36C78620R0029.docx

DOCX document 690 KB Posted

Attached to
9930--FY21 New - MPS Nationwide - OFF-SITE MANUFACTURE OF BLANK (U1) FOB ORIGIN
Solicitation number
36C78620R0029
Issued by

View the file

Other files

File Type Posted
36C78620R0029 0002 (Amendment).pdf PDF
36C78620R0029 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

7860-000249

36C78620R0029

Marcia Hall 706-630-9342 06-19-2020

43C1 Department of Veterans Affairs NCA Contracting Service

18434 Joplin Rd Triangle VA 22172

X

Y 327991 500 Employees

N/A

FOB ORIGIN

43C1 Department of Veterans Affairs NCA Contracting Service

18434 Joplin Rd Triangle, VA 22172

43C1 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

1-877-752-0900

See CONTINUATION Page

This solicitation is for Blank U1, Upright Headstones Base plus 3 option years, Solicitation, FOB Origin

Questions due by June 8, 2020 at 1:30 PM EST only to Marcia.Hall@va.gov NOT THROUGH THE VENDOR PORTAL

Quotes are due by June 19, 2020 at 1:30 PM EST AND MUST BE

SUBMITTED THROUGH EMAIL TO Marcia.Hall@va.gov

COR: TBD

Please fill this out:

DUNS:

EMAIL ADDRESS:

PHONE #:

See CONTINUATION Page

Contract Officer

Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS4
B.1 CONTRACT ADMINISTRATION DATA4
B.2 SCHEDULE OF PRICES5
B.3 STATEMENT OF WORK6
SECTION C - CONTRACT CLAUSES18
SBA ACT 8(d)(13)(B)18
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)18
C.2 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)22
C.3 52.216-18 ORDERING (OCT 1995)23
C.4 52.216-19 ORDER LIMITATIONS (OCT 1995)23
C.5 52.216-21 REQUIREMENTS (OCT 1995)23
C.6 52.216-22 INDEFINITE QUANTITY (OCT 1995)24
C.7 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)24
C.8 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)25
C.9 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018)25
C.10 VAAR 852.247-72 MARKING DELIVERABLES (OCT 2018)25
C.11 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018)26
C.12 VAAR 852.247-75 BILLS OF LADING (OCT 2018)26
C.13 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)27
C.14 VAAR 852.212-71 GRAY MARKET ITEMS (APR 2020)28
C.15 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (MAR 2020)28
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS34
Attachment 1Definitions34
Attachment 2Sample Review Form34
Attachment 3Government Bill of Lading34
Attachment 4Past Performance Questionnaire34
Attachment 5Contract Discrepancy Report (CDR)34
SECTION E - SOLICITATION PROVISIONS40
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (OCT 2018)40
E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)43
E.3 52.216-1 TYPE OF CONTRACT (APR 1984)43
E.4 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)43
E.5 INSTRUCTIONS TO OFFERORS-COMMERICIAL ITEMS49
Submission Information49
E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (MAR 2020)51

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer , Joselito Roman Department of Veterans Affairs NCA Contracting Service 18434 Joplin Rd Triangle VA 22172

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management,

3. INVOICES: Invoices shall be submitted in arrears:

Other [X] monthly after acceptance by Government

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

http://www.tungsten-network.com/customer-campaigns/veterans-affairs/

5. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

6. CONTENTS OF INVOICE:

1. Contractor Information (Name, Complete Address, Telephone Number, Taxpayer Identification Number)

1. Date of Invoice

1. Date of Period of Invoice Performance

1. Invoice Number

1. Obligation/Invoice Number (Only one purchase order may be included on each invoice submitted)

1. Cemetery Name

1. Unit Cost

1. Total Invoice Amount

1. Service/Item(s) provided

6. SOLICITATIONS:

Failure to submit all required documentation as required may result in your submission being determined non-responsive and removed from further consideration.

8. MISSING PAGES:

It is the responsibility of the offeror to examine this solicitation to verify that he or she has received all pages. In addition, in compiling this package, some pages may have been duplicated. If the offeror feels that pages are missing or duplicated, the offeror is encouraged to contact the Contracting Officer at the telephone number shown in Block 7B, Standard Form 1449, Solicitation / Contract / Order for Commercial Items.

9. TIME OF DELIVERY:

Work is to be performed Monday through Friday, 8:00 a.m. – 4:30 p.m., except Federal Holidays.

