36C78619Q0297-0003000.docx
DOCX document 23 KB Posted
- Solicitation number
- 36C78619Q0297
About this file
36C78619Q0297 0003 36C78619Q0297 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619Q0297-0002000.docx | DOCX document | |
| 36C78619Q0297-0001000.docx | DOCX document | |
| 36C78619Q0297-0001001.pdf | ||
| 36C78619Q0297-009.pdf | ||
| 36C78619Q0297-006.pdf | ||
| 36C78619Q0297-007.pdf | ||
| 36C78619Q0297-005.pdf | ||
| 36C78619Q0297-000.docx | DOCX document | |
| 36C78619Q0297-008.pdf | ||
| 36C78619Q0297-011.docx | DOCX document | |
| 36C78619Q0297-001.pdf | ||
| 36C78619Q0297-004.pdf | ||
| 36C78619Q0297-012.doc | DOC document | |
| 36C78619Q0297-003.pdf | ||
| 36C78619Q0297-010.docx | DOCX document | |
| 36C78619Q0297-002.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-13-2019 7869-000218 N/A 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 To all Offerors/Bidders
36C78619Q0297 05-14-2019
X X
X THE PURPOSE OF THIS AMENDMENT IS TO ADDRESS QUESTIONS. PLEASE SEE ATTACHED. PLEASE READ THE
SOLICITATION IN
IT'S ENTIRETY TO HAVE A FULL AND COMPLETE UNDERSTANDING OF THE REQUIREMENT PRIOR TO YOUR QUOTE SUBMISSION. YOU ARE RESPONSIBLE FOR READING AND UNDERSTANDING THE SUBJECT SOLICITATION AND ALL ATTACHMENTS AND DRAWINGS.
NO LATE QUOTES
WILL BE ACCEPTED. NO QUOTES WILL BE ACCEPTED OUTSIDE OF THE VENDOR PORTAL. PLEASE SEE ATTACHED FOR
RESPONSE TO QUESTIONS.
ANTIONETTE
COLLINS-SOMERVILLE
CONTRACTING OFFICER
VA-NCA-2017-1B6C704E
CONTINUATION PAGE
Questions & Answers
Question 1) On Sample #1 (Old Style XC Headstone) The pdf file of (Old Style XC Headstone) has a large number at the top in the shield but I'm not sure what that number indicates. The sample request does not have a number, however the Statement of Work says no Section numbers sandblasted, only written on the bottom of headstone. So we did not put any large number on the sample. Is that ok or do we need to add one?
Answer 1: We do not understand what your referring to in reference to XC Sample? As noted on the attachment A, you are to inscribe only what is presented in column F. There will be no section/row/grave # inscribed on any of the headstones as noted on attachment A. The section/row/grave # is presented as a tracking system and should be written in black ink on the bottom of the headstone to identify it’s location within the cemetery.
Question 2) Sample #3 (Type 5.2 Headstone) is for JOHN BROWN 7TH Do we keep 7TH the same size (3cm) as the name as shown on the Excel Spread sheet. No where does it say to reduce the size of the font to next size down in the Statement of Work or on the pdf file of the Type 5.2 Headstone.
Answer 2: Please mirror what is presented on the spreadsheet and on the drawings for each headstone type.
PLEASE REVIEW ALL DRAWINGS AND THE STATEMENT OF WORK FOR THE CORRECT PLACEMENT AND NUMBER OF LETTERING FOR ALL HEADSTONES AND SAMPLES.
End of Document
File details come from the government source that posted it.