36C78618R0049-00002000.docx
DOCX document 18 KB Posted
- Attached to
- Dallas/Ft Worth National Cemetery: Replace irrigation main isolation valves, Project No. 789CM3917
- Solicitation number
- 36C78618R0049
About this file
36C78618R0049 00002 36C78618R0049 00002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0057-000.docx | DOCX document | |
| 36C78618R0049-00004000.docx | DOCX document | |
| 36C78618R0049-00003000.docx | DOCX document | |
| 36C78618R0049-00002001.pdf | ||
| 36C78618R0049-00001001.pdf | ||
| 36C78618R0049-00001000.docx | DOCX document | |
| 36C78618R0049-00001002.pdf | ||
| 36C78618R0049-003.pdf | ||
| 36C78618R0049-004.pdf | ||
| 36C78618R0049-005.pdf | ||
| 36C78618R0049-001.docx | DOCX document | |
| 36C78618R0049-002.pdf | ||
| 36C78618R0049-006.pdf | ||
| 36C78618R0049-008.pdf | ||
| 36C78618R0049-007.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 12-11-2017 7897-000011
789CM3917
43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford
VA
22556
To all Offerors/Bidders
36C78618R0049 11-27-2017
X X X X Government responses to questions are provided. See the continuation page.
The attached drawing “L-201 (Revised 12-11-17)” is hereby incorporated into solicitation 36C78618R0049 and replaces “Drawing L-201: Water Details” specified in Statement of Work part “K. Plans/details”, and drawing dated 12-6-17 previously provided in Amendment 00001.
All other terms and conditions remain unchanged.
David J. Dixon Contracting Officer
CONTINUATION PAGE
Government Responses to Questions
1. Are RPLS stamped As-builts required?
a. Response: Stamped as-builts are not required.
2. Is a project sign required?
a. Response: A project sign is not required.
3. Do the valve boxes require engraving/tags
a. Response: Per the Spec Section 33 10 00 paragraph 2.4, the cast iron valve box cover shall have the word “WATER” cast in. That is the only labeling/tagging required.
4. the revised detail does not show coupler with the replacement valve. Shouldn’t one be shown since this is an existing buried pipe?
In new construction we would not need a coupler but on existing we can’t separate the pipe enough to get valve in without a coupler.
a. Response: See revised drawing with coupler.
See attached document: L-201 (Revised 12-11-17).