10. POST AWARD CONFERENCE:

Prior to commencement of work, contract awardee and a representative of all subcontractors are required to attend a post award conference with Contracting Officer’s Representative and Contracting Officer/Specialist to assure that all parties understand all contractual obligations and the role that each party serves.

11. GOVERNMENT HOLIDAYS:

Holidays observed by the Federal Government:

New Year's Day1 January
Martin Luther King's BirthdayThird Monday in January
President's DayThird Monday in February
Memorial DayLast Monday in May
Independence Day4 July
Labor DayFirst Monday in September
Columbus DaySecond Monday in October
Veterans Day11 November
Thanksgiving Day4th Thursday in November
Christmas Day25 December

If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also included would be any day specifically declared by the President of the United States of America as a national holiday.

B.2 SCHEDULE OF PRICES

The term of the contract shall be from October 1, 2020 to September 30, 2021 and 3 Option Years if exercised.

BASE YEAR: October 1, 2020 to September 30, 2021

CLIN
DESCRIPTION
EST QUANTITY
UNIT
UNIT PRICE
EST TOTAL PRICE

Base Year

0001
U1, Headstone, Marble, Upright, Blank (13” x 42” x 4”)
35,000
EA

Option Year 1

1001
U1, Headstone, Marble, Upright, Blank (13” x 42” x 4”)
36,500
EA

Option Year 2

2001
U1, Headstone, Marble, Upright, Blank (13” x 42” x 4”)
37,500
EA

Option Year 3

3001
U1, Headstone, Marble, Upright, Blank (13” x 42” x 4”)
38,500
EA

CONTRACT ESTIMATED TOTAL

Each CLIN shall be priced in total for labor, materials, overhead and other items.

Price Breakdown by %:

Stone

EA

Labor

EA

TOTAL
100%

36C78620Q0255

Page 1 of Page 1 of

B.3 STATEMENT OF WORK

STATEMENT OF WORK/SPECIFICATION

1.0 Background

The Department of Veterans Affairs (VA), National Cemetery Administration (NCA) furnishes headstones, markers and niche covers (monuments) for deceased veterans worldwide. Memorial monuments are also furnished to memorialize veterans whose remains are non-recoverable.

2.0 Purpose

The purpose of this contract is to manufacture and distribute nationwide, blanks in support of on-site inscription programs that are resident in National and State cemeteries (Cemetery List):

· (U1) – Upright Headstone, Marble, Blank (13” x 42” x 4”)

3.0 General

This contract shall include all labor and materials necessary to furnish upright marble headstones, as noted in 2.0, to each consignee’s address. The Contractor shall be responsible for providing all labor and material needed to manufacture, package, palletize, and deliver FOB Origin.

· Provide all labor and material needed to package and palletize shipments of blank headstones.

· Shipments shall be F.O.B. Origin, Contractor’s facility, utilizing Government contracted carriers.

· The Contractor shall provide a preprinted copy of a completed Government Bill of Lading for each cemetery to the Memorial Program Office (MPS) Traffic Manager by the first Monday of each month which lists the following: Destination Name & Address, Consignee’s Name & Address, Origin Name & Address, Shipper’s Name & Address, and Bill-Charges- To name Address, Quantity of the shipment, Item Description, Weight, Mass, and Estimated Shipment Value.

· Contractor shall be responsible for ensuring the shipments are ready for pick-up at the time of notification

· Provide all labor and equipment to load pallets or singles onto the carrier’s vehicle.

· The Contractor will provide email notification within 24 hours if carriers fail to pick up as arranged.

3.1 Performance period: The Contractor shall have until the second Monday, excluding federal holidays, of each month to manufacture, package and transfer to a government transportation carrier each pre-scheduled shipment for delivery. All shipments must be able to be loaded and shipped by the second week of each month.

3.2 Unit Price: The unit price is all-inclusive and covers the completed monuments delivered FOB Origin. This all-inclusive price includes product and services to provide monuments meeting technical requirements as shown in drawings listed in Sections 4.0 and 5.1.

4.0 Material Specification

4.1 Description: Upright Headstone, Marble, Blank (13” x 42” x 4”)

4.1.1 Product Code: U1

4.1.2 Drawing No.: A-U1, Rev. 1, dated 09/04/19

4.2 Material: Marble shall be sound and compact, free from cracks, spalls, chips, holes, calcite lines more than two inches in length, open seams, pits or other defects that would impair its strength, durability or appearance.

