turf at Administration office, Flag assembly area, Columbarium and Memorial wall |
| 12 |
| MO |
| 2018 |
| Remove, replace prep and supply (certified by sod farm) sod on casket gravesites (3 x 8 gravesites) |
| 650 |
| EA |
| 2019 |
| Remove, replace, prep and supply (certified by sod farm) sod on casket gravesites. (4 x 4 gravesites) |
| 1200 |
| EA |
| 2020 |
| Remove, replace, prep and supply (certified by sod farm) sod as needed on all non-burial turf areas |
| 30,000 |
| SQUARE FEET |
| 2021 |
| Landscape plant and Tree maintenance to include tree trimming, pruning, maintenance and debris removal of all trees on cemetery property including easements and rights-of-way. Weekly trimming, pruning, maintenance and debris removal of all plants in cemetery, including weeding of all planting beds (weekly basis) |
| 52 |
| JB |
| 2022 |
| Remove all trash and debris from roads, walkways, hard surfaces, burial sections, and committal shelters daily at the end of the workday |
| 12 |
| MO |
| 2023 |
| Removal of unauthorized & unsightly floral items weekly in accordance with cemetery regulations |
| 52 |
| WK |
| 2024 |
| Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and electrical wiring (approximately 65 acres) |
| 12 |
| MO |
| 2025 |
| Phase II - Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and maintenance of pump houses. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 25 |
| MO |
| 2026 |
| Daily janitorial service, maintenance & supplies (to include cleaning supplies, trash bags, paper towels, etc.) of Public Restrooms, and all visitor and employee areas of the Administrative and Maintenance Buildings (approximately 5500 square footage) |
Monday through Friday between the times of 8:00AM to 12:00PM.
| 2027 |
| Pressure wash all buildings including Administrative, Maintenance and 2 Committal Shelters including all concrete hard surfaces (Twice a year) |
| 2 |
| YR |
| 2028 |
| Clean columns and front entrance gate area |
| 4 |
| QR |
| 2029 |
| Clean all roadway curbing and split-rail concrete fencing |
| 1 |
| YR |
| 2030 |
| Transport Casket & Floral Arrangements from Committal Shelter to Gravesite |
| 700 |
| EA |
| 2031 |
| Transport Cremated Remains & Floral Arrangements from Committal Shelter to Gravesite |
| 1600 |
| EA |
| 2032 |
| Daily Committal Shelter set-up, cleaning (interior & exterior) and close-up each day (2 Shelters) |
| 500 |
| EA |
| 2033 |
| Holiday and weekend support for burials, transportation of casket and cremated remains and floral arrangements from Committal Shelter to gravesite |
| 80 |
| EA |
| 2034 |
| Clean Public Restrooms (Weekends & Holidays): |
Furnish all equipment, supplies, materials, Labor and supervision necessary to thoroughly Clean Public Restrooms on both Saturday & Sunday from 9:00AM to 11:00AM and on all Federal holidays from 9:00 AM to 11:00AM. Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day (July 4th), Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day.
| 2035 |
| Ceremony and Special Event support to include Set-up, tear down, clean-up and provide traffic control |
| 8 |
| EA |
| 2036 |
| Break and remove concrete headstone sockets as needed on urn vaults to ensure proper headstone alignment during headstone installation |
| 500 |
| EA |
| 2037 |
| Spray for weeds in natural tree save areas and along the fence lines |
| 46 |
| YR |
| 2038 |
| Install Pine Bark mulch in natural tree save areas (120,000 square feet) -*4” for base year* |
| 1 |
| YR |
| 2039 |
| Install Pine Bark mulch for all trees and planting beds once annually (1,910 cubic yards) |
| 1 |
| YR |
| 2040 |
| Phase II - Install pine bark mulch for all trees and planting beds once annually (100 cubic yards) (Estimated start date April 1, 2023) |
| 1 |
| YR |
Option Year 2 - Total Estimated Price:
OPTION YEAR 3 (February 4, 2024 – February 3, 2025)
| CLIN |
| ITEM |
| EST. QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 3001 |
| Headstone Installation |
| 1500 |
| EA |
| 3002 |
| Headstone Cleaning - (Twice a Year) |
| 13,500 |
| EA |
| 3003 |
| Headstone Trimming (Weekly-48) |
| 324,000 |
| EA |
| 3004 |
| Cleaning – All Niche & Memorial Wall Markers (twice yearly) |
| 15,040 |
| EA |
| 3005 |
| Cleaning- Columbarium Walls including end Caps, Top Caps & Niche Markers-Columbarium A, Memorial Wall, including Ossuary, Flag Assembly Area Wall & Stage, and all concrete hard surfaces in these areas (Twice a year) |
