36C78619B0019-0001000.docx

DOCX document 18 KB Posted

Attached to
Fort Bliss Grave Expansion - Proj 886CM3024 - IFB
Solicitation number
36C78619B0019
Issued by

About this file

36C78619B0019 0001 36C78619B0019 0001.docx

View the file

Other files

File Type Posted
36C78619C0131-000.docx DOCX document
36C78619B0019-0003000.docx DOCX document
36C78619B0019-0003000.docx DOCX document
36C78619B0019-0002000.docx DOCX document
36C78619B0019-0002000.docx DOCX document
36C78619B0019-0001002.pdf PDF
36C78619B0019-0001001.pdf PDF
36C78619B0019-0001000.docx DOCX document
36C78619B0019-0001003.pdf PDF
36C78619B0019-0001002.pdf PDF
36C78619B0019-0001003.pdf PDF
36C78619B0019-0001001.pdf PDF
36C78619B0019-007.docx DOCX document
36C78619B0019-014.pdf PDF
36C78619B0019-012.pdf PDF
36C78619B0019-008.pdf PDF
36C78619B0019-009.pdf PDF
36C78619B0019-010.pdf PDF
36C78619B0019-011.pdf PDF
36C78619B0019-013.pdf PDF
36C78619B0019-014.pdf PDF
36C78619B0019-007.docx DOCX document
36C78619B0019-012.pdf PDF
36C78619B0019-011.pdf PDF
36C78619B0019-009.pdf PDF
36C78619B0019-010.pdf PDF
36C78619B0019-013.pdf PDF
36C78619B0019-008.pdf PDF
36C78619B0019-000.docx DOCX document
36C78619B0019-000.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-11-2019

886CM3024

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78619B0019 08-11-2019

X X X

August 28, 2019 at 2:00 pm EST X The purpose of the solicitation amendment-0001 to to provide Government responses to Contractor questions and to upload three (3) new attachment documents for this IFB.

See CONTINUATION page for details.

Jerry L. Hodson Jr.

CONTINUATION PAGE

AMENDMENT-0001, Solicitation 36C78619B0019 Ft Bliss_Grave Expansion_Proj 886CM3024 Contractor Questions & GOV Responses

1. GC100 shows that the area west of the project site can be utilized for spoils – are we correct in assuming all excess material will be disposed of in the area marked on the plan or do we need to assume excess material will be hauled offsite?

1. GOV Response: Excess material may be disposed of south of the proposed burial expansion, as shown on the plans. The Contractor is responsible for ensuring excess material is neatly distributed within this section in anticipation of future burial expansion and to ensure effective drainage.

2. Please provide specs for the chain-link fence and the stone wall end piers?

2. GOV Response: Please see Chain Link Fence specification section for fence specs. Please see Stonewall End Pier plan sheet for wall specs. Mortar for Stonewall End Pier shall match existing (Type O mortar - 1 part Portland cement, 2 parts non-hydraulic hydrated lime and 8 parts sand).

3. I have a question regarding the top dress products. Both top dress product 1, MCKSCRN0004 and top dress product 2, MCKSCRN0008 are both described as Franklin Red Screenings. Is there a difference in color or gradation for these two products?

3. GOV Response: See attach material sheet Red Screenings MCKSCRN0004 and material sheet Primary Screenings MCKSCRN0008 for the material property sheets for the two top dress products. Yes, they are different sizes.

See attached document: S06 Amedment0001 Attach1 Additional Specifications.

See attached document: S06 Amedment0001 Attach2 Red Screenings MCKSCRN0004.

See attached document: S06 Amedment0001 Attach3 Primary Screenings MCKSCRN0008.

End of Document

File details come from the government source that posted it.