- Solicitation number
- 36C78618R0191
About this file
36C78618R0191 00002 36C78618R0191 00002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618R0191-00001000.docx | DOCX document | |
| 36C78618R0191-002.pdf | ||
| 36C78618R0191-001.docx | DOCX document | |
| 36C78618R0191-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 Shrine NCA Stafford Contract Service Barrett Heights Rd, Ste 309 Stafford VA 22556
To all Offerors/Bidders
36C78618R0191 04-09-2018
X X X X This Amendment is to poast RFI 1-7. Please see following pages.
Katherine Iacovelli Contract Officer
RFP 36C78618R0191
Ft Snelling National Cemetery Raise/realign and Turf Renovation
RFI 1- 7
1) Ref: Page 55, Guidance Specifications. Do the existing flat markers have market grids installed? If so, will they need to be replaced, reused if in suitable condition, or is the decision at the discretion of the contractor?
borders?
A. Sections P1, R1, S, and Q have plastic marker grid installed.
2) Ref: Discrepancy between Section E.8 Para 3, Bullet 7, Page 103 and the Table, Row 4 on Page 103.
How many past performance references are desired; five or three?
A. Five.
3) Ref: Attachment B., 2.1.3.b. Page 42; Flat Marker Description stating “Some markers may be set in concrete and have a concrete border. For workload analysis / pricing purposes, can the Government offer an approximate number or percentage of flat markers that might be set in concrete or have concrete borders?
A. There are none.
4) Ref: Attachment P, Past Performance Questionnaire and Instructions to use this ‘form’.
Comment: The ‘administrative information’ takes up major space, leaving only 13-15 lines to describe the services provided, relevancy, complexity, etc. To repeat the same ‘Contractor Information’ on all three past performance references is redundant. May we submit a similar yet compliant one-page format to provide the requested information while offering more room to detail the evaluation considerations such as: quality of service, schedule, business relations, management of key personnel, safety, and overall performance?
A. No. This is for overview purposes. Your references will be contacted. As the references are to be from similar projects, there should be no need to state how they are similar.
5) Ref: E.8 Instructions to Offerors; Quote Package Format; Bullet 6, Page 103 requesting “2 sets of resumes for everyone non-administrative performing work”. The ‘everyone’ implies every hands-on laborer, from the Raise-Realign laborers to the Turf Renovation team members, to those we employ to perform headstone cleaning or even site cleanup. Will the Government consider identifying the ‘Key Personnel’ resumes offerors are to submit?
A. The whole sentence states, “2 sets of resumes for everyone non-administrative in positions above laborers performing work on the contract.” This is to include key personnel and foremen, supervisors and whomever is performing the QA.
6) Ref: E.8 Instructions to Offerors; Rating Standards; (1) Technical Equipment List ‘Blue’ and (3) Technical Methodology ‘Blue’. The references standards are exactly the same, stating: “Proposal exceeds the minimum requirements of the solicitation with enough equipment more than adequate in size, age or type and a plan for replacing broken equipment immediately.” Can you please clarify?
A. The ratings should read the following Green: Proposal meets the minimum requirements of the solicitation showing the understanding of the requirements, specifications, time to complete and ability to complete the projects on time, budget and to specs.
Blue: Proposal exceeds the minimum requirements of the solicitation showing the understanding of the requirements, specifications, time to complete and ability to complete the projects on time, budget and to specs.
7) Ref: Solicitation Page 55; Guidance Specification Exhibit J. The specification references Marker Grids for Flat Markers. Are there currently marker grids installed for the existing Flat Markers? If so, will they need to be replaced, reused, or is that at the discretion of the contractor?