| 2 |
| EA |
| 3006 |
| Phase II - Cleaning- Columbarium Walls to include end Caps, Top Caps & vacant Niche Markers-Columbarium B & C (Twice a year) (Estimated start date April 1, 2023) |
| 2 |
| EA |
| 3007 |
| Headstone fine tune adjustment |
| 100 |
| EA |
| 3008 |
| Headstone raise, lower, realign, reset and backfill |
| 100 |
| EA |
| 3009 |
| Headstones to be removed by the contractor and transported to the inscription area (R2 or disposal) |
| 250 |
| EA |
| 3010 |
| Sunken Grave Repair-Repair of damage turf. Top dressing/grade adjustment |
| 100 |
| EA |
| 3011 |
| Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds (approximately 65.0 acres) |
| 48 |
| WK |
| 3012 |
| Phase II - Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds. (approximately 20.0 acres) (Estimated start date April 1, 2023) |
| 48 |
| WK |
| 3013 |
| Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 65 acres) |
| 20 |
| JB |
| 3014 |
| Phase II - Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 20 |
| JB |
| 3015 |
| Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 114,800 square feet of hard surface and 13,834 linear feet of roads daily or as needed) |
| 12 |
| MO |
| 3016 |
| Phase II - Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 20,000 square feet of hard surface and 1,000 linear feet of roads daily or as needed (Estimated start date April 1, 2023) |
| 6 |
| MO |
| 3017 |
| Sweeping and Blowing off 32,000 sq. ft. of artificial turf at Administration office, Flag assembly area, Columbarium and Memorial wall |
| 12 |
| MO |
| 3018 |
| Remove, replace prep and supply (certified by sod farm) sod on casket gravesites (3 x 8 gravesites) |
| 650 |
| EA |
| 3019 |
| Remove, replace, prep and supply (certified by sod farm) sod on casket gravesites. (4 x 4 gravesites) |
| 1200 |
| EA |
| 3020 |
| Remove, replace, prep and supply (certified by sod farm) sod as needed on all non-burial turf areas |
| 30,000 |
| SQUARE FEET |
| 3021 |
| Landscape plant and Tree maintenance to include tree trimming, pruning, maintenance and debris removal of all trees on cemetery property including easements and rights-of-way. Weekly trimming, pruning, maintenance and debris removal of all plants in cemetery, including weeding of all planting beds (weekly basis) |
| 52 |
| JB |
| 3022 |
| Remove all trash and debris from roads, walkways, hard surfaces, burial sections, and committal shelters daily at the end of the workday |
| 12 |
| MO |
| 3023 |
| Removal of unauthorized & unsightly floral items weekly in accordance with cemetery regulations |
| 52 |
| WK |
| 3024 |
| Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and electrical wiring (approximately 65 acres) |
| 12 |
| MO |
| 3025 |
| Phase II - Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and maintenance of pump houses. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 25 |
| MO |
| 3026 |
| Daily janitorial service, maintenance & supplies (to include cleaning supplies, trash bags, paper towels, etc.) of Public Restrooms, and all visitor and employee areas of the Administrative and Maintenance Buildings (approximately 5500 square footage) |
Monday through Friday between the times of 8:00AM to 12:00PM.
| 3027 |
| Pressure wash all buildings including Administrative, Maintenance and 2 Committal Shelters including all concrete hard surfaces (Twice a year) |
| 2 |
| YR |
| 3028 |
| Clean columns and front entrance gate area |
| 4 |
| QR |
| 3029 |
| Clean all roadway curbing and split-rail concrete fencing |
| 1 |
| YR |
| 3030 |
| Transport Casket & Floral Arrangements from Committal Shelter to Gravesite |
| 700 |
| EA |
| 3031 |
| Transport Cremated Remains & Floral Arrangements from Committal Shelter to Gravesite |
| 1600 |
| EA |
| 3032 |
| Daily Committal Shelter set-up, cleaning (interior & exterior) and close-up each day (2 Shelters) |
| 500 |
| EA |
| 3033 |
| Holiday and weekend support for burials, transportation of casket and cremated remains and floral arrangements from Committal Shelter to gravesite |
| 80 |
| EA |
| 3034 |
| Clean Public Restrooms (Weekends & Holidays): |
Furnish all equipment, supplies, materials, Labor and supervision necessary to thoroughly Clean Public Restrooms on both Saturday & Sunday from 9:00AM to 11:00AM and on all Federal holidays from 9:00 AM to 11:00AM. Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day (July 4th), Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day.
