36C78620R0001-002.docx

DOCX document 23 KB Posted

Attached to
Little Rock National Cemetery Full Service Cemetery Operations Base plus 4 option years
Solicitation number
36C78620R0001
Issued by

About this file

36C78620R0001 Schedule Little Rock.docx

View the file

Other files

File Type Posted
36C78619D0170-000.docx DOCX document
36C78620R0001-0002001.pdf PDF
36C78620R0001-0002000.docx DOCX document
36C78620R0001-0001000.docx DOCX document
36C78620R0001-0001001.docx DOCX document
36C78620R0001-000.docx DOCX document
36C78620R0001-003.docx DOCX document
36C78620R0001-001.pdf PDF
36C78620R0001-004.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B - CONTINUATION OF SF 1449 BLOCKS

Base Year: October 1, 2019 thru September 30, 2020

CLIN

No.

Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
0001
Grounds Maintenance Services
12
MO
$__________
$__________
0002
Irrigation System Maintenance and Operation
8
MO
$__________
$__________
0003
Sunken Grave Repair
20
EA
$__________
$__________

Headstone Setting, Maintenance, and Cleaning

0004
Upright Headstone Cleaning and Maintenance of approx..22,856 monuments (twice a year)
2
JOB
$__________
$__________
0005
Upright Headstone Setting and Alignment
75
EA
$__________
$__________
0006
Raise & Realignment of Existing Upright Headstones
300
EA
$__________
$__________

Interment Operations: Transportation of casketed or cremated remains and floral arrangements from committal service area to gravesite; placement of casket on lowering device or placement of cremains in ground; including necessary weekends and holidays

0007
Interment, Casket, Traditional:

Grave Excavation and Backfilling

60
EA
$__________
$__________
0008
Interment, Cremains, In-Ground:

Grave Excavation and Backfilling

15
EA
$__________
$__________

Facility Maintenance

0009
Janitorial duties, cleaning, and maintenance of public restroom
52
WK
$__________
$__________
0010
Placement and removal of gravesite flags, Memorial Day (Aprox. 22,856 gravesite flags).
1
JOB
$__________
$__________
0011
Placement and removal of the Avenue of Flags on Memorial Day and Veterans Day.
2
JOB
$__________
$__________
0012
Janitorial duties, (power washing) cleaning and maintenance of the Committal Shelter.
12
JOB
$__________
$__________

Total Price For the Base Year:

Option Year 1: October 1, 2020 thru September 30, 2021

CLIN

No.

Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
1001
Grounds Maintenance Services
12
MO
$__________
$__________
1002
Irrigation System Maintenance and Operation
8
MO
$__________
$__________
1003
Sunken Grave Repair
20
EA
$__________
$__________

Headstone Setting, Maintenance, and Cleaning

1004
Upright Headstone Cleaning and Maintenance of approx..22,856 monuments (twice a year)
2
JOB
$__________
$__________
1005
Upright Headstone Setting and Alignment
75
EA
$__________
$__________
1006
Raise & Realignment of Existing Upright Headstones
300
EA
$__________
$__________

Interment Operations: Transportation of casketed or cremated remains and floral arrangements from committal service area to gravesite; placement of casket on lowering device or placement of cremains in ground; including necessary weekends and holidays

1007
Interment, Casket, Traditional:

Grave Excavation and Backfilling

60
EA
$__________
$__________
1008
Interment, Cremains, In-Ground:

Grave Excavation and Backfilling

15
EA
$__________
$__________

Facility Maintenance

1009
Janitorial duties, cleaning, and maintenance of public restroom
52
WK
$__________
$__________
1010
Placement and removal of gravesite flags, Memorial Day (Aprox. 22,856 gravesite flags).
1
JOB
$__________
$__________
1011
Placement and removal of the Avenue of Flags on Memorial Day and Veterans Day.
2
JOB
$__________
$__________
1012
Janitorial duties, (power washing) cleaning and maintenance of the Committal Shelter.
12
JOB
$__________
$__________

Total Price For the

Option Year 2: October 1, 2021 thru September 30, 2022

CLIN

No.

Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
2001
Grounds Maintenance Services
12
MO
$__________
$__________
2002
Irrigation System Maintenance and Operation
8
MO
$__________
$__________
2003
Sunken Grave Repair
20
EA
$__________
$__________

Headstone Setting, Maintenance, and Cleaning

2004
Upright Headstone Cleaning and Maintenance of approx..22,856 monuments (twice a year)
2
JOB
$__________
$__________
2005
Upright Headstone Setting and Alignment
75
EA
$__________
$__________
2006
Raise & Realignment of Existing Upright Headstones
300
EA
$__________
$__________

Interment Operations: Transportation of casketed or cremated remains and floral arrangements from committal service area to gravesite; placement of casket on lowering device or placement of cremains in ground; including necessary weekends and holidays

2007
Interment, Casket, Traditional:

Grave Excavation and Backfilling

60
EA
$__________
$__________
2008
Interment, Cremains, In-Ground:

Grave Excavation and Backfilling

15
EA
$__________
$__________

Facility Maintenance

2009
Janitorial duties, cleaning, and maintenance of public restroom
52
WK
$__________
$__________
2010
Placement and removal of gravesite flags, Memorial Day (Aprox. 22,856 gravesite flags).
1
JOB
$__________
$__________
2011
Placement and removal of the Avenue of Flags on Memorial Day and Veterans Day.
2
JOB
$__________
$__________
2012
Janitorial duties, (power washing) cleaning and maintenance of the Committal Shelter.
12
JOB
$__________
$__________

Total Price For the

Option Year 3: October 1, 2022 thru September 30, 2023

CLIN

No.

Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
3001
Grounds Maintenance Services
12
MO
$__________
$__________
3002
Irrigation System Maintenance and Operation
8
MO
$__________
$__________
3003
Sunken Grave Repair
20
EA
$__________
$__________

Headstone Setting, Maintenance, and Cleaning

3004
Upright Headstone Cleaning and Maintenance of approx..22,856 monuments (twice a year)
2
JOB
$__________
$__________
3005
Upright Headstone Setting and Alignment
75
EA
$__________
$__________
3006
Raise & Realignment of Existing Upright Headstones
300
EA
$__________
$__________

Interment Operations: Transportation of casketed or cremated remains and floral arrangements from committal service area to gravesite; placement of casket on lowering device or placement of cremains in ground; including necessary weekends and holidays

3007
Interment, Casket, Traditional:

Grave Excavation and Backfilling

60
EA
$__________
$__________
3008
Interment, Cremains, In-Ground:

Grave Excavation and Backfilling

15
EA
$__________
$__________

Facility Maintenance

3009
Janitorial duties, cleaning, and maintenance of public restroom
52
WK
$__________
$__________
3010
Placement and removal of gravesite flags, Memorial Day (Aprox. 22,856 gravesite flags).
1
JOB
$__________
$__________
3011
Placement and removal of the Avenue of Flags on Memorial Day and Veterans Day.
2
JOB
$__________
$__________
3012
Janitorial duties, (power washing) cleaning and maintenance of the Committal Shelter.
12
JOB
$__________
$__________

Total Price For the

Option Year 4: October 1, 2023 thru September 30, 2024

CLIN

No.

Supplies/Services
Est. Qty
Unit
Unit Price
Total Price
4001
Grounds Maintenance Services
12
MO
$__________
$__________
4002
Irrigation System Maintenance and Operation
8
MO
$__________
$__________
4003
Sunken Grave Repair
20
EA
$__________
$__________

Headstone Setting, Maintenance, and Cleaning

4004
Upright Headstone Cleaning and Maintenance of approx..22,856 monuments (twice a year)
2
JOB
$__________
$__________
4005
Upright Headstone Setting and Alignment
75
EA
$__________
$__________
4006
Raise & Realignment of Existing Upright Headstones
300
EA
$__________
$__________

Interment Operations: Transportation of casketed or cremated remains and floral arrangements from committal service area to gravesite; placement of casket on lowering device or placement of cremains in ground; including necessary weekends and holidays

4007
Interment, Casket, Traditional:

Grave Excavation and Backfilling

60
EA
$__________
$__________
4008
Interment, Cremains, In-Ground:

Grave Excavation and Backfilling

15
EA
$__________
$__________

Facility Maintenance

4009
Janitorial duties, cleaning, and maintenance of public restroom
52
WK
$__________
$__________
4010
Placement and removal of gravesite flags, Memorial Day (Aprox. 22,856 gravesite flags).
1
JOB
$__________
$__________
4011
Placement and removal of the Avenue of Flags on Memorial Day and Veterans Day.
2
JOB
$__________
$__________
4012
Janitorial duties, (power washing) cleaning and maintenance of the Committal Shelter.
12
JOB
$__________
$__________

Total Price For the

B.2 PRICE SUMMARY TOTALS

Total Price

Base Year – 10/01/19 thru 9/30/20:
$
Option Year I – 10/1/20 – 9/30/21:
$
Option Year II – 10/1/21 – 9/30/22:
$
Option Year III – 10/1/22 – 9/30/23:
$
Option Year IV – 10/1/23 – 9/30/24:
$
Grand Total (Base + all Option Years):
$

PRICE SCHEDULE: Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grave excavations, interments, and grounds and facility maintenance services to maintain the Little Rock National Cemetery located at 2523 Springer Blvd, Little Rock, AR 72206, following National Cemetery Administration standards. Contract period will consist of a base period from October 1, 2019 (or date of contract award), through September 30, 2020, with up to four (4) one-year options to extend the term of the contract through September 30, 2024. There will be a transition period of approximately 30 days from the date of award; and full contract operations are anticipated to start November 1, 2019. Units and services to be in accordance with Performance Work Statement, Technical Specifications, Performance Incentives/Disincentives, terms and conditions contained in this solicitation.

POST AWARD CONFERENCE: Prior to commencement of work, contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer to assure that all parties understand all contractual obligations and the role that each party serves.

SITE VISIT: Offerors are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. A pre-bid site visit will be held on _______________ Central Time. National Cemetery Administration staff will not be available on site at any other time. If you plan to conduct your own site visit / inspection of the Little Rock National Cemetery, the Cemetery currently opens everyday at 8:00 am, and closes 5:00 pm,.

All services described in the Performance Work Statement, including technical specifications, schedules, addenda, clauses, terms and conditions of the contract shall form the complete scope of work. Period of performance is from date of award until 30 September 2020 for the base year with four (4) one year options.

The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Item (CLIN(s)).

File details come from the government source that posted it.