36C78619Q0043-001.pdf
PDF 651 KB Posted
- Solicitation number
- 36C78619Q0043
About this file
36C78619Q0043 Beverly Grounds Maint - SOW - 36C78619Q0043.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619Q0043-0002000.docx | DOCX document | |
| 36C78619Q0043-0001000.docx | DOCX document | |
| 36C78619Q0043-003.pdf | ||
| 36C78619Q0043-004.pdf | ||
| 36C78619Q0043-005.pdf | ||
| 36C78619Q0043-002.docx | DOCX document | |
| 36C78619Q0043-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLIES OR SERVICES AND PRICES / COSTS
PRICE SCHEDULE: The Contractor shall furnish all labor, supervision, equipment, materials and supplies necessary to provide complete grounds maintenance services at the Beverly National Cemetery – Location: 916 Bridgeboro Road, Beverly, NJ 08010.
POST AWARD CONFERENCE: Prior to commencement of work, contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer COR to assure that all parties understand all contractual obligations and the role that each party serves.
SITE VISIT: Offerors or quoters are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Beverly National Cemetery, YOU MUST CONTACT one of the following personnel to schedule and arrange site visit:
Greg Whitney – Director, Washington Crossing NC – PH: 215-504-5610 Anthony Murray, Foreman – PH: 215-504-5610 - Facsimile No.: (215) 504-5611 Jason Guenther, Administrative Officer – 215-504-5610, ext. 2202
All services described in the Work Statement, including technical specifications, schedules, addenda, clauses, terms and conditions of the contract shall form the complete scope of work.
The period of performance is from March 01, 2019 (or date of award / whichever is sooner) through September 30, 2019, with four (4) one-year renewal options.
NOTE Schedule begins on next page.
BEVERLY NATIONAL CEMETERY
Base Year Period: March 1st, 2019 or From Date of Award through September 30, 2019
CLIN
Description Est.
Qty Unit Unit Cost Total Cost
GROUNDS MAINTENANCE SERVICES
General, on-going and recurring cemetery Grounds Maintenance Services to include the following:
Mowing & removal of Debris /Grass Clippings.
Trimming of headstones, trees, curbs and fence lines.
Sweeping and/or blowing-off of roads and walkways.
Leaf Removal – Including Fall Leaf
Removal.
Daily policing of cemetery grounds to include collection & removal of leaves, small branches & twigs, debris / trash, floral arrangements, and emptying trash receptacles.
Control / Trapping of Vertebrate Pests (moles).
Snow & Ice Removal to Include Roadways, Sidewalks, Building Entrances, Driveways & Parking Areas.
Raising & Lowering of U.S. Flag for
12 MO $ _________ $ ___________
JANITORIAL SERVICES
Daily, and as needed cleaning of space located in Administration Building, Public Restrooms adjacent to the Administration Building, and, Service Building areas (See Section A.5)
12 MO $ __________ $ ____________
INTERMENT SERVICES
Grave Excavation & Backfilling: Casketed remains (second interments).
100 Ea. $ __________ $ ____________
Grave Excavation & Backfilling: Cremated remains (second interments).
65 Ea. $ __________ $ ____________
HEADSTONE MAINTENANCE
Clean Upright Headstones & Flat Markers (before Memorial Day and Veteran’s Day)
88,000 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Upright Headstones
100 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Flat Markers
65 Ea. $ __________ $ ____________
Remove, Break-up & Dispose of Unusable / Damaged / Replacement Upright Headstones and Flat Markers
150 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones.
5000 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Flat Markers
100 Ea. $ __________ $ ____________
Bump & Run: Realign headstones that have shifted out of alignment.
1000 Ea. $ __________ $ ____________
0012 Refill Sunken Graves 100 Ea. $ __________ $ ____________
TURF FERTILIZATION & WEED CONTROL
Turf Application #1 – Turf Application #1 (October 10th – 15th) -- Post emergent broad leaf weed control to include dandelion, plantain, chickweed, clover & other common broadleaf weeds. Applied in liquid form to the entire turf acreage using an appropriate broadleaf herbicide.
1 Job $__________ $___________
Turf Application #2 (November 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #3 (Applied in early spring at optimum time for pre-emergent crabgrass / weed grass control) - Pre-emergent control for annual weed grasses such as crabgrass, goose grass and barnyard grass and post emergent control of broadleaf weeds such as dandelion, clover, plantain & spurge.
Liquid or granul ar?
Job $__________ $___________
Turf Application #4 (May 10th – 15th) – Second Post emergent control for crabgrass / weed grasses and broadleaf weeds applied in liquid form to entire turf acreage.
1 Job $__________ $___________
Turf Application #5 (June 1st - 5th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #6 – (July10th-15th) Application of Dismiss or Sedge Hammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $___________
Turf Application #7 – (July24th-29th) Application of Dismiss or Sedge Hammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #8 – (August 7th-11th) Application of Dismiss or Sedge Hammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #9 – (August 5th – 10th) - This application will be a treatment for the post emergent control of crabgrass and other weed grasses and yellow / purple nut sedge (sedge grasses) applied in liquid form.
1 Job $__________ $__________
Turf Application #10 (September 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
AERATION, OVER-SEEDING & SEEDING OF NEW OR REFILLED GRAVES
Dethatch cemetery turf (April 1st-10th) / Done every 2-3 years.