| 3035 |
| Ceremony and Special Event support to include Set-up, tear down, clean-up and provide traffic control |
| 8 |
| EA |
| 3036 |
| Break and remove concrete headstone sockets as needed on urn vaults to ensure proper headstone alignment during headstone installation |
| 500 |
| EA |
| 3037 |
| Spray for weeds in natural tree save areas and along the fence lines |
| 46 |
| YR |
| 3038 |
| Install Pine Bark mulch in natural tree save areas (120,000 square feet) -*4” for base year* |
| 1 |
| YR |
| 3039 |
| Install Pine Bark mulch for all trees and planting beds once annually (1,910 cubic yards) |
| 1 |
| YR |
| 3040 |
| Phase II - Install pine bark mulch for all trees and planting beds once annually (100 cubic yards) (Estimated start date April 1, 2023) |
| 1 |
| YR |
Option Year 3 - Total Estimated Price:
OPTION YEAR 4 (February 4, 2025 – February 3, 2026)
| CLIN |
| ITEM |
| EST. QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 4001 |
| Headstone Installation |
| 1500 |
| EA |
| 4002 |
| Headstone Cleaning - (Twice a Year) |
| 13,500 |
| EA |
| 4003 |
| Headstone Trimming (Weekly-48) |
| 324,000 |
| EA |
| 4004 |
| Cleaning – All Niche & Memorial Wall Markers (twice yearly) |
| 15,040 |
| EA |
| 4005 |
| Cleaning- Columbarium Walls including end Caps, Top Caps & Niche Markers-Columbarium A, Memorial Wall, including Ossuary, Flag Assembly Area Wall & Stage, and all concrete hard surfaces in these areas (Twice a year) |
| 2 |
| EA |
| 4006 |
| Phase II - Cleaning- Columbarium Walls to include end Caps, Top Caps & vacant Niche Markers-Columbarium B & C (Twice a year) (Estimated start date April 1, 2023) |
| 2 |
| EA |
| 4007 |
| Headstone fine tune adjustment |
| 100 |
| EA |
| 4008 |
| Headstone raise, lower, realign, reset and backfill |
| 100 |
| EA |
| 4009 |
| Headstones to be removed by the contractor and transported to the inscription area (R2 or disposal) |
| 250 |
| EA |
| 4010 |
| Sunken Grave Repair-Repair of damage turf. Top dressing/grade adjustment |
| 100 |
| EA |
| 4011 |
| Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds (approximately 65.0 acres) |
| 48 |
| WK |
| 4012 |
| Phase II - Turf maintenance to include mowing of turf-grass “Celebration” Bermuda-grass, trimming and edging grass along roadways, fences and landscape/plant beds. (approximately 20.0 acres) (Estimated start date April 1, 2023) |
| 48 |
| WK |
| 4013 |
| Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 65 acres) |
| 20 |
| JB |
| 4014 |
| Phase II - Lawn Maintenance of “Celebration” Bermuda-grass to include fertilization, aeration, herbicide, weed & disease control, and pest control. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 20 |
| JB |
| 4015 |
| Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 114,800 square feet of hard surface and 13,834 linear feet of roads daily or as needed) |
| 12 |
| MO |
| 4016 |
| Phase II - Sweeping or blowing off all roads and walkways as required, hard surfaces; Edging (all curbs, walkway) (Approximately 20,000 square feet of hard surface and 1,000 linear feet of roads daily or as needed (Estimated start date April 1, 2023) |
| 6 |
| MO |
| 4017 |
| Sweeping and Blowing off 32,000 sq. ft. of artificial turf at Administration office, Flag assembly area, Columbarium and Memorial wall |
| 12 |
| MO |
| 4018 |
| Remove, replace prep and supply (certified by sod farm) sod on casket gravesites (3 x 8 gravesites) |
| 650 |
| EA |
| 4019 |
| Remove, replace, prep and supply (certified by sod farm) sod on casket gravesites. (4 x 4 gravesites) |
| 1200 |
| EA |
| 4020 |
| Remove, replace, prep and supply (certified by sod farm) sod as needed on all non-burial turf areas |
| 30,000 |
| SQUARE FEET |
| 4021 |
| Landscape plant and Tree maintenance to include tree trimming, pruning, maintenance and debris removal of all trees on cemetery property including easements and rights-of-way. Weekly trimming, pruning, maintenance and debris removal of all plants in cemetery, including weeding of all planting beds (weekly basis) |
| 52 |
| JB |
| 4022 |
| Remove all trash and debris from roads, walkways, hard surfaces, burial sections, and committal shelters daily at the end of the workday |
| 12 |
| MO |
| 4023 |
| Removal of unauthorized & unsightly floral items weekly in accordance with cemetery regulations |
| 52 |
| WK |
| 4024 |
| Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and electrical wiring (approximately 65 acres) |
| 12 |
| MO |
| 4025 |
| Phase II - Irrigation Maintenance - Perform testing, oversight, maintenance, and repairs of irrigation system to include sprinkler heads, lines, valves, irrigation boxes & covers, control boxes, weekly zone testing, and maintenance of pump houses. (approximately 20 acres) (Estimated start date April 1, 2023) |
| 25 |
| MO |
| 4026 |
| Daily janitorial service, maintenance & supplies (to include cleaning supplies, trash bags, paper towels, etc.) of Public Restrooms, and all visitor and employee areas of the Administrative and Maintenance Buildings (approximately 5500 square footage) |
Monday through Friday between the times of 8:00AM to 12:00PM.