4.3 Color: The overall color of the marble exclusive of allowable coloration shall be (N8.5 or higher) judged against the Munsell Neutral Value Scale, Matte 31 – step scale. Various colored veins, no darker than N6 of the Munsell Neutral Value Scale, may blend gradually into the white background. Blotches of color or veining which are in sharp contract with the background whiteness, which would inhibit legibility of the inscription, or which present an objectionable appearance, shall be cause for rejection. Traits causing unacceptable appearance in the top 14” of the marker include:

· marble with multiple, long, straight streaks;

· colors which appear as draining or dripping down the stone;

· coloring which would be mistaken for black microbial growth or, markings which would be mistaken for dirt;

· marble with veining of blatantly dissimilar material susceptible to differential weathering;

· lines likely to be misinterpreted as cracks;

· broad dark markings or splotches that interfere with legibility or that create a strong visual distraction (e.g., resembling paint splatter) ---regardless of where the distraction is located;

· marble which lack a dominant background color (more than 33% is color of veins);

· marble having 5 or more veins that are greater than 1-1/3 inches thick;

· marble having wide (other than pencil-mark thin) veins which do not gradually blend with the background color;

· marble with horizontally oriented veining haphazardly missed with other orientations. Veining should occur across the stone primarily following the long vertical dimension or slanted by as much as ± 45 degrees from the vertical.

4.4 Finishing: The front, top and sides of each headstone shall be uniformly machine honed with an 80-grit pad, or stone, to a smooth satin finish, free of scratches, saw marks, rust spots and skips. The bottom shall be a smooth sawn finish. The edges of the top and sides shall have no more than 1/4” radius ± 1/16”

4.5 Source of supply: All stone shall be obtained from quarries within the United States having adequate capacity and facilities to meet the specified requirements. Cutting and finishing shall be done by a manufacturer equipped to process the material promptly and in accordance with these specifications.

NOTE: If the Contractor desires to change from the original approved quarry to another listed quarry (ref. 4.8) during the contract term, a request justifying change and a sample (13” x 24” ¾”) that represents the marble from the new quarry must be submitted to the MPS Program Support Unit for approval prior to using the new stone to produce blanks. MPS will have 30 days to evaluate the request and the sample. Upon review and evaluation, MPS Program Support Unit will provide Contracting Services with the findings and recommendation. If a request is denied, a detailed letter of explanation will be forwarded to the Contractor.

Quarry changes will be effective at the beginning of option years based upon pre-approved samples. Changes cannot be made within a year

4.6 Workmanship: Each monument shall be free from defects in workmanship.

· Chips, cracks, open seams, or abraded edges shall not be permitted and the repair or patching of any such defects is prohibited and shall be cause for rejection.

· Monuments shall be free of ink, oil, crayon marks, dirt, coatings, sealers and stone dust.

· Workmanship and production shall be in accordance with industry standards, practices, and regulatory safety requirements

4.7 Testing: Stone supplied under this contract shall conform to the following specifications and physical requirements. Stone shall be tested, as listed below, by an approved testing laboratory and test results shall be submitted to the Memorial Products Service (MPS), Program Support Unit for approval prior to the production of the sample. Testing is required only once and shall be from a representative sample of the quarry. Testing results are required for new sources of stone.

Blasting Grit If used, Contractor should know that this material is on the EPA’s list of designated products for post-consumer content and recovered materials content therefore Contractor shall comply with the published recommendations.

NOTE: Testing results are not required for sources in the following areas:

· Marble Valley, Coosa County, Alabama

· Marble, Gunnison County, Colorado

· Madera County, California

· Danby, Rutland County, Vermont

· Tate, Pickens County, Georgia

5.0 Marble Testing Specifications

5.1.1 Abrasive hardness:

Marble shall have an abrasive hardness value Ha of 10.0 minimum, when tested as specified by ASTM C241.

5.1.2 Absorption:

Marble absorption shall be 0.15 percent maximum, by weight when tested for a 48-hour period as specified in ASTM C97.

5.1.3 Compressive strength:

Marble shall have a minimum compressive strength of 7,500 psi when tested as specified in ASTM C170.

5.1.4 Modulus of rupture:

Marble shall have a minimum modulus of rupture of 1000psi when tested as specified in ASTM C99.