1 Job $ __________ $ ____________
Aerate Cemetery (September) / Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
Over-seed Entire Cemetery (September) / Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
0026 Seeding Newly Dug or Refilled Graves 100 Job $ __________ $ ____________
TREE, SHRUB & PLANTING BED MAINTENANCE
Prune Cemetery Shrubs & Hedges (May & September)
2 Job $ __________ $ ____________
0028 Deadwood Prune Cemetery Trees - 1 Job $ __________ $ ____________
Pre- Emergent Weed Application in Planting Beds -
4 Job $ __________ $ ____________
Edge & Mulch Cemetery Planting Beds & Tree Rings -
1 Job $ __________ $ ____________
MEMORIAL DAY CEREMONY
Memorial Day Ceremony: Set-up & removal of Avenue of Flags, installation of Portable Restroom at Rostrum and Raising & Lowering of U.S. Flag.
1 Job $ __________ $ ____________
Veterans Day Ceremony: Set-up & removal of approximately 50 Chairs (govt. owned) at the base of Cemetery Flagpole and set up and removal of Avenue of Flags.
1 Job $ __________ $ ____________
ON-CALL / EMERGENCY STORM DAMAGE & STUMP REMOVAL
“Hourly Rate” for On-call / emergency storm damage & stump removal Services (See Section A.6)
50 Hr. $ __________ $ ____________
GENERAL & EMERGENCY SMALL REPAIR SERVICES
Straight Time Hourly Rate - All labor will be charged at the hourly rate indicated in the Schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates and Parts Discount for General & Emergency Small Repair Services to be provided on an "As-Needed / As-Requested" basis (See Section A.7)
100 Hr. $ __________ $ ____________
PARTS - Manufacturer's List Price Less ___________ % Government Discount.
BASE YEAR Total Estimated Cost: $ ____________
Option Year I: October 1, 2019 thru September 30, 2020
CLIN
Description Est.
Qty Unit Unit Cost Total Cost
GROUNDS MAINTENANCE SERVICES
General, on-going and recurring cemetery Grounds Maintenance Services to include the following:
Mowing & removal of Debris /Grass Clippings.
Trimming of headstones, trees, curbs and fence lines.
Daily policing of cemetery grounds to include collection & removal of leaves, small branches & twigs, debris / trash, floral arrangements, and emptying trash receptacles.
Control / Trapping of Vertebrate & Invertebrate Pests.
Snow & Ice Removal to Include Roadways, Sidewalks, Building Entrances, Driveways & Parking Areas.
Raising & Lowering of U.S. Flag for
12 MO $ _________ $ ___________
JANITORIAL SERVICES
Daily and as needed cleaning of space located in Administration Building, Public Restrooms adjacent to the Administration Building, Service Building and areas (See Section A.5)
12 MO $ __________ $ ____________
INTERMENT SERVICES
Grave Excavation & Backfilling: Casketed remains (second interments).
100 Ea. $ __________ $ ____________
Grave Excavation & Backfilling: Cremated remains (second interments).
65 Ea. $ __________ $ ____________
HEADSTONE MAINTENANCE
Clean Upright Headstones & Flat Markers (before Memorial Day and Veteran’s Day).
88,000 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Upright Headstones
100 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Flat Markers
65 Ea. $ __________ $ ____________
Remove, Break-up & Dispose of Unusable / Damaged / Replacement Upright Headstones and Flat Markers
150 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones.
5000 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Flat Markers
100 Ea. $ __________ $ ____________
Bump & Run: Realign headstones that have shifted out of alignment.
1000 Ea. $ __________ $ ____________
1012 Refill Sunken Graves 100 Ea. $ __________ $ ____________
TURF FERTILIZATION & WEED CONTROL
Turf Application #1 – Turf Application #1 (October 10th – 15th) -- Post emergent broad leaf weed control to include dandelion, plantain, chickweed, clover & other common broadleaf weeds. Applied in liquid form to the entire turf acreage using an appropriate broadleaf herbicide.
1 Job $__________ $___________
Turf Application #2 (November 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #3 (Applied in early spring at optimum time for pre-emergent crabgrass / weed grass control) - Pre-emergent control for annual weed grasses such as crabgrass, goose grass and barnyard grass and post emergent control of broadleaf weeds such as dandelion, clover, plantain & spurge.
1?? Job $__________ $___________
Turf Application #4 (May 10th – 15th) – Second Post emergent control for crabgrass / weed grasses and broadleaf weeds applied in liquid form to entire turf acreage.
1 Job $__________ $___________
Turf Application #5 (June 1st - 5th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $__________
Turf Application #6 – (July10th-15th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #7 – (July24th-29th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #8 -( August7th-11th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf where nutsedge is present
1 Job $__________ $___________
Turf Application #9 – (August 5th – 10th) - This application will be a treatment for the post emergent control of crabgrass and other weed grasses and yellow / purple nut sedge (sedge grasses) applied in liquid form.