| 4027 |
| Pressure wash all buildings including Administrative, Maintenance and 2 Committal Shelters including all concrete hard surfaces (Twice a year) |
| 2 |
| YR |
| 4028 |
| Clean columns and front entrance gate area |
| 4 |
| QR |
| 4029 |
| Clean all roadway curbing and split-rail concrete fencing |
| 1 |
| YR |
| 4030 |
| Transport Casket & Floral Arrangements from Committal Shelter to Gravesite |
| 700 |
| EA |
| 4031 |
| Transport Cremated Remains & Floral Arrangements from Committal Shelter to Gravesite |
| 1600 |
| EA |
| 4032 |
| Daily Committal Shelter set-up, cleaning (interior & exterior) and close-up each day (2 Shelters) |
| 500 |
| EA |
| 4033 |
| Holiday and weekend support for burials, transportation of casket and cremated remains and floral arrangements from Committal Shelter to gravesite |
| 80 |
| EA |
| 4034 |
| Clean Public Restrooms (Weekends & Holidays): |
Furnish all equipment, supplies, materials, Labor and supervision necessary to thoroughly Clean Public Restrooms on both Saturday & Sunday from 9:00AM to 11:00AM and on all Federal holidays from 9:00 AM to 11:00AM. Federal Holidays: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day (July 4th), Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas Day.
| 4035 |
| Ceremony and Special Event support to include Set-up, tear down, clean-up and provide traffic control |
| 8 |
| EA |
| 4036 |
| Break and remove concrete headstone sockets as needed on urn vaults to ensure proper headstone alignment during headstone installation |
| 500 |
| EA |
| 4037 |
| Spray for weeds in natural tree save areas and along the fence lines |
| 46 |
| YR |
| 4038 |
| Install Pine Bark mulch in natural tree save areas (120,000 square feet) -*4” for base year* |
| 1 |
| YR |
| 4039 |
| Install Pine Bark mulch for all trees and planting beds once annually (1,910 cubic yards) |
| 1 |
| YR |
| 4040 |
| Phase II - Install pine bark mulch for all trees and planting beds once annually (100 cubic yards) (Estimated start date April 1, 2023) |
| 1 |
| YR |
Option Year 4 - Total Estimated Price:
Base & 4 Option Years - Total Estimated Price:
Base Period - Total Estimate
Option Year 1 - Total Estimated
Option Year 2 - Total Estimated
Option Year 3 - Total Estimated
Option Year 4 - Total Estimated
Base & 4 Option Years - Total Estimate
B.2 PRICE SCHEDULE
The contractor shall provide all labor, materials, equipment, tools and supervision necessary to accomplish the deliverables described in the Statement of Work, except as may otherwise be specified to maintain Cape Canaveral National Cemetery, 5525 US Highway 1, Mims, Florida, 32754, within all National Cemetery Administration standards (available from the national cemetery).
The contract period shall consist of a base period from Date of Contract Award through February 3, 2022, with up to four (4) one-year options to extend the term of the contract through February 3, 2026 if exercised.