5.2 Applicable Publications

5.2.1 Munsell Neutral Value Scale, Matte (31 - step scale)

617 Little Britain Road, New Windsor, NY Refer to X-Rite, Inc or Pantone LLC for Munsell Color Scale

5.2.2 ASTM, Sections C97, C99, C170, C241

American Society for Testing and Materials 100 Barr Harbor Drive PO Box C700 West Conshohocken, PA 19428-2959

5.2.3 Dimension Stones of the World

Marble Institute of America (MIA + BSI) 380 E. Lorain Street, Oberlin, OH 44074

6.0 Submittal by Potential Offerors

Potential offerors shall submit at Contractor expense one down sized blank “U1” sample (13” x 24” x 3/4”) representative of the marble to be used in the production of headstones under the contract to the address listed below. The marble sample shall conform to government specifications to include top crown, radiused edges, etc. The sample shall be marked on the back with a permanent marker to show Contractor’s name, telephone number, solicitation number, and email address. Any sample not properly marked, or which arrives damaged shall not be accepted and excluded from further consideration.

All samples are best and final, and the offerors will not be allowed to submit another sample if a sample is deemed unacceptable.

The sample must be manufactured and packaged to prevent any damage during shipment. Samples must be accompanied by a statement identifying the brand name and grit rating for the pad or stone used to produce the final finish.

Failure to meet any of the requirements shall result in the rejection of the sample. The sample shall establish the acceptable product for material, finish and dimensions to be used in production; and shall be the basis for comparison of those products.

NO samples shall be accepted after the closing date.

Note: All samples should be manufactured using the dimensions noted above. Full size samples will NOT be accepted and will be refused at delivery.

Note: If a potential offeror submits multiple samples from different quarries, upon award of the contract, the Contractor must commit to one quarry for production. If the Contractor needs to transition to another quarry during the term of the contract, refer to 4.6 for process

Once submitted, samples become the property of the Department of Veterans Affairs and shall not be returned. Submit samples and test results, if required, to the following address:

Department of Veteran Affairs Memorial Products Service Program Support Unit, Rm. 600 1575 Eye Street, NW Washington, DC 20005

Results of the Sample Review shall be sent to offerors by the Contract Officer after the solicitation has closed. Do not contact the MPS CORS for a copy of the report or the result.

*If a sample fails to meet the sample requirements the offeror will be considered nonresponsive and no further consideration will be given to the offeror.

6.1 Drawings: PDF copies of drawings are available upon request at no additional charge to potential vendors. The request should be e-mailed to the NCA Memorial Programs Service (MPS) Program Support Unit at MPSProgSupport@va.gov and should include the Contractor’s name, mailing address, phone number, e-mail address and the name and drawing number of the drawing(s) requested. Vendors should refer to the drawings to ensure requirements are understood.

A potential vendor should e-mail the request for drawings to MPS early enough to ensure sufficient time for the drawings to be mailed and received. An extension to the solicitation’s closing date will not be granted for requests which do not allow sufficient lead time for receiving hard copies of the drawings.

7.0 Packaging and Palletizing

7.1 Materials: All monuments shall be packed in accordance with ANSI industry standards and commercial best practices to assure acceptance by the common carrier.

Nonmetal bands shall be secured around the pallet or crate for its entire height (from top to bottom) and two additional bands shall secure the pallet or crating around the width. Banding pressure shall be such that it causes no damage to the edges of the stone when packaged. Colored materials or materials capable of staining the stone (ex. uncoated cardboard, certain kinds of wood) during outdoor storage are not permitted.

The packaging and crating shall protect the monuments throughout the handling process and during shipment and comply with the National Motor Freight Classification:

· Ensure the pallet is in good, usable condition, i.e., no broken or cracked boards, all nail heads shall be below the surface of the wood and the pallet is made for heavy loads up to 2,300 lbs. with (3) stringers and 4-way access.

· The quantity of monuments that can be placed on the pallet shall depend on ANIS Standards, the pallet’s quality of build, material used and product-to-pallet dimensions.

· Ensure there is no product overhang. The pallet shall be taking the initial side impacts. Ensure that the pallet extends 1-2” away from the edges of the product.

· Corrugated board that is being used to wrap around the product shall be 350 PSI double wall corrugated board.

· Reinforce and protect edges of the monuments with corner fiber boards.

· Ensure shipments of multiple monuments are properly unitized and secured firmly to the pallet.