Turf Application #10 (September 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
AERATION, OVER-SEEDING & SEEDING OF NEW OR REFILLED GRAVES
Aerate Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
Over-seed Entire Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
1025 Seeding Newly Dug or Refilled Graves 100 Job $ __________ $ ____________
TREE, SHRUB & PLANTING BED MAINTENANCE
Prune Cemetery Shrubs & Hedges (May & September)
2 Job $ __________ $ ____________
1027 Deadwood Prune Cemetery Trees 1 Job $ __________ $ ____________
Pre-Emergent Weed Application in Planting Beds
4 Job $ __________ $ ____________
Edge & Mulch Cemetery Planting Beds & Tree Rings
1 Job $ __________ $ ____________
MEMORIAL DAY CEREMONY
Memorial Day Ceremony: Set-up & removal of Avenue of Flags, installation of Portable Restroom at Rostrum and Raising & Lowering of U.S. Flag.
1 Job $ __________ $ ____________
Veterans Day Ceremony: Set-up & removal of approximately 50 Chairs (govt. owned) at the base of Cemetery Flagpole, and set up and removal of Avenue of Flags.
1 Job $ __________ $ ____________
ON-CALL / EMERGENCY STORM DAMAGE & STUMP REMOVAL
“Hourly Rate” for On-call / emergency storm damage & stump removal Services (See Section A.6)
50 Hr. $ __________ $ ____________
GENERAL & EMERGENCY SMALL REPAIR SERVICES
Straight Time Hourly Rate - All labor will be charged at the hourly rate indicated in the Schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates and Parts Discount for General & Emergency Small Repair Services to be provided on an "As-Needed / As-Requested" basis (See Section A.7)
100 Hr. $ __________ $ ____________
OPTION YEAR I Total Estimated Cost: $ ____________
Option Year II: October 1, 2020 thru September 30, 2021
CLIN
Description Est.
Qty Unit Unit Cost Total Cost
GROUNDS MAINTENANCE SERVICES
General, on-going and recurring cemetery Grounds Maintenance Services to include the following:
Mowing & removal of Debris /Grass Clippings.
Trimming of headstones, trees, curbs and fence lines.
Daily policing of cemetery grounds to include collection & removal of leaves, small branches & twigs, debris / trash, floral arrangements, and emptying trash receptacles.
Control / Trapping of moles.
Snow & Ice Removal to Include Roadways, Sidewalks, Building Entrances, Driveways & Parking Areas.
Raising & Lowering of U.S. Flag for scheduled Funeral Services.
12 MO $ _________ $ ___________
JANITORIAL SERVICES
Daily, and as needed cleaning of space located in Administration Building, Public Restrooms adjacent to the Administration Building, Service Building and areas (See Section A.5)
12 MO $ __________ $ ____________
INTERMENT SERVICES
Grave Excavation & Backfilling: Casketed remains (second interments).
100 Ea. $ __________ $ ____________
Grave Excavation & Backfilling: Cremated remains (second interments).
65 Ea. $ __________ $ ____________
HEADSTONE MAINTENANCE
Clean Upright Headstones & Flat Markers (before Memorial Day and Veteran’s Day).
88,000 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Upright Headstones
100 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Flat Markers
65 Ea. $ __________ $ ____________
Remove, Break-up & Dispose of Unusable / Damaged / Replacement Upright Headstones and Flat Markers
150 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones.
5000 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Flat Markers
100 Ea. $ __________ $ ____________
Bump & Run: Realign headstones that have shifted out of alignment.
1000 Ea. $ __________ $ ____________
2012 Refill Sunken Graves 100 Ea. $ __________ $ ____________
TURF FERTILIZATION & WEED CONTROL
Turf Application #1 – Turf Application #1 (October 10th – 15th) -- Post emergent broad leaf weed control to include dandelion, plantain, chickweed, clover & other common broadleaf weeds. Applied in liquid form to the entire turf acreage using an appropriate broadleaf herbicide.
1 Job $__________ $___________
Turf Application #2 (November 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #3 (Applied in early spring at optimum time for pre-emergent crabgrass / weed grass control) - Pre-emergent control for annual weed grasses such as crabgrass, goose grass and barnyard grass and post emergent control of broadleaf weeds such as dandelion, clover, plantain & spurge.
1 Job $__________ $___________
Turf Application #4 (May 5th – 10th) – Second Post emergent control for crabgrass / weed grasses and broadleaf weeds applied in liquid form to entire turf acreage.
1 Job $__________ $___________
Turf Application #5 (June 1st - 5th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #6 – (July10th-15th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #7 – (July24th-29th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #8 -( August7th-11th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf where nutsedge is present
1 Job $__________ $__________
Turf Application #9 – (August 5th – 10th) - This application will be a treatment for the post emergent control of crabgrass and other weed grasses and yellow / purple nut sedge (sedge
Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
AERATION, OVER-SEEDING & SEEDING OF NEW OR REFILLED GRAVES
Dethatch cemetery turf (April 1-10th) / Done every 2-3 years
1 Job $ __________ $ ____________
Aerate Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
Over-seed Entire Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
2026 Seeding Newly Dug or Refilled Graves 100 Job $ __________ $ ____________
TREE, SHRUB & PLANTING BED MAINTENANCE
Prune Cemetery Shrubs & Hedges (May & September)
2 Job $ __________ $ ____________
2028 Deadwood Prune Cemetery Trees 1 Job $ __________ $ ____________
Pre-Emergent Weed Application in Planting Beds
4 Job $ __________ $ ____________
Edge & Mulch Cemetery Planting Beds & Tree Rings
1 Job $ __________ $ ____________
MEMORIAL DAY CEREMONY
Memorial Day Ceremony: Set-up & removal of Avenue of Flags, installation of Portable Restroom at Rostrum and Raising & Lowering of U.S. Flag.
