36C78620B0010 0003.pdf

PDF 204 KB Posted

Attached to
Y1PZ--852CM3040 - Jefferson Barracks Crypt Conversion Section 1KK - Construction IFB (VA-20-00056531)
Solicitation number
36C78620B0010_0003
Issued by

About this file

This document contains questions and answers related to solicitation number 36C78620B0010_0003 for the Jefferson Barracks Crypt Conversion Section 1KK construction project. The solicitation involves converting an existing section of the Jefferson Barracks National Cemetery to accommodate additional burial crypts. Key project details addressed in the questions and answers include confirming the required 10-foot offset distance between new crypts and existing back of curb, clarifying contractor responsibility for means and methods on excavation and potential groundwater, specifying the need for a dedicated full-time superintendent, and providing dimensions for concrete and marker posts.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

852CM3040

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

36C786

Department of Veterans Affairs

National Cemetery Administration

Contracting Services

18434 Joplin Road

Triangle VA 22172

To all Offerors/Bidders

36C78620B0010

X

X

X 1

The purpose of this amendment is to post Questions and Answers. Please see the attached.

CONTINUATION PAGE

Jefferson Barracks Questions and Answers

Q1. Drawing LS-100 has some notations marking “10’ OFFSET” between the crypts and the existing back of curb. Please confirm that it is the intent to offset the crypts a minimum of 10’ from the back of curb. There appear to be some locations in which the distance between the crypts and back of curb is less than 10’.

A. Install according to plan, the majority of each crypt is outside the 10' buffer.

Q2. The proposed crypt field is in very close proximity to existing roadways. Is shoring required or may the contractor slope and/or step the temporary excavation for the crypt field?

A. Means and methods are the responsibility of the contractor.

Q3. The provided borings show no groundwater. Is it a safe assumption that groundwater will not be encountered? Can the remainder of the geotechnical report please be provided?

A. The full geotechnical report is in the specifications. See the geotechnical report for groundwater information.

Q4. Please clarify if shoring/bracing will be required for the northern wall of the excavation where a 1:1 slope does not appear achievable with the construction fencing required.

A. See response to question 2.

Q5. Is this a tax exempt project?

A. No.

Q6. If tax exempt, will the VA be providing a tax-exempt certificate for the Prime and

Subs/Vendors to use?

A.

Q7. L503, Detail F6 specifies concrete footing and an existing post. This post is not existing at the temp entrance off Sheridan road. Is contractor to dig and set the temp post in concrete or can temp fencing with sandbags on the feet be used?

A. Intent is to utilize the existing fence posts to support a temporary gate. If an existing post does not exist a temporary post that can support the gate can be installed

Q8. Does the VA require a Full-time superintendent dedicated to this project, and this project only, or can this employee be shared across other projects?

A. A dedicated full-time superintendent is required.

Q9. Will the Prime Contractor be allocated space for a temp office trailer or is there available space available for a Superintendent to set up an office if not allocated space for the temp trailer?

A. Existing space for a trailer is noted as staging areas on GC-100.

Q10. The RFI response previously supplied regarding the Excess Fill Notes on LG-100 doesn’t seem to be what we believe the spec notes state. Please specify the following:

a) Is the existing excess fill at the barn storage pile to be removed from the site in its entirety?

A. For bidding purposes assume 3,000 CY exist at the storage site. If quantities differ, an adjustment can be made to the contract

b) Are we to assume the amount of fill to be removed from the barn store pile at

3000 CY?

A. For bidding purposes assume 3,000 CY exist at the storage site. If quantities differ, an adjustment can be made to the contract.

c) Is ALL excess fill from 1KK to be moved and permanently stored at the storage pile at the barn?

A. For bidding purposes, assume only 3,000 CY would be used to replace the storage pile. Excess fill exceeding 3,000 CY shall be disposed of off site

Q11. There are no specs for the floral base 6” concrete pad. Please provide specs or a concrete detail.

A. Specification section 32 05 23 specifies the concrete type, and detail F4/L-

504 notes the size and thickness.

Q12. Drawing LP100 indicates a 3.1’ x 1.6’ concrete pad for sign is to be poured. What sign is this referring to?

A. This is background information from the survey and is an existing sign, no signage is required.

Q13. On the above, what concrete specs/detail apply to this pad?

A. See response to question 12.

Q14. Drawing LP-500, not sure if it’s on our end, but detail C1 and E5 are partially in Japanese.

Please advise of the sign details.

A. This is due to installed fonts (or missing) on the viewing computer, make sure to adjust the setting “embed missing fonts” on the PDF viewer used.

Q15. Drawing L501, detail F7 is missing width and depth dimensions of the marker. Please provide.

A. Section marker post shall be 6” width by 6” depth.

End of Document