About this file

36C78619Q0366 0002 AMD 2 - Question and Answers - 36C78619Q0366 - National Cemetery of Alleghenies.pdf

View the file

Other files

File Type Posted
36C78619Q0366-0002000.docx DOCX document
36C78619Q0366-0001000.docx DOCX document
36C78619Q0366-003.pdf PDF
36C78619Q0366-005.pdf PDF
36C78619Q0366-002.docx DOCX document
36C78619Q0366-004.pdf PDF
36C78619Q0366-006.pdf PDF
36C78619Q0366-001.pdf PDF
36C78619Q0366-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers regarding 36C78619Q0366 National Cemetery of the Alleghenies

1. Question will the underside be repaired? If so what will it be repaired with

Caulking or Grout?

Answers: This repair is to replace damaged/failed caulking. If there is no caulking at the underside than there is nothing to repair.

2. How would work be able to continue if shelter is being used doing interments?

Answers: Work would be alternated between wall and shelters during internments.

3. On the underside of the coping there is no caulk as it is grout. How do you want him to proceed?

Answers: No work is necessary at the underside of coping. All work associated with the underside of the coping should be eliminated from the project. Item 1.b under “Work Shall Include” should be removed from the SOW. Items 1.a and 1.c should still be included in the project.

NOTE: Reduction in Repair Area as noted below:

This mean a reduction in linear feet at each location as stated below:

a. Assembly Area: 106‐64= 42 ft.

b. Committal Shelter 1: 246‐144=102 ft.

c. Committal Shelter 2: 246‐144=102 ft.

d. Committal Shelter 3: 189‐110=79 ft.