1 Job $ __________ $ ____________
Veterans Day Ceremony: Set-up & removal of approximately 50 Chairs (govt. owned) at the base of Cemetery Flagpole, and set up and removal of Avenue of Flags.
1 Job $ __________ $ ____________
ON-CALL / EMERGENCY STORM DAMAGE & STUMP REMOVAL
“Hourly Rate” for On-call / emergency storm damage & stump removal Services (See Section A.6)
50 Hr. $ __________ $ ____________
GENERAL & EMERGENCY SMALL REPAIR SERVICES
Straight Time Hourly Rate - All labor will be charged at the hourly rate indicated in the Schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates and Parts Discount for General & Emergency Small Repair Services to be provided on an "As-Needed / As-Requested" basis (See Section A.7)
100 Hr. $ __________ $ ____________
OPTION YEAR II Total Estimated Cost: $ ____________
Option Year III: October 1, 2021 thru September 30, 2022
CLIN
Description Est.
Qty Unit Unit Cost Total Cost
GROUNDS MAINTENANCE SERVICES
General, on-going and recurring cemetery Grounds Maintenance Services to include the following:
Mowing & removal of Debris /Grass Clippings.
Trimming of headstones, trees, curbs and fence lines.
Daily policing of cemetery grounds to include collection & removal of leaves, small branches & twigs, debris / trash, floral arrangements, and emptying trash receptacles.
Control / Trapping of moles.
Snow & Ice Removal to Include Roadways, Sidewalks, Building Entrances, Driveways & Parking Areas.
Raising & Lowering of U.S. Flag for scheduled Funeral Services.
12 MO $ _________ $ ___________
JANITORIAL SERVICES
Daily, and as needed cleaning of space located in Administration Building, Public Restrooms adjacent to the Administration Building, Service Building and areas (See Section A.5)
12 MO $ __________ $ ____________
INTERMENT SERVICES
Grave Excavation & Backfilling: Casketed remains (second interments).
100 Ea. $ __________ $ ____________
Grave Excavation & Backfilling: Cremated remains (second interments).
65 Ea. $ __________ $ ____________
HEADSTONE MAINTENANCE
Clean Upright Headstones & Flat Markers (before Memorial Day and Veteran’s Day).
88,000 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Upright Headstones
100 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Flat Markers
65 Ea. $ __________ $ ____________
Remove, Break-up & Dispose of Unusable / Damaged / Replacement Upright Headstones and Flat Markers
150 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones.
5000 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Flat Markers
100 Ea. $ __________ $ ____________
Bump & Run: Realign headstones that have shifted out of alignment.
1000 Ea. $ __________ $ ____________
3012 Refill Sunken Graves 100 Ea. $ __________ $ ____________
TURF FERTILIZATION & WEED CONTROL
Turf Application #1 – Turf Application #1 (October 10th – 15th) -- Post emergent broad leaf weed control to include dandelion, plantain, chickweed, clover & other common broadleaf weeds. Applied in liquid form to the entire turf acreage using an appropriate broadleaf herbicide.
1 Job $__________ $___________
Turf Application #2 (November 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #3 (Applied in early spring at optimum time for pre-emergent crabgrass / weed grass control) - Pre-emergent control for annual weed grasses such as crabgrass, goose grass and barnyard grass and post emergent control of broadleaf weeds such as dandelion, clover, plantain & spurge.
1 Job $__________ $___________
Turf Application #4 (May 5th – 10th) – Second Post emergent control for crabgrass / weed grasses and broadleaf weeds applied in liquid form to entire turf acreage.
1 Job $__________ $___________
Turf Application #5 (June 1st - 5th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #6 – (July10th-15th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #7 – (July24th-29th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #8 -( August7th-11th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf where nutsedge is present
1 Job $__________ $__________
Turf Application #9 – (August 5th – 10th) - This application will be a treatment for the post emergent control of crabgrass and other weed grasses and yellow / purple nut sedge (sedge
Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
AERATION, OVER-SEEDING & SEEDING OF NEW OR REFILLED GRAVES
Aerate Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
Over-seed Entire Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
3025 Seeding Newly Dug or Refilled Graves 100 Job $ __________ $ ____________
TREE, SHRUB & PLANTING BED MAINTENANCE
Prune Cemetery Shrubs & Hedges (May & September)
2 Job $ __________ $ ____________
3027 Deadwood Prune Cemetery Trees 1 Job $ __________ $ ____________
Pre-Emergent Weed Application in Planting Beds
4 Job $ __________ $ ____________
Edge & Mulch Cemetery Planting Beds & Tree Rings
1 Job $ __________ $ ____________
MEMORIAL DAY CEREMONY
Memorial Day Ceremony: Set-up & removal of Avenue of Flags, installation of Portable Restroom at Rostrum and Raising & Lowering of U.S. Flag.
