36C78619R0012_0001_3.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C78619R0012
About this file
36C78619R0012 0001 36C78619R0012 0001_3.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fayetteville_-_Irrigation_Drawing.pdf | ||
| Fayetteville_-_New_Parking_and_Curb_-_Drawings.pdf | ||
| 36C78619R0012-002.pdf | ||
| 36C78619R0012-001.docx | DOCX document | |
| 36C78619R0012-003.pdf | ||
| 36C78619R0012-004.xlsx | XLSX spreadsheet | |
| 36C78619R0012-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 Z Fayetteville construction of new parking spaces and the replacement of existing curb.
80228 36C78619R0012 12-21-2018 N 238110
DEPARTMENT OF VETERANS AFFAIRS
NATIONAL CEMETERY ADMINISTRATION
CONTINENTAL DISTRICT
155 VAN GORDON STREET, SUITE 510
LAKEWOOD, CO 80228
KELLY.RIMA@VA.GOV
FAYETTEVILLE NATIONAL CEMETERY
700 GOVERNMENT ROAD
FAYETTEVILLE, ARKANSAS
72701
USA
RFI Questions and Answers for Fayetteville New Parking and Curbing Project 36C78619R0012
1. Are there any plans of the current irrigation system from the original installation or modifications over the years?
DISTRICT RESPONSE: An irrigation drawing is being provided, but it is not all inclusive and may not reflect actual conditions. Contractor is responsible to identify and/or verify existing irrigation lines and components in and around the construction area. Contract needs to coordinate and work with the cemetery staff on locating and operating the irrigation system while under construction.
2. Is the successful contractor responsible to only perform work on the irrigation system within the project construction area, even if other issues outside the construction area need to be resolved (such as wiring issues, breaks, damages outside of construction area) before the sections in the proposed construction area are fixed and modified?
DISTRICT RESPONSE: Contractor is responsible to identify existing irrigation lines and components in and around the construction area. The Contractor is also responsible to repair and/or replace any irrigation system piping and components damaged and/or disturbed by the Contractor in and around the project area and any area within the cemetery. Again, the Contract needs to coordinate and work with the cemetery staff on locating and operating the irrigation system while under construction.
3. On page 1 and page 12 the preferred method for submission of proposals is electronically to Kelly Rima. In block 13a of the additional solicitation requirements it says sealed offers in original and one copy which means proposals would need to be mailed in. Which is the required method of submission?
DISTRICT RESPONSE: Either method is acceptable for submission, but email is preferred.
4. Would it be possible for us to the get the CAD file for the plan sheets or a corrected version of the pdf file? As of right now, it appears that the pdf file for the plan sheets were created from CAD and turned into an 8.5” x 11” document instead of what I assume is a 22”x34” or 24”x36” as it was intended to be. When an 8.5”x11” pdf document is created, it throws the scale of the plan sheets off and makes exceptionally difficult to accurately measure quantities for pricing particularly when the scale used on the plan views are architectural scale (feet – inches) instead of engineering/construction scale (decimal feet).
DISTRICT RESPONSE: New drawings will be added to FBO that should allow for correct download.
5. On the plan sheets it says to reroute irrigation lines and components as required and to cap ends of modified irrigation lines, but it gives no information regarding the existing irrigation or what is required for rerouting. Without knowing what is in the demo area or how the existing irrigation system is set up, we have no way of knowing how to reroute or reconnect any of the components to ensure the system continues to function properly.
DISTRICT RESPONSE: See response to question number 1 and 2.
See attached document: Fayetteville - New Parking and Curb - Drawings.
See attached document: Fayetteville - Irrigation Drawing.
End of Document
File details come from the government source that posted it.