36C78620B0021 0001.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C78620B0021
About this file
This document contains a pre-solicitation notice and amendment for an invitation for bid to perform road renovation work at the Little Rock National Cemetery. The solicitation will be issued on or about July 7, 2020 for bids to be received electronically. The project scope includes demolition, site work, drainage, utilities and road construction. Three additive options are provided for additional paving work. The estimated value is between $500,000 and $1,000,000. The NAICS code is 237990 and businesses must be less than $36.5 million in size to qualify. This opportunity is 100% set aside for verified Service-Disabled Veteran Owned Small Businesses. Firms must be registered in the System for Award Management and Vendor Information Pages databases by the response due date. The contracting officer is Jerry L. Hodson Jr. and questions can be submitted electronically until the specified date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02_Attachment-5_IFB Contractor Cost Estimate Worksheet.xlsx | XLSX spreadsheet | |
| S02_Attachment-1_SOW_858IC3019.pdf | ||
| 36C78620B0021_Solicitation.docx | DOCX document | |
| S02_Attachment-3_Drawing-Plans_858IC3019.pdf | ||
| S02_Attachment-4_WD_HIGHWAY_Pulaski Co_AR20200171_5-1-20.pdf | ||
| S02_Attachment-2_Specifications_858IC3019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-23-2020
858IC3019
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 To all Offerors/Bidders
36C78620B0021
X X X
New Bid opening 8-10-20 at 10:00am MT X See continuation page for amendment-0001 details.
JERRY L. HODSON JR.
Contracting Officer AMENDMENT-0001, Solicitation 36C78620B0021 Little Rock National Cemetery Road Renovations, Contractor Questions & GOV Responses
***Bid opening is changed from 8-6-20 to 8-10-20*** The new call in number is 872-701-0185 and Conference ID: 564 802 473#
1. Page GI100, keynote H, says to cap and abandon storm line by means of pipeline grouting. Is the pipeline to be grouted in its entire length or just on the ends?
1. GOV Response: Pipeline is to be grouted its entire length.
2. GI100, Keynote A, Full Depth Pavement Reconstruction - Does the VA want the full depth to include everything down to the native soil?
2. GOV Response: Full depth pavement replacement is depicted in details 1 & 5 on sheet DT500. This will require removal of the existing pavement section and sufficient underlying subgrade to accommodate the 21” replacement pavement section (3” Type 2 Asphalt Surface Course, 6” Class 7 Stone and 12” B-Stone underlain by fabric). New subgrade shall be compacted to required density prior to placement of new paving section.
3. Does the VA want to consider an undercut of the native soil and add a layer of top select underneath the new B-stone? In some areas it is obvious that the native soil is in bad shape, a layer of B-stone may or may not be sufficient enough.
3. GOV Response: See response to question #2. If unsuitable material is encountered at subgrade or compaction cannot be achieved, removal and replacement of material is to be carried out as directed by the Contractor’s geotechnical testing service in cooperation with the RE/COR. Replacement of unsuitable soil will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243 4 and VAAR 852.236 88) and "DIFFERING SITE CONDITIONS" (FAR 52.236 2).
4. The guests, staff, and the contractors need to have available lavatory services for a week while the sewer line is under construction. Does the VA want the contractor to provide a mobile mini restroom suite with internal hand washing stations and a portable waste-water holding tank or will individual porta potties and hand washing stations suffice? Will the VA allow the contracting staff to use the same temporary lavatory facilities as that of the guests and the staff?
4. GOV Response: Provide lockable portable potties for the staff while the sewer line is under construction. Provide separate lockable portable potties for the contractor staff.
5. A. Specs Page 01 00 02-1 para F state that the GC shall provide proof that an OSHA competent person maintains a presence on site. Should this be an OSHA 30 or OSHA 10 person? B. Will the VA allow the GC/Prime Contractor the ability to delegate to the subcontractor to maintain this person on site?
5. GOV Response: A. Per Specification 01 00 02 Para 1.1.G, all employees of contractor or subcontractor shall have at minimum OSHA 10 certification. Per (29 CFR 1926.32(f)) "competent person" means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
B. NO
6. Specs page 01 00 02 -6 Para I. Construction Fence - states to provide a chain link fence. Can the contractor substitute this requirement for an orange rollout plastic mesh safety barrier type fence or does the VA specifically want chain link?
6. GOV Response: Construction fence shall be chain-link. Note that construction fencing is only required in limited areas as shown on sheets GI200 & GI201
7. If the VA specifically wants chain link, does the VA want a layer of shielding to visibly hide the inside from the quests and public?
7. GOV Response: Intent of construction fence for this project is primarily to block roadways to separate the work areas from public traffic. A visual barrier is not required in this case.
8. Specs page 01 00 02 -16 Temporary Committal Shelter - Does the VA want the contractor to provide this shelter or is the VA to provide it and contractor to install it?
8. GOV Response: Contractor to provide temporary committal shelter.
9. Due to some recent upticks in crime surrounding the cemetery, the director is encouraging all contractors to provide after-hours security for construction equipment and the portable potties. Apparently, the Little Rock National cemetery was hit by thieves in the last day or two and they broke into the storage facility and stole some of the lawn equipment. The director also said that there is a sizable homeless population there and that they will destroy and tear up everything they can access. Will the VA instruct the contractors to provide after-hours security so that everyone's price is on the same level and one contractor doesn't have an advantage over the other by not providing it in their bid?
9. GOV Response: The cost of security/insurance falls on the Contractor. Adding this cost to your proposal is the bidders call as well.
10. ***RFI period has ended***
End of Document