1 Job $ __________ $ ____________
Veterans Day Ceremony: Set-up & removal of approximately 50 Chairs (govt. owned) at the base of Cemetery Flagpole, and set up and removal of Avenue of flags.
1 Job $ __________ $ ____________
ON-CALL / EMERGENCY STORM DAMAGE & STUMP REMOVAL
“Hourly Rate” for On-call / emergency storm damage & stump removal Services (See Section A.6)
50 Hr. $ __________ $ ____________
GENERAL & EMERGENCY SMALL REPAIR SERVICES
Straight Time Hourly Rate - All labor will be charged at the hourly rate indicated in the Schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates and Parts Discount for General & Emergency Small Repair Services to be provided on an "As-Needed / As-Requested" basis (See Section A.7)
100 Hr. $ __________ $ ____________
OPTION YEAR III Total Estimated Cost: $ ____________
Option Year IV: October 1, 2022 thru September 30, 2023
CLIN
Description Est.
Qty Unit Unit Cost Total Cost
GROUNDS MAINTENANCE SERVICES
General, on-going and recurring cemetery Grounds Maintenance Services to include the following:
Mowing & removal of Debris /Grass Clippings.
Trimming of headstones, trees, curbs and fence lines.
Daily policing of cemetery grounds to include collection & removal of leaves, small branches & twigs, debris / trash, floral arrangements, and emptying trash receptacles.
Control / Trapping of moles.
Snow & Ice Removal to Include Roadways, Sidewalks, Building Entrances, Driveways & Parking Areas.
Raising & Lowering of U.S. Flag for scheduled Funeral Services.
12 MO $ _________ $ ___________
JANITORIAL SERVICES
Daily and as needed cleaning of space located in Administration Building, Public Restrooms adjacent to the Administration Building, Service Building and areas (See Section A.5)
12 MO $ __________ $ ____________
INTERMENT SERVICES
Grave Excavation & Backfilling: Casketed remains (second interments).
100 Ea. $ __________ $ ____________
Grave Excavation & Backfilling: Cremated remains (second interments).
65 Ea. $ __________ $ ____________
HEADSTONE MAINTENANCE
Clean Upright Headstones & Flat Markers (before Memorial Day).
88,000 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Upright Headstones
100 Ea. $ __________ $ ____________
Set & Align New-Initial and New-Replacement Flat Markers
65 Ea. $ __________ $ ____________
Remove, Break-up & Dispose of Unusable / Damaged / Replacement Upright Headstones and Flat Markers
150 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Upright Headstones.
5000 Ea. $ __________ $ ____________
Raise, Realign, Reset, Backfill & Clean existing standard Flat Markers
100 Ea. $ __________ $ ____________
Bump & Run: Realign headstones that have shifted out of alignment.
1000 Ea. $ __________ $ ____________
4012 Refill Sunken Graves 100 Ea. $ __________ $ ____________
TURF FERTILIZATION & WEED CONTROL
Turf Application #1 – Turf Application #1 (October 10th – 15th) -- Post emergent broad leaf weed control to include dandelion, plantain, chickweed, clover & other common broadleaf weeds. Applied in liquid form to the entire turf acreage using an appropriate broadleaf herbicide.
1 Job $__________ $___________
Turf Application #2 (November 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #3 (Applied in early spring at optimum time for pre-emergent crabgrass / weed grass control) - Pre-emergent control for annual weed grasses such as crabgrass, goose grass and barnyard grass and post emergent control of broadleaf weeds such as dandelion, clover, plantain & spurge.
1 Job $__________ $___________
Turf Application #4 (May 5th – 10th) – Second Post emergent control for crabgrass / weed grasses and broadleaf weeds applied in liquid form to entire turf acreage.
1 Job $__________ $___________
Turf Application #5 (June 1st - 5th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
Turf Application #6 – (July10th-15th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #7 – (July24th-29th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf with nutsedge present.
1 Job $__________ $__________
Turf Application #8 -( August7th-11th) Application of Dismiss or SedgeHammer herbicides to treat nutsedge in areas of turf where nutsedge is present
1 Job $__________ $__________
Turf Application #9 – (August 5th – 10th) - This application will be a treatment for the post emergent control of crabgrass and other weed grasses and yellow / purple nut sedge (sedge grasses) applied in liquid form.
1 Job $__________ $___________
Turf Application #10 (September 10th-15th) Granular turf fertilization using a fertilizer with a 25-5-10 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer will be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft.
1 Job $__________ $___________
AERATION, OVER-SEEDING & SEEDING OF NEW OR REFILLED GRAVES
Dethatch cemetery turf (April 1-10th) / Done in conjunction with Turf Application #7
1 Job $ __________ $ ____________
Aerate Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
Over-seed Entire Cemetery (September) Done in conjunction with Turf Application #10
1 Job $ __________ $ ____________
4026 Seeding Newly Dug or Refilled Graves 100 Job $ __________ $ ____________
TREE, SHRUB & PLANTING BED MAINTENANCE
Prune Cemetery Shrubs & Hedges (May & September)
2 Job $ __________ $ ____________
4028 Deadwood Prune Cemetery Trees 1 Job $ __________ $ ____________
Pre-Emergent Weed Application in Planting Beds
4 Job $ __________ $ ____________
Edge & Mulch Cemetery Planting Beds & Tree Rings
1 Job $ __________ $ ____________
MEMORIAL DAY CEREMONY
Memorial Day Ceremony: Set-up & removal of Avenue of Flags, installation of Portable Restroom at Rostrum and Raising & Lowering of U.S. Flag.
