36C78619Q0276-001.pdf

PDF 61 KB Posted

Attached to
36C78619P0324 Four Utility Vehicles Puerto Rico National Cemetery
Solicitation number
36C78619Q0276
Issued by

About this file

36C78619Q0276 Utility Vehicle Specifications for Puerto Rico National Cemetery.pdf

View the file

Other files

File Type Posted
-16900.docx DOCX document
36C78619Q0276-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRODUCT DESCRIPTION

1. REQUIREMENTS: Four Utility Vehicles

Intended Use: This equipment is a very important part for the interment operations. It is used to excavate gravesites, lift and lower crypt lids, load vehicles, level uneven terrain, etc. It is also used by grounds maintenance for any renovation or special projects that may include any earth moving.

2. EXTENT OF OBLIGATION

a. Delivery requirements: [Freight of the Utility Vehicle is to be included in price]. The vendor shall deliver from Monday to Friday 0700 to 1400, to Puerto Rico National Cemetery; #50 Ave. Cementerio Nacional; Bayamón, PR 00961.

b. The vendor shall provide local warranty for parts and service

Contract Line Item

(CLIN)

Item Description

Minimum Technical Requirements Method of Evaluation

PRODUCT: Utility Vehicle

PRODUCT:

[Fill in Information]

MTR # 1 – Must provide towing Capacity of 1,587 kg

Literature Review

MTR # 2 – Must be 4wheel drive Literature Review

MTR # 3 - Must have 4wheel hydraulic disc brakes Literature Review

MTR # 4 - Must have authorized service provider near site Literature Review

MTR # 5 - Must be compatible with all TORO attachments on site i.e.

Toro Workman® 757 L Sprayer, Top dresser 1800

Literature Review

MTR # 6 - Must have a total payload capacity of 1,289 kg Literature Review

MTR # 7 - Must have at least a 2-year limited warranty Literature Review

c. Upon delivery of the utility vehicle, an authorized National Cemetery Administration (NCA) representative shall thoroughly inspect the equipment. After the inspection has been performed, NCA shall issue a written notice of acceptance or rejection. The written notice shall be issued within 15 days from the date of delivery. If a written notice is not received by the company within 15 days, NCA shall be deemed to have unconditionally accepted the supply.

3. SCHEDULE FOR DELIVERABLES

Inspection: Destination Acceptance: Destination Free on Board (FOB): N/A

Ship To and Mark For:

Puerto Rico National Cemetery (PRNC) #50 Ave. Cementerio Nacional Bayamon, PR 00961

4. POINT(S) OF CONTACT:

Davis Dumeng Voice: 787-798-8400, Ext. 224 or 241 davis.dumeng@va.gov

Or, Joel Caballero Voice: 787-798-8400, Ext. 239 joel.caballero@va.gov

Puerto Rico National Cemetery (PRNC) #50 Ave. Cementerio Nacional Bayamon, PR 00961 mailto:davis.dumeng@va.gov mailto:joel.caballero@va.gov

File details come from the government source that posted it.