About this file

36C78619Q0252 A0005 36C78619Q0252 A0005.docx

View the file

Other files

File Type Posted
36C78619C0095-000.docx DOCX document
36C78619Q0252-A0004000.docx DOCX document
36C78619Q0252-A0002002.pdf PDF
36C78619Q0252-A0002001.pdf PDF
36C78619Q0252-A0002000.docx DOCX document
36C78619Q0252-A0001000.docx DOCX document
36C78619Q0252-A0001002.pdf PDF
36C78619Q0252-A0001001.pdf PDF
36C78619Q0252-001.docx DOCX document
36C78619Q0252-002.pdf PDF
36C78619Q0252-003.pdf PDF
36C78619Q0252-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A0005 05-16-2019 7879-000029

802-MM19-01

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford

VA

22556 43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford

VA

22556 To all Offerors/Bidders

36C78619Q0252 04-16-2019

X X X

X Baltimore National Cemetery | 36C7861Q0252 | Install Storm & Sanitary Sewer

The attached questions from prospective Bidders and Government responses are attached. Please see Page #2

Please reference Project Number 802-MM19-01 when submittingyour Proposal.

**ALL TERM AND CONDITIONS OF THE SPECIFICATIONS REMAIN THE SAME**

Sheryl Palacio-Davis Contracting Officer

CONTINUATION PAGE

Respond to RFP for 36C78619Q0252 Baltimore National Cemetery, Install Storm & Sanitary Sewer

1. There appear to be a number of trees where the majority of the root systems would be cut by the installation of both the storm and sanitary sewers with root pruning per the detail on sheet CD100. We are concerned this will compromise the structural integrity of the trees and cause a potentially hazardous condition in the future. Please clarify what measures, if any, are intended for these trees over and above the root pruning.

Trees within the limits of disturbance have been evaluated and are not considered of high value. Therefore, the tree pruning detail will be sufficient.

1. Currently the project shows an overlay for the roadway coming up, with no milling indicated, but the current asphalt is tied into the gutter line along the side opposite of the new sanitary and storm. Is the intent to mill the overlay area prior to overlay or simply overlay, and if the latter, do you want to edge mill the asphalt or overlay the gutter pan?

The Demolition Plan, Sheet CD 100 (4 of 14) indicates “Existing Asphalt to Be Milled” for the area in question.

1. The drawings show approximately 6’ drop from the new invert in to the invert out. Additionally, a detail is shown for a drop manhole connection, but one is not indicated on the profiles. Baltimore City Standard Detail BC 831.01 indicates that the bricked invert must be carried up to the flow line of the pipe, which is obviously impossible given the vertical offset. Please clarify if a drop connection is required and provide details such as invert in for the lower invert.

At sanitary manhole “Ex B”, the detail for the drop manhole connection is shown on the profile by reference to Detail 4 as shown on Sheet DT500, denoted by the highlighted symbol shown below.

1. Related question: Detail BC 831.01 additionally shows a 4’ vertical section of the manhole projecting 4’ above the top invert of the invert out. This would put the invert in of the upper drop in the tapered section of the manhole. Typically this is not done, please confirm the detail as to this connection.

At proposed sanitary manhole “J”, the detail for the drop manhole connection is shown on the profile by reference to Detail 4 as shown on Sheet DT500, denoted by the highlighted symbol shown below.