1 Job $ __________ $ ____________
Veterans Day Ceremony: Set-up & removal of approximately 50 Chairs (govt. owned), set up and removal of Avenue of Flags, at the base of Cemetery Flagpole.
1 Job $ __________ $ ____________
ON-CALL / EMERGENCY STORM DAMAGE & STUMP REMOVAL
“Hourly Rate” for On-call / emergency storm damage & stump removal Services (See Section A.6)
50 Hr. $ __________ $ ____________
GENERAL & EMERGENCY SMALL REPAIR SERVICES
Straight Time Hourly Rate - All labor will be charged at the hourly rate indicated in the Schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates and Parts Discount for General & Emergency Small Repair Services to be provided on an "As-Needed / As-Requested" basis (See Section A.7)
100 Hr. $ __________ $ ____________
OPTION YEAR III Total Estimated Cost: $ ____________
SUMMARY GRAND TOTAL
Beverly National Cemetery: Complete Ground Maintenance
CONTRACT SUMMARY SHEET
Base Year Period $ Option Year One $ Option Year Two $
Option Year Three $ Option Year Four $
TOTAL CONTRACT COST
BASE PERIOD + ALL OPTION YEARS: $____________________
(End of Price Schedule)
DESCRIPTION / SPECIFICATIONS / WORK STATEMENT
A.1 BACKGROUND
Beverly National Cemetery was established as a National Cemetery in 1864 with original interments made from soldiers who died in the hospitals of Beverly, NJ during the Civil War.
The cemetery is listed on the National Register of Historic Places and has five Medal of Honor recipients buried there. The cemetery which is closed to first interments, but completes several second interments a year is a satellite cemetery under the supervision of the Director and staff of the Washington Crossing National Cemetery which is located at 830 Highland Rd., Newtown Pa. 18940 approximately 21 miles from the Beverly National Cemetery.
Beverly National Cemetery is a National Shrine that honors our Veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The cemetery conducts both casketed and cremation burials, receiving many visitors therefore, standards of maintenance & appearance must reflect the Nation’s concern for those interred there. Because of the special significance and attention each national cemetery receives from the public, strict adherence to contract specifications, terms and condition is essential.
Every action by contractor personnel at a national cemetery must be performed with the exceptional care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
A.2 CONTRACT DEFINITIONS / ACRONYMS
(a) Business Hours & Days of Operation: Normal cemetery business hours / days of operation are 8:00AM to 4:30PM, Monday through Friday, excluding Federal Holidays.
(b) Contracting Officer (CO): VA official with the authority to enter into, administer, and/or terminate contracts. The Contracting Officer shall delegate one or more representatives to serve as the Contracting Officer’s Representative (COR). All administrative functions remain with the VA Contracting Officer.
(c) Contracting Officer’s Representative (COR): VA official responsible for providing contract oversight and technical guidance to the Contracting Officer. COR responsibilities include certification of invoices, placing orders for service, providing technical guidance to the Contractor and overseeing technical aspects of the contract.
(d) Cemetery Director (Administrator / Management Official): The Cemetery Director is the VA Official responsible for day-to-day oversight of a National Cemetery, including burying veterans and eligible family members, and maintaining cemetery grounds as a national shrine. The Cemetery Director and/or designee (hereon referred to as COR) are responsible for contract oversight.
(e) Contractor: The term “Contractor” as used herein refers to the prime Contractor, his/her employees, and any subcontractors and their employees. The Contractor is responsible for assuring its employees and subcontractors comply with all contract terms, conditions and provisions.
(f) National Cemetery Administration (NCA) Operational Standards & Measures:
Provides standards for performance in the key cemetery operational areas of Interments, Grounds Maintenance, Headstones, Markers and Equipment & Facilities Maintenance. A copy of NCA Operational Standards shall be provided to the Contractor by the COR.
(g) NCA Turf & Landscape Handbook 3420: Outlines procedures for the proper establishment and care of turf-grass in VA National Cemeteries. A copy of the handbook shall be provided to the Contractor by the COR.
(h) Applicable Publications: Every contractor and subcontractor shall comply with the Occupational Safety & Health Administration (OSHA) safety and health standards published in 29 CFR Part 1925 (Safety & Health Regulations for Federal Service Contracts). OSHA Safety & Health Regulations and any other publication referenced in this contract shall be with the same force and effect as if they were given in full text.
A.3 GENERAL REQUIREMENTS
(a) Contractor shall furnish all supervision, labor, materials, tools, supplies and equipment necessary to provide cemetery interments and grounds maintenance services at the Beverly National Cemetery as specified herein.
(b) All work shall be performed during normal cemetery hours of operation (8:00am -
4:30pm local time / Monday thru Friday). Work performed outside of normal work hours may be required for interments or ceremonies on Federal Holidays or weekends at the discretion and approval of the VA Contracting Officer’s Representative (COR). Contractor may make a written request to the COR to work outside of the normal work hours when needed to carry out the specifications of this contract.