Units and services shall be in accordance with the attached work statement, technical specifications, terms and conditions contained in their solicitation. The contractor’s offer shall include a unit price for each Contract Line Item Number (CLIN), a total price for the estimated quantity of each and a sub total price for all estimated services in the contract base year and each contract option year. Unit prices given under this request for proposals shall be all inclusive containing unit prices for materials, unit prices for labor, any labor burden or fringes, any associated travel costs, profit, overhead, and of the like. Evaluation for award purposes will be based on total aggregate price. Therefore, offerors shall submit a price for Base Year and each Option Year. Failure to submit an offer on each year may cause an offer to be found non-responsive and be rejected.
B.3 PRICE SCHEDULE
1. GENERAL INFORMATION:
a. This is a service contract for cemetery grounds and facilities maintenance services at Cape Canaveral National Cemetery, Cape Canaveral , FL and hereafter referred to as “Cemetery”. The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities described herein, which are required to maintain an acceptable appearance of the cemetery grounds.
b. National cemeteries are a resting place for our nation’s heroes and as such, the standards for management, maintenance and appearance of these cemeteries have been established by the National Cemetery Administration (NCA) to reflect this nation’s concern and respect for those interred there. The NCA mission: The NCA honors veterans with a final resting place and lasting memorials that commemorate their service to our nation.
2. INTRODUCTION:
This Performance Work Statement describes the basic objectives of Cape Canaveral National Cemetery. The Performance Based Service Contract provides potential offerors the flexibility to develop cost effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the offeror's understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained on the Statement of Work that the Government traditionally provides to prospective offerors.
3. BACKGROUND:
Cape Canaveral National Cemetery is located in Leon County, Cape Canaveral (Scottsmoor), FL The cemetery’s anticipated burial rate will be 400-500 a year. National cemeteries are National Shrines, and as such the standards of maintenance and appearance at these cemeteries must reflect this nation’s concern for those interred there. For this reason, strict adherence to the specifications is required as well as NCA standards.
4. DESCRIPTION OF SERVICES:
The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Cape Canaveral National Cemetery in a manner that will maintain healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance throughout. Services include, but are not limited to maintenance of grounds, regular mowing, weed eating, removal of leaves and debris, as well as, sweeping or blowing off roads and sidewalks, maintenance of gravesites and headstones, and the alignment and washing of headstones, headstone maintenance, turf maintenance, plant and tree maintenance, sunken grave repair, trash removal, and janitorial services. All work will be done during the cemetery’s normal Federal workdays and hours (8:00 a.m. – 4:30 p.m.) with the exception to rare after hour and weekend occurrences. The cemetery is not closed more than two consecutive days therefore a weekend and holiday burial schedule will be provided by the cemetery.
5. PROGRAM OBJECTIVES:
a. The Contractor shall be responsible for full management of the facility’s maintenance services described herein. The Government’s objectives are described in the NCA’s “Operational Standards and Measures” contained in Exhibit C. The Contractor shall develop a “Performance Work Plan” that contains solutions to accomplish the same objectives as stated in the NCA “Operational Standards and Measures”, as they are applicable to the services required in the Schedule. The Contractor may use whatever method he/she chooses to meet the objectives, as long as it is dignified, professional, and the end result satisfies the minimum acceptable levels of performance.
b. The Contractor shall be responsible for:
i. Providing all grounds maintenance services including, but not limited to: Maintenance of grounds, regular mowing, edging, trimming, removal of leaves and debris, as well as, sweeping or blowing off roads and sidewalks, and trash removal.
ii. Turf Maintenance: Proper fertilizing, weeding, and sodding of turf.
iii. Turf surrounding a headstone or marker is trimmed to its recommended height.
iv. Plant and Tree Maintenance.
v. Maintenance of gravesites and headstones.
vi. Headstone cleaning and maintenance.
vii. Sunken grave repair.
viii. Provide a safe working environment for Contractor, cemetery staff and general public.
ix. Clean and sanitize public restrooms.
x. Clean PIC/administration and maintenance building to include offices, lunchroom, honor guard building and all restrooms.
xi. Ensuring all work conforms to the NCA’s established National Standards & Measures.
xii. Irrigation Maintenance.