7.2 Palletizing: Each pallet shall not exceed 2,300 lbs. Headstones are to be shipped together on the same pallet, with sufficient non-steel banding in conjunction with stretch wrap along with individual packaging materials shall be used to prevent damage to the monuments during shipment. Banding shall be in cross-directional pairs, four per pallet ensuring that the banding is routed through the pallet to minimize any movement of the headstones while in transit. Non-staining corner cards are to be provided between the band and the monument at each corner of the banding (uncoated cardboard against the stone is unsatisfactory due to the tendency for discoloration). The following specifications shall be used in conjunction with standard 42” x 48”, 4-way wood pallets.

The weight of headstones placed on the pallet must not exceed 2,300lbs but, in all cases, shall not have more than (10) ten headstones per pallet. It is preferred that all headstones be placed on the pallet on their edges and not layered.

Protruding metal fasteners must be replaced to avoid tearing the packaging or scratching the monument surface.

The Contractor shall ensure non-coloring materials are used for packing and that packing materials are not prone to compression which may cause load shifts or damage from the ensuing loose banding.

The monuments shall be packed in such a manner that any adhesive, glue, or coloring from the packaging does not transfer and adhere to the stone during shipment or during interim storage prior to use. All monuments and packing material shall be contained within the dimensions of the pallet with no overhang.

The Contractor shall replace monuments at no additional cost to the Government if damage is incurred during transport. The MPS Program Support Unit reserves the right to notify the Contractor by email within 5 days of any headstones damaged during transportation. Upon notification, the Contractor shall replace the damaged monuments within ten (10) calendar days from the date the e-mail was sent by MPS to the Contractor.

Each side of a pallet shall be labeled with the words, HANDLE WITH CARE, in one-inch high red letters. Use of commercially available labels can be used for this requirement.

In addition, the Contractor shall ensure the commercial bill of lading is notated with the following statements:

· “the palletized headstones must be moved to the rear of the delivery vehicle to ensure the ability of the receiving business to offload the pallet using a forklift”.

· “In case of delivery problems: call (202)-461-4132 or 202 501 2696 for guidance and follow-up notification with email to MPSProgSupport@va.gov.

· Items damaged during transport must be reported by email to MPSProgSupport and the damaged items must be positively destroyed by the transporter or transporter’s agent. The Contractor shall document such monuments were, “… demolished or pulverized into small pieces and no portion of the inscription remained legible”.

7.3 Labeling: The Contractor shall provide a packing list or a shipping label for all packaged monuments. The label shall be at least five (5) inches wide by four (4) inches long with the Order Number, and Consignee name and address. Labels shall be completely adhered to the front of the package and shall be over-coated with transparent adhesive tape that completely covers the label to prevent removal, smearing or blurring of the information. Shipping labels shall not be covered or obscured in any way by individual packaging or banding materials that would make the labels unreadable.

8.0 Government Quality Assurance (QA)

8.1 Inspections: Quality assurance (QA) inspections of the Contractor’s manufacturing facility and products may be performed by the designated COR of the Memorial Programs Service to assure satisfactory contract performance. The Government reserves the right to inspect the quality of blanks without prior scheduling or notifications to the Contractor.

During each QA visit at production sites, a complete assessment of the Contractor’s operation shall be made, to include the following areas:

· Packaging and palletizing of product that promotes damage-free shipments and compliant with all contractual requirements.

· Execution of quality control procedures.

· Maintaining QA records as required, with the records indicating the quality of the headstones as shipped.

· The contractor’s handling of inventory or backlogged orders.

When at the Contractor’s production facility, the Contractor shall assist the designated COR by providing an adequate, well lighted inspection area. Contractor personnel must provide assistance lifting, handling and moving of product.

8.2 Quality System: The Contractor must develop and maintain a written inspection system that documents the quality and timeliness of finished products. The Contractor shall provide, to the designated COR of the MPS Program Support Unit, reports on the Contractor’s processing and delivery of orders to the carrier.

8.3 Quality Complaints

The receipt of complaints concerning unsatisfactory quality or non-compliance with the contract specifications shall be considered reason for an immediate visit and review of the Contractor’s quality assurance program. The Government reserves the right to inspect 100% of the production for an indefinite period due to quality problems. Indicative, but not all-inclusive, examples of issues meriting inspection are:

· Nonconforming product shipped to fill Government orders.