(c) Place of Performance:
CEMETERY LOCATION
Beverly National Cemetery 916 Bridgeboro Road Beverly, NJ. 08010
TECHNICAL SPECIFICATIONS
The following index of services briefly describes the work involved. All services described in the Schedule, including Technical Specifications, Addenda, Terms, Conditions and Clauses of the contract shall form the complete requirement.
SECTION DESCRIPTION
A.4.1 GRAVE EXCAVATION & BACKFILLING OF CASKETED REMAINS
A.4.2 GRAVE EXCAVATION & BACKFILLING OF CREMATED REMAINS
A.4.3 HEADSTONE & MARKER CLEANING
A.4.4 SETTING & ALIGNMENT OF NEW- INITIAL / NEW-REPLACEMENT HEADSTONES& MARKERS
A.4.5 UNUSABLE / DAMAGED HEADSTONES & MARKERS
A.4.6 RAISE, LOWER, REALIGN, RESET, BACKFILL & CLEAN EXISTING UPRIGHT HEADSTONES
A.4.7 RAISE, LOWER, REALIGN, RESET, BACKFILL & CLEAN FLAT MARKERS
A.4.8 BUMP & RUN (REALIGN UPRIGHT HEADSTONES)
A.4.9 REFILL SUNKEN GRAVES
A.4.10 LAWN MAINTENANCE: TURF FERTILIZATION & WEED CONTROL
A.4.11 LAWN MAINTENANCE: SEEDING, AERATION & DETHATCHING
A.4.12 LAWN MAINTENANCE: MOWING AND REMOVAL OF DEBRIS & GRASS CLIPPINGS
A.4.13 TRIMMING: HEADSTONES, TREES, CURBS & FENCE LINES
A.4.14 TREE, SHRUB & PLANTING BED MAINTENANCE
A.4.15 TRASH, DEBRIS, LEAF & FALL LEAF REMOVAL
A.4.16 MOLE CONTROL / TRAPPING
A.4.17 SNOW & ICE REMOVAL
A.4.18 MEMORIAL DAY CEREMONY / VETERANS DAY CEREMONY
A.4.1 GRAVE EXCAVATION & BACKFILLING OF CASKETED REMAINS
(a) SCOPE: Work consists of excavating and backfilling gravesites. The COR shall notify the contractor one day in advance of any gravesite to be excavated.
Contractor shall be compensated for the exact number of interments accomplished.
(b) NCA STANDARDS:
(i) Standard 3.1: Each gravesite is excavated to assure uniformity with other gravesites in that burial section.
(ii) Standard 3.2: Integrity of existing graves, grave markers and other objects around the worksite shall be preserved.
(iii) Standard 3.3: Open graves are identified and protected by guards and markers appropriate to cemetery operations.
(iv) Standard 3.1: Outer burial receptacles awaiting installation are placed in an orderly manner.
(v) Standard 4.1: Committal services are conducted in clean and orderly shelters that provide for the safety, privacy, and special needs of the family.
(vi) Standard 5.1: All remains shall be handled in a manner that assures accurate placement and validation, and causes no damage to the casket or urn.
(vii) Standard 6.1: Each day’s burials are covered, tamped, initially groomed, marked and presentable for visitors before close of business each day.
(c) PROCEDURES:
(i) All gravesite excavations shall be accomplished in a manner, and with the upmost care as to prevent any damage to adjacent and existing burials. All gravesite excavations shall be completed within a minimum of one (1) hour prior to the interment service, and backfilled within one (1) hour after the interment service. When a grave liner is to be used, gravesite excavation shall be completed to allow the vault to be pre-set in the grave one (1) hour and fifteen (15) minutes prior to the service. The gravesite must be available for visitation within one (1) and one-half (½) hours after the interment service.
(ii) It shall be the COR’s’ responsibility to notify the Contractor of any underground utilities near gravesite excavations.
(iii) Gravesites measure approximately 5’ wide x 9’ in length unless otherwise advised by the COR, and shall be excavated to five (5) feet or seven (7) feet, depending on the number of interments. Prior to the start of the interment process, the COR shall advise the Contractor of the required depth, width, and length prior to any excavation operation and/or whether the interment shall be placed side by side.
(iv) When a gravesite is excavated to receive a second interment and is found to be of insufficient depth to permit the second interment, the COR shall be notified before any remains are lowered or moved within the gravesite location. The COR shall decide whether the existing remains shall be removed so that the grave can be dug at the proper depth to accommodate both interments or if the second remains shall be placed in the right or left half of the gravesite. The COR shall inform the Contractor on which procedure to follow. Arrangement and payment for the disinterment of remains from previous burials is the COR’s responsibility. Excavating the grave to a greater depth to accommodate an additional interment shall be the responsibility of the Contractor, and is considered as a part of the regular grave excavation price. The COR shall be present and shall be responsible for insuring the gravesite is deepened to accommodate the additional interment. The gravesite shall be screened from the public view during the removal and re-interment of any remains.
(v) Contractor shall ensure that excess backfill is retained for other grounds operations and removed from the cemetery grounds when storage area is full.
(vi) When the Contractor using power, equipment excavates a grave and it is necessary to remove the headstone, it shall be removed and replaced by the Contractor as specified by the COR.