6. CONTRACT OBJECTIVES:
a. To use an innovative and creative technical approach to manage the cemetery facilities maintenance operations at Cape Canaveral National Cemetery in order to maintain the high standards of appearance as a National Shrine, in accordance with standard commercial practices and the NCA’s “Operational Standards and Measures” (Version 5.1, July 2014).
b. To have the Contractor propose a business solution using performance based contracting techniques with incentives and disincentives designed to reward superior performance.
c. Specifically, the Contractor shall establish a performance plan focusing on criteria such as healthy grass, trees, shrubs, and plants and a clean, neat and professional appearance overall. The plan will include a performance work schedule, list of materials the contractor plans to use, labor and a quality control plan to monitor the contractor’s performance in meeting the cemetery goals.
d. The minimum life of the contract should be one base period with options to extend the term of the contract up to four (4) additional years. The maximum life of the contract, including any options, shall not exceed five (5) years.
7. STANDARDS OF EMPLOYEE CONDUCT:
a. Contractor and Contractor personnel shall be required to adhere to the following standards of dress and conduct while performing work in the national cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 901.
b. Be fully clothed at all times, including long slacks or pants and shirt, buttoned up from neck to waist. Clothing shall be clean each day. Any soiled clothing should be cemetery work-related that day. T-shirts and/or tank tops as outer garments are prohibited. Shoes/boots will have no holes or loose soles. Steel-toed shoes or boots will be required in accordance with OSHA requirements. Contractor employees will maintain personal hygiene.
c. Shall not engage in loud or boisterous behavior or use profane or abusive language and will show proper reverence during committal services.
d. Shall neither eat nor drink beverages (except water or non-alcoholic drinks) in the work areas, nor in site of committal shelter during a service. Use of intoxicating beverages and/or drugs is strictly prohibited.
e. Contractor personnel shall not lean, sit or stand on or against headstones or monuments. No tools, equipment or other items will be placed or leaned on headstones or monuments.
f. The only designated smoking area for Cape Canaveral National Cemetery is located by the maintenance building. All other areas are designated as NO SMOKING. Contractor can work with cemetery director to select an appropriate location in contractor yard however a fire safe & appropriate container must be utilized. All individuals must ensure safety and be out of public view.
8. PARKING AND VA REGULATIONS:
Contractor employees may park privately owned vehicles in the area designated for parking by the COR. It is the responsibility of the Contractor to ensure employees park in the appropriate designated parking areas. The Cemetery will not invalidate or make reimbursement for parking violations of the Contractor’s employees under any conditions. Smoking is prohibited inside any buildings at the Cemetery. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
9. USE OF CEMETERY FACILITIES:
a. The Government shall not be responsible for any loss, damage, or theft of Contractor items. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
b. The Government will furnish 3-bay building in the maintenance yard area that the contractor can use for storage of supplies and equipment during the life of the contract. All utilities in this area are the responsibility of the contractor. The Government will not be responsible for any damage to or loss of the Contractor's equipment and supplies stored on the Government's premises. The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment.
c. The Contractor will be responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, etc., in accordance with manufacturer’s recommendations. An SDS (Safety Data Sheet) is required for all chemicals, pesticides, herbicides and cleaning solutions. A copy of all SDS documents shall also be provided to the COR on a quarterly basis or when any change in chemicals, etc., is made.
d. d. Electric and Phone service will NOT be furnished by the Government for the contractor’s work area.
10. INSPECTION AND CLEANING OF CEMETERY FACILITIES:
a. The Contractor will perform a daily inspection as well as a weekly final. During this inspection the appearance of the cemetery will be observed, and any deficiencies noted within the scope of the contract will be corrected as soon as practicable. Items that need correcting outside the scope of the contract will be reported to the Contracting Officer or his or her representative.
b. The Contractor will be required to submit a daily activity report along with weekly inspection reports and work accomplished to the COR. The COR is located at Cape Canaveral National Cemetery.
11. SUPERVISION AND TRAINING:
a. The Contractor shall provide a supervisor who speaks fluent English on site at all times.
b. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor shall remove employees for cause, to include, but not limited to, misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government.
c. Contractor is responsible for providing their employees with a restroom (port-o-lets), wash station and break room as well as the maintenance of these facilities. Government facilities will not be utilized for these functions.
d. The Contractor shall be responsible for training and safety precautions for Contractor employees performing work under these specifications. OSHA standards shall be observed by the Contractor in all work performed. Appropriate safety equipment shall be furnished by the Contractor to Contractor personnel and shall be used as prescribed by OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices. The following OSHA and NFPA standards and codes are to be adhered to:
i. National Fire Protection Association (NFPA): 10-1998 Standard for Portable Fire Extinguishers
ii. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical Safety and Portable Electric Equipment.
iii. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other…
This is the start of the file's text. The full file is on GovTribe.