· The COR rejecting product that passed the Contractor’s inspection system, but product is still awaiting shipment.

· Deficiencies that adversely affect performance of the contract in areas such as:

o Inspection system o Inspection personnel o Manufacturing process o Production control o Planning and scheduling o Craftsmanship o Safety o Knowledge/training of processes and measuring tools The designated COR of the MPS Program Support Unit or a designated inspector for this contract shall inform the Contractor of the deficiencies. A site inspection report shall be generated by the inspecting COR and the COR shall discuss with the Contractor what corrective action(s) shall be taken and when the corrective action shall be taken. When an issue(s) arise regarding a monument not meeting the specified standards and the issue(s) cannot be resolved between the Contractor and the Government, the Contracting Officer shall make a final determination as to whether the monument shall be replaced at the contractor’s expense or at the Government’s expense.

8.4 Quality Complaints – Receipt Blank Shipments which are rejected Upon notification by MPS that a shipment of blank headstones has been rejected for not meeting contract specifications that are outlined in section 4.0 Material Specification of this contract, the contractor shall be required within (3) business days to pick up the rejected shipment at contractor’s expense. Replacements shall be delivered to the cemetery within 10 business days of the contractor’s notification. The Contractor is responsible for performing a quality check prior to palletizing and shipping to eliminate bulk shipment rejections.

9.0 Performance Evaluation

a. Normally, the COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.

b. If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.

c. When the Contractor is not meeting the acceptable limits of satisfactory performance, a Contractor Discrepancy Report (CDR) will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as the limits of satisfactory performance are exceeded.

d. When a CDR is issued for an order or series of orders, the Contracting Officer and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”. When a CDR is received, the Contractor shall complete the applicable fields. The Contracting Officer will evaluate the Contractor's response and determine the next course of action.

e. The issuance of a Contract Discrepancy Report (CDR), found in Attachments, may be cause for the scheduling of a meeting among the Contractor, Contracting Officer, and the COR. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, Contracting Officer, and the COR will sign the minutes of the meeting(s).

f. Should the Contractor not concur with the minutes, they will so state their objections in writing to the Contracting Officer, within ten calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written. The Contracting Officer will notify the Contractor of the decision in writing within ten calendar days of submission of any objections.

g. After a CDR is completed and the vendor's plan accepted by the CO/MPS COR the vendor shall have 1 month to carry-out the plan. After 30 calendar days, if there are any examples of missed standards then a remedy shall apply.

h. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered including, but not limited to termination for default. If the Contractor only achieves a partial satisfactory performance by the end of the next period or agreed suspense date, other remedies including penalties may be applied.

10.0 Employee Requirements

a. The Contractor shall be responsible to ensure Contractor employees providing work on this contract are fully trained and completely competent to perform the required work. All work performed shall be done in accordance with good commercial practices.

b. Small Business set-aside: All of the awardee’s managerial/supervisory employees including those on site in supervisory roles shall be direct hires of the Prime Contractor. Labor shall be employed such that 50% of the actual salaries and wages for time attributed on this contract are from actual Prime Contractor employees.

c. Labor Force and Equipment: The Contractor shall be aware of the intensive labor and equipment requirements needed to meet contract specifications. Contractor shall be responsible to provide all labor and equipment as necessary to meet deadlines. The Contractor will provide all necessary resources to complete the efforts assigned under the scope of this contract.

11.0 Scheduled Quantity and Delivery Log

Upon contract award and the exercised of all option year renewals, the Contractor will receive an e-mail within 10 calendar days with the following information.

1. Instruction stated in section 3.0 and 3.1

2.Contract number
3.Obligation number for the contract period
4.Table with a list of Cemeteries and quantities for each month of the contract period

Upon release of a shipment to a Government carrier the Contractor will send an e-mail to the MPSPROGSUPPORT@VA.GOV confirming pick up along with a copy of the bill of lading signed by the carrier and Contractor. Any shipment not picked up by the scheduled date, should be reported to the Traffic Manager for non-compliance.

12.0 Government Carrier and Bills of Lading

Please see the attached Government Bill of Lading.

13.0 Procedures (Administrative and Other)

13.1 Government Responsibilities: Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract shall require coordination between the Government and the Contractor. Contracting Services shall provide, at the time of the contract’s award, the name of one or more individuals authorized to act as Contracting Officer’s Representatives (CORs) during the contract period.