(vii) When an excavation is five (5) feet deep or deeper, a worker is prohibited from entering the hole until the walls of the grave are shored in a safe and acceptable method as per OSHA Standards.
(viii) The burial service shall take place at the interment shelter, unless the COR approves a request from the next-of-kin for a gravesite service. After the service, the Contractor shall transfer the remains in a dignified manner to the proper gravesite following all NCA policies. The COR shall approve the mode of transportation for the remains. The Contractor shall be required to lower the casketed remains into the gravesite using a mechanical lowering device in a safe and efficient manner with dignity and without damage to the casket.
If any damage occurs to either a casket or grave liner, the Contractor shall reimburse the Government for all incurred costs.
(ix) For gravesite services, the Contractor shall neatly set-up greens in an orderly manner. All services shall require seating that shall consist of approximately six (6) to twelve (12) chairs dependant on the forecasted size of the funeral.
These items shall be in place at least one (1) hour prior to the burial service.
(x) The area where the burial service is to take place shall be clean, free of webs, and any other dirt or debris.
(xi) The Contractor shall bring the flag of the United States of America to half staff one half hour before the start of the first committal service and raise it to full staff one half hour after the conclusion of the last committal service each day.
The Contractor shall request additional flags from the Government as needed to ensure that the flag being flown is always in a presentable, “like new” condition.
(xii) The Contractor shall designate a member of his staff to keep visitors away from the open excavation and provide other duties as assigned by the COR.
(xiii) Backfill shall be brought to establish grade in one (1) foot lifts. Each lift shall be thoroughly compacted by means of a mechanical tamper. Care shall be taken to fill and compact all voids surrounding the graveliner to reduce subsequent ground settlement. Backfill should not be mounded but conform to existing grades. Established turf shall be removed from the gravesite prior to excavation with the use of a sod cutter with the intent for it to be reused on the gravesite once the burial is completed. The Contractor shall be responsible for watering all re-used sod to ensure that it roots properly and that it is maintained in a healthy, vigorous weed free condition. In instances where the sod may not be able to be reused, the gravesite shall be squared, tamped, top soiled and seeded in accordance with the procedures outlined in the Lawn Maintenance Applications portion of this contract. Any excess backfill shall be removed at the direction of the COR from the cemetery premises at the Contractors expense.
(xiv) When the grave is a second interment, the existing headstone shall be removed and carefully placed on a rack near the gravesite and then properly disposed of after the service. A temporary marker shall be centered at the head of the gravesite directly against the headstone.
(xv) The cemetery allows a maximum of (3) three floral bouquets, arrangements etc at the grave. The floral bouquets, arrangements, etc. left at the gravesite by the funeral party shall be neatly arranged upon the grave. Fixtures and stands from floral wreaths shall be removed before placing the wreath flat on the grave.
(xvi) Interment flowers shall be removed three (3) days, or when considered unsightly, after the interment and the gravesite fan raked clean of all debris.
A.4.2 GRAVE EXCAVATION & BACKFILLING OF CREMATED REMAINS
(a) SCOPE: Work consists of excavating and backfilling gravesites for cremated remains. The COR shall notify the Contractor one (1) day in advance of any gravesite to be excavated. Contractor shall be compensated for the exact number of interments accomplished.
(i) Standard 1.1: Graves and niches are marked with an accurate, complete and properly aligned temporary on the day on interment/inurnment.
(ii) Standard 3.1: Each gravesite is excavated to assure uniformity with other gravesites in that burial section.
(iii) Standard 3.2: Integrity of existing graves, grave markers and other objects around the worksite shall be preserved.
(iv) Standard 3.3: Open graves are identified and protected by guards and markers appropriate to cemetery operations.
(v) Standard 3.1: Outer burial receptacles awaiting installation are placed in an orderly manner.
(vi) Standard 4.1: Committal services are conducted in clean and orderly shelters that provide for the safety, privacy, and special needs of the family.
(vii) Standard 5.1: All remains shall be handled in a manner that assures accurate placement and validation, and causes no damage to the casket or urn.
(viii) Standard 6.1: Each day’s burials are covered, initially groomed, marked and presentable for visitors before close of business each day.
(i) All gravesite excavations shall be completed within a minimum of one (1) hour prior to the interment service, and backfilled within one (1) hour after the interment service. The gravesite must be available for visitation within one
(1) and one-half (½) hours after the interment service.
(ii) It shall be the COR’s responsibility to notify the Contractor of any underground utilities near gravesite excavations.
(iii) Overall dimensions of a gravesite measure approximately 3’ wide x 3’ in length unless otherwise advised by the COR and shall be excavated 8” square and three (3) feet deep at centerline and 12” from foot end of grave for the first interment of cremated remains (cremains). When a second interment of cremated remains (cremains) is being interred, the grave shall be excavated at 8” square and 3’ deep at centerline 20” from foot end of grave for the first interment of cremated remains. When multiple burial of cremated remains (cremains) are being interred on the same day in the same grave, both urns shall be entombed in the same excavated site following the above measurements, but depth shall be enough that 18” of soil shall cover the top of the urns.
(iv) When a gravesite is excavated to receive a second interment and is found to be of insufficient depth to permit the second…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.