36C78618R0107-00001000.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C78618R0107
About this file
36C78618R0107 00001 36C78618R0107 00001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618D0214-000.docx | DOCX document | |
| 36C78618R0107-00003000.docx | DOCX document | |
| 36C78618R0107-00002000.docx | DOCX document | |
| 36C78618R0107-014.pdf | ||
| 36C78618R0107-013.docx | DOCX document | |
| 36C78618R0107-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C786-18-R-0107 AMENDMENT NO. 00001 DATED: February 1, 2018
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 02-01-2018 8318-000001 N/A Deparment of Veterans Affairs National Cemetery Administration (NCA) Contracting Services Division 75 Heights Road Suite Stafford VA 22556 Same As Block 6.
To all Offerors/Bidders
36C78618R0107 02-01-2018
X X X N/A This amendment is written to clarify and correct the following changes:
A. Reference Page 2 of RFP 36C786-18-R-0107, Table of Contents, page 2, B-2: Is hereby change to read:
BEAUFORT
NATIONAL CEMETERY.
B. Reference Page 7, Title - Price Schedule - is hereby replaced with page 2 of this amendment.
C. Reference Page 46, Section D, Attachments: The solicitation list it as an attachment when in FACT it’s included
In the RFP and can be found on pages 47 thru 49.
XXXXXXXXXXXLAST ITEM – ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
B.2 Price/Cost Schedule- Beaufort National Cemetery Contract period will consist of a base period from Date of Award through September 30, 2018, with four one-year options to extend the term of the contract through September 30, 2022. Units and services to be in accordance with Statement of Work, attached technical specifications, and the terms and conditions contained in this solicitation.
BASE YEAR (Date of Award – Sep 30, 2018)
| CLIN |
| ITEM |
| EST QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001 |
| Headstone cleaning and maintenance. (twice per year) |
| 39,800 |
| Each |
| 0002 |
| Headstone receiving and setting |
| 325 |
| Each |
| 0003 |
| Niche Cover receiving and setting |
| 100 |
| Each |
| 0004 |
| Headstone replacements, including pulling and setting. |
| 225 |
| Each |
| 0005 |
| Raise and Re-align headstones in sections as required. |
| 125 |
| Each |
| 0006 |
| Fine Tune Alignment of headstones as required. |
| 200 |
| Each |
| 0007 |
| Sunken Grave Repair. Repair of damaged turf. Top dressing/grade adjustment. |
| 150 |
| Each |
| 0008 |
| Grounds Maintenance Services to include weekly mowing of turf grass. (Approximately 50 acres) |
| 44 |
| Week |
| 0009 |
| Grounds Maintenance Services to include weekly headstone trimming (21,000 Headstones), trimming and edging of grass along roadways, sidewalks, curbs, tree wells and around plant beds. |
| 44 |
| Week |
| 0010 |
| Grounds Maintenance Services to include weekly weeding of tree wells and mulch beds. |
| 44 |
| Week |
| 0011 |
| Bi- annual removal and replacement of mulch in all landscape beds and tree wells / (Main Entrance, East and West Entrances, 2 Shelters, Tree Beds, Barrier bed between historic portion and expansion area, Columbarium, Flagpole, Admin Bldg., etc.) (approximately 180 trees) *Mulch supplied by the contractor |
| 2 |
| Job |
| 0012 |
| Grounds Maintenance Services to include fertilization of plant beds and trees. (Minimum of 4 times per year) |
| 4 |
| Job |
End of Document
File details come from the government source that posted it.