13.2 Contractor Records and Files: The Contractor shall maintain records and files of all documents relating to each order filled under each Government Headstone and Marker contract. These records shall include, at minimum, copies of all orders, quality assurance records, inspection results, shipping documents (bearing carrier’s name and PRO tracking numbers) and invoices. These records shall be made available, upon request, to the designated MPS Program Support Unit COR during on-site Quality Assurance inspections.

13.3 Government Headstone and Marker Drawings: The Contractor shall ensure copies of all relevant Government drawings for production of monuments are maintained on file.

13.4 Completion point for products delivered FOB Origin Contractor Facility: The Contractor’s responsibilities are deemed complete when a blank shipment is placed on a Government transportation carrier.

13.5 Invoicing: Invoicing in arrears after acceptance.

13.6 Point of Contact at MPS for the assigned COR and Traffic Manager, e-mail to: MPSProgSupport@va.gov

END STATEMENT OF WORK

Cemetery Listing Cemetery Address Point of Contact

Bakersfield National Cemetery 30338 East Bear Mountain Blvd Arvin, CA 93203

Randy Heard

(661) 867-2250

Calverton National Cemetery 210 Princeton Blvd Calverton, NY 11933

Michael Picerno

(631) 727-5410

Cape Canaveral National Cemetery 5525 U.S. Highway 1 Mims, FL, 32754

Don Murphy

(321) 383-2638

Eagle Point National Cemetery 2763 Riley Road Eagle Point, OR 97524

Andrew Matthews

(541) 826-2511

Florida National Cemetery 6502 SW 102nd Avenue Bushnell, FL 33513

Roderick Thomas

(352) 793-7740

Fort Logan National Cemetery 4400 W. Kenyon Avenue Denver, CO 80236

Kevin Johnson

(303) 761-0117

Fort Rosecrans National Cemetery Point Loma, P.O. Box 6237 San Diego, CA 92106 *Cabrillo Memorial Drive

Graham Wright

(619) 553-2084

Fort Sam Houston National Cemetery 1520 Harry Wurzbach Road San Antonio, TX 78209

Aubry David

(210) 820-3891

Fort Snelling National Cemetery 7601 34th Avenue, South Minneapolis, MN 55450-1199

Kimberly Wright

(612) 726-1127

Georgia National Cemetery 1080 Scott Hudgens Drive Canton, GA 30114

James Mithchum

(770) 479-9300

Great Lakes National Cemetery 4200 Belford Road Holly, MI 48442

Sean Baumgartner

(248) 328-0386

Jacksonville National Cemetery 4083 Lannie Road Jacksonville, FL 32218-1247 Alphaeus Richburg

(904) 766-5222

Jefferson Barracks National Cemetery 2900 Sheridan Road St. Louis, MO 63125 Artis Parker

(314) 845-8320

Long Island National Cemetery 2040 Wellwood Avenue Farmingdale, NY 11735-1211 Sue Jehlen

(631) 454-4949

Miramar National Cemetery 5795 Nobel Drive San Diego, CA 92122 Jared Howard

(858) 658-7360

National Cemetery of the Alleghenies 1158 Morgan Road Bridgeville, PA 15017 Edward Hajduk

(724) 746-4363

Rock Island National Cemetery Rock Island Arsenal Bldg. 118 Rock Island, IL 61299 Lance Pridemore

(309) 782-2094

Sacramento Valley National Cemetery 5810 Midway Road Dixon, CA 95620

Willard Pickard (7070 693-2460

South Florida National Cemetery 6501 S. State Road 7 Lake Worth, FL 33449 Sonny Peppers

(561) 649-3948

Washington Crossing National Cemetery 830 Highland Road Newtown, PA 18940 Gregory Whitney

(215) 504-5610

SECTION C - CONTRACT CLAUSES

SBA ACT 8(d)(13)(B)

(B) NOTICE.—

(i) IN GENERAL.—A prime contractor for a covered contract shall notify in writing the contracting officer for the covered contract if the prime contractor pays a reduced price to a subcontractor for goods and services upon completion of the responsibilities of the subcontractor or the payment to a subcontractor is more than 90 days past due for goods or services provided for the covered contract for which the Federal agency has paid the prime contractor.

(ii) CONTENTS.—A prime contractor shall include the reason for the reduction in a payment to or failure to pay a subcontractor in any notice made under clause (i).

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .