This document provides a pre-solicitation notice and related federal contract opportunity for a multiple award task order contract (MATOC) to provide construction services for the National Cemetery Administration North Atlantic District. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and provide construction and maintenance services under NAICS codes 236220, 221310, 237130, 237310, 237990, 238110, 238120, 238140, 238160, 238190, 238210, 238220, 238390, 238910. Awards will be made to the most highly qualified offerors based on technical, past performance and price factors. The potential contract value is $15 million over five years including a one-year base and four one-year options. Task orders will range between $10,000 to $500,000. The solicitation will be available on May 28, 2019 and proposals will be due on the date specified in the full RFP to be submitted through the eCMS vendor portal.

36C78619R0062 A0001 36C78619R0062 A0001.docx

View the file

Other files

File Type Posted
36C78619R0062-007.xlsx XLSX spreadsheet
36C78619R0062-006.xlsx XLSX spreadsheet
36C78619R0062-001.docx DOCX document
36C78619R0062-004.pdf PDF
36C78619R0062-002.pdf PDF
36C78619R0062-003.pdf PDF
36C78619R0062-005.xlsx XLSX spreadsheet
36C78619R0062-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A0001 07-29-2019

876-NRM19-07

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford VA 22556 To all Offerors/Bidders

36C78619R0062 07-02-2019 A0004

X X X

X Multiple Award Task Order Contract (MATOC) | 36C78619R0062

1.) The attached questions from Prospective Bidders and Government responses are attached.

2.) Please see the Government's Answer, in Attachment Format on Continuation Page.

**ALL TERM AND

CONDITIONS OF THE SPECIFICATIONS REMAIN THE SAME**

Sheryl Palacio-Davis Contracting Officer

CONTINUATION PAGE

QUESTION & ANSWERS ARE IN RANDOM ORDER:

I have a question about phase 1 the bricks that are to be salvaged from the bathroom for the exterior brick replacement are we to demo an entire wall for that? Because everything I can find about the bathroom work is in phase 2 and if we demo a wall to salvage brick it could potentially shut a rest room down.

Answer: Coordinate limited brick removal such that impacts to restrooms, or other areas are approved by COR. In the event that not enough existing brick can be salvaged, contractor shall provide new brick for the exterior work to match existing in color and texture to the closest extent practical.

Would you like all requirements for Sub-Factor 1 Administrative data included in Volume III?

Answer: Yes

Can you tell me if the SDVOSB letter is required in Volume I & Volume III? Yes Page 91 it states required in Volume I Sub-factor 1 Administrative Date, but on the questions and answers you stated within Volume III. Did this change?

Answer: No

Can more pages be added into the page count for Volume I, since all the administrative Data is included in Volume I, and page covers?

Answer: No

To confirm Administrative Data section will only have Licenses, certifications, Insurance, OSHA training certificates, and any other documents relevant to offers proposal, SAM registration, SDVOSB letter, because the SF1442 and amendments will be in Volume III. Is this correct?

Answer: Yes

Can the bid be extended for more time to prepare with answers to questions?

Answer: No

Please confirm if the government requires a submittal log and submittal data sheets to be provided.

We have previously communicated that we don’t care or want submitted data sheets for this specific project, but a generic submittal log itself with no specific make/models of products to be used: we have all discussed as being a good measure to check a contractor’s skill and preparation for the project (and future MATOC projects if they win).

Please confirm that no bid bond is required for this solicitation.

Answer: A copy of the Bid Bond is Required with the Proposal. Upon notification of Award, the Awardee will be required to furnish the Original Bid Bond via certified mail.

Please confirm that the furnace upgrade will handle a 50 AMP upgrade.

Answer: Note that the solicitation is ONLY for phase 1 work, which does not as show on the SOW and drawings include a new furnace or the new unit heating system. See note 13 under “Proposed Phase 2” on drawing G-002. After consideration, NCA has decided to modify this solicitation to INCLUDE the note 13 work from Phase 2 on drawing G-002 in this solicitation due to requiring heat in the building to protect pipes from freezing. Contractor shall include any electrical, architectural touch ups and patching work, and any other work required to install the HVAC work required in this note 13. Contractors shall include in their bid for this solicitation as a result. See mechanical drawings for more information.

Is the prime or subcontractor required to have North Carolina construction licenses?

Answer: Contractors are responsible for coordination of all licenses or permits for this project.

Are permits required in order to perform work at the New Bern National Cemetery?

Answer: Contractors are responsible for coordination of all licenses or permits for this project.

Regarding the electrical panel that is to be replaced per the drawings inside of the garage. Where is this panel fed from?

Answer: It is fed from the Main Building Basement (also known as the Lodge). This is shown on the Proposed Panel “M” Load Schedule on drawing E6.1. A picture is also provided on this same drawing. Also see the single line diagrams on this same drawing. There is also a detail on this drawing entitled “Existing Site Layout” which shows the Main Building, Maintenance building, and the existing conduit between them.