36C78618Q9664-004.docx

DOCX document 182 KB Posted

Attached to
FY19 New Contract - ON-SITE INSCRIPTION PROGRAM - SARASOTA National Cemetery
Solicitation number
36C78618Q9664
Issued by

About this file

36C78618Q9664 ATTACHMENT D-P09 SOW - On Site Incription Contract - Sarasota NC FY19 (3).docx

View the file

Other files

File Type Posted
36C78619D0019-001.docx DOCX document
36C78619D0019-000.docx DOCX document
36C78618Q9664-011.pdf PDF
36C78618Q9664-005.pdf PDF
36C78618Q9664-002.pdf PDF
36C78618Q9664-013.pdf PDF
36C78618Q9664-012.pdf PDF
36C78618Q9664-008.pdf PDF
36C78618Q9664-017.pdf PDF
36C78618Q9664-010.pdf PDF
36C78618Q9664-007.pdf PDF
36C78618Q9664-009.pdf PDF
36C78618Q9664-000.docx DOCX document
36C78618Q9664-001.docx DOCX document
36C78618Q9664-003.docx DOCX document
36C78618Q9664-014.pdf PDF
36C78618Q9664-016.pdf PDF
36C78618Q9664-015.pdf PDF
36C78618Q9664-006.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.3 DESCRIPTIONS/SPECIFICATION/STATEMENT OF WORK

1. Background: The Department of Veterans Affairs (VA), National Cemetery Administration (NCA) furnishes headstones, markers, medallions and niche covers for deceased veterans worldwide. Memorial headstones, markers and niche covers are also furnished to memorialize veterans whose remains are non-recoverable.

1. Purpose: The purpose of this contract is to provide On-Site Inscription Services at:

Sarasota National Cemetery 9810 State Rad 72 Sarasota, FL 34241 Telephone: (941) 922-7200

1. General: This contract shall provide all labor and materials necessary to perform inscription services on cemetery inspected and approved, government owned headstones, markers and niche covers, on-site at the cemetery listed in (2.0) above. (Refer to Addendum 5)

1. Performance Period: The contractor shall have (10) business days, excluding federal holidays, as counted from the date following the day an order is sent to the contractor until the monuments are produced and made available to the cemetery for acceptance.

1. Unit Price: The unit price is all-inclusive and covers the complete inscription ordered, regardless of the total number of lines or characters. The unit price shall be the total price paid for each monument inscribed, FOB Destination.

1. Material Specifications:

5. Description #1:Inscription of Niche Cover, Marble
Product Code:I1
Drawing No.:A-BNC-1, Rev. 2, dated 11/11/13
A-NCIS-1 thru 2, Rev. B, dated 11/18/2013
5. Description #2:Inscription of Upright Headstone, Marble
Product Code:U1
Drawing No.:A-U1-1 thru 2, Rev. 1, dated 01/29/14
5. Description #3:Inscription of Upright Headstone, Marble (Rear Face)
Product Code:R2
Drawing No.:A-U1-2, Rev. 1, dated 01/29/14

5. Inscription Specification: Letters, Fonts, Numbers & Other Characters for Government, Headstones, Markers and Niche Covers Drawing No.: A-LFN&OC-1 thru 3, Rev -, dated 6/13/2016

5. Emblems Drawing No.: A-EM Cover Page, dated 6/28/2018 A-EM-1 Rev, dated 12/23/2017 A-EM-2 Rev, dated 12/23/2017 A-EM-3 Rev, dated 12/23/2017 A-EM-4 Rev, dated 12/23/2017 A-EM-5 Rev, dated 6/28/2018

1. Government Furnished Property: The contractor shall be responsible for the security and protection of blanks, which are considered government furnished property, provided to the contractor in connection with this contract. All blanks and inscribed headstones that do not meet the specifications pre-and post-inscription shall be considered rejects and the quantity shall be reported to the cemetery point of contact and to MPSProgSupport@va.gov.

1. Scope of work

7. Contract Period: This contract covers the period from October 1, 2018 thru September 30, 2019 with (4) 1-year options, if exercised, to extend the term of the contract through September 30, 2023.

7. Contractor Services: This service includes all labor and materials necessary to provide:

1. New inscriptions to government furnished blank upright marble headstones (U1/R2)

1. New inscriptions to government furnished blank marble niche covers (I1)

1. All inscriptions work shall be inscribed in a dedicated area with the exception of the reverse inscription which will be done at the gravesite within the cemetery property.

1. Workmanship: Monuments shall be free from defects due to broken or blown out lettering. Repairs or patching of any such defects or the presence of oils, scuff marks, glue, crayon marks, direct adhesive and excessive dust shall be a cause for rejection.

1. Product:

9. The contractor shall inscribe all information contained on an order. The contractor’s pricing in the schedule is an all-inclusive price. This all-inclusive price includes all items as shown on the technical drawings listed in section 6.0. The end or limit of each line shall be indicated on a line-by-line basis as shown on the order. If any deviation from this is encountered, the contractor must contact the MPS Program Unit at MPSProgSupport@va.gov.

9. Inscriptions shall be made using an air blast abrasion with a suitable non-hazardous aggregate. The inscription shall have depths consistent with what is referenced in the technical drawing and shall conform to the dimensions of letters and inscriptions as shown on the drawings. The layout of letters, numbers and emblems shall conform to scenarios in the technical drawings.

9. Lithichrome shall not be used on inscriptions provided under this contract. Whenever lithichrome is required, “ADD LITHICHROME” shall be notated on the order. When lithichrome is applied, it shall be N4 or lower as judged against the Munsell Neutral Value Scale, Matte (31-step scale).

1. Submittal by Potential Offerors:

10. All potential offerors shall submit at their expense (one) marble inscription sample by the closing date of this solicitation. The samples shall be used to determine potential awardees’ ability to manufacture on-site inscriptions. The samples shall be clearly marked (on the back) with permanent marker to show the following: Contractor name and Solicitation Number. Refer to Addendum 1 & 2 for additional evaluation criteria.

10. Samples shall be received by Memorial Products Service (MPS) prior to closing date. If one or more of the samples are disapproved by MPS, a notification attempt will be made via phone and/or email. Potential offerors shall have until closing date of the solicitation to resubmit another sample.

10. Inscribed Niche Inscription Marble (I1) Sample:

The following dimensions and inscription shall be used for this sample.

One (1) I1 marble sample 15-3/4” x 11-1/4” x ¾”

Emblem #25 (refer to drawings for actual emblem to be inscribed)

GRIFFIN

MARSHALL P Jr (refer to drawings for correct size of “r”) 1st LT USA (refer to drawings for correct size of “st”)

KOREA VIETNAM

1932 2008

10. Inscribed Upright Marble Headstone(/U1) Sample:

The following dimensions and inscription shall be used for this sample:

One (1) marble sample 24” x 13” x ¾”

Front

Emblem #60 (refer to drawings for actual emblem to be inscribed)

MARSHALL P

GRIFFIN Jr (refer to drawings for correct size of “r”) 1st LT (refer to drawings for correct size of “st”)

US ARMY

KOREA

VIETNAM

MAR 1 1932

OCT 4 2008

PURPLE HEART

AIR MEDAL

101 ABN DIV

Rear

AA 1234 (Refer to applicable drawing for layout of section and grave number as it applies to the R2 headstone.

10. All potential offerors who have submitted and received approval notification for a sample of the sample type listed in this Statement of Work within the last 12 months may submit a copy of that approved review with the bid to avoid submitting a full size sample.

10. The sample(s) shall be received by Memorial Products Service (MPS) prior to closing date. If a sample is disapproved by MPS you shall receive notification by the Program Support Unit and you have until the closing date of solicitation to resubmit samples.

NO samples will be accepted after closing date.

Once submitted the sample(s) becomes the property of the Department of Veterans Affairs and will not be returned. Submit sample(s) and test results to the following address:

Department of Veterans Affairs Memorial Programs Service Program Support Unit, Rm. 600J 1575 Eye Street, NW Washington, DC 20005

10. Full size copies of these drawings are available upon request at no additional charge to potential vendors. The request should be e-mailed to the NCA Memorial Products Service (MPS) Program Support Unit at MPSProgSupport@va.gov and should include the contractor’s name, physical street address, phone number, e-mail address, and the name of the drawing(s) requested. If hard copies of the drawings are desired, e-mail the request to MPS with sufficient time for the drawing to be mailed. MPS recommends vendors use full size drawings for determining work requirements. An extension to the solicitation’s closing date may not be granted for failure to request the technical drawings with sufficient lead time.

1. Contractor Requirements: On site inscription services shall begin no later than (30) days after contractor award date. Before submitting a bid, it is the responsibility of the contractor to perform due diligence for the contract requirements, and for the cemetery’s site requirements and, to examine the pre-determined location of the sandblasting area within the cemetery property.

1. On-Site Inscription Blasting Structure: Contractor shall be required to provide and maintain a secure portable structure(s) to perform sandblasting operation, store equipment and for possible curing of headstones prior to sandblasting. The structure (s) shall be built so work can proceed without regard to weather conditions and power outages. The site for the blasting structure/storage and inspection area shall be located within the cemetery property in the areas shown in diagram (Addendum ??).

12. Shed/structure can be manufactured of wood or metal but shall be portable and temporary.

12. Shed/.structure is to be placed on concrete piers, tied down or secured in case of extreme weather conditions.

12. Contractor is not authorized to form, pour or subcontract out for a cement foundation for the shed(s) on cemetery property.

12. Two (2) portable sheds can be built or moved to the location selected by the cemetery with one setup for sandblasting of headstones/markers and the second used for equipment storage, documentation order generation, cutting of stencils, etc. An area that is undercover shall be constructed for the purpose of drying and prepping of the stone.

12. Electrical power is to be supplied by either a contractor-owned or rented generator or by the local power company through which the contractor would affect coordination and establish purchasing arrangements. Before any installation of electrical power by the local power company, the plan must be pre-approved by the cemetery director and MPS.

12. If water is required and not on the location, the contractor is responsible for bringing in water for use in the sandblasting operation.

12. Dust handling equipment shall be in place within the sandblasting shed before inscription services begin. The dust handling system needs to capture dust grit from the sandblasting operation and not allow the dust to ventilate to the outside environment.

12. The structure shall abate noise to <60 dBa within (500) feet of the sandblasting facility so as not to disturb visitors or disrupt services at the cemetery.

12. A portable toilet shall be brought into the location since contractor personnel are not permitted use of the cemetery restrooms.

12. Contractor is responsible for all inscription related waste clean-up and it’s disposal off the cemetery’s premises.

12. Contractor is to use a non-hazardous sandblasting material and have obtained an MSDS for the material which shall be at the on-site location for inspection.

12. Any hazardous substance or liquids that is used in the inscription operation, i.e., gasoline or diesel fuel for a generator, lacquer thinner, lithichrome paint, etc., shall be handled, stored, and transferred in accordance with all OSHA, EPA, and DOT laws, regulations and recommendations.

12. If at the beginning of the contract, the pre-determined sandblasting location is only temporary due to cemetery construction, the contractor is responsible for moving his property to a new permanent site location when it becomes available. The contractor shall have (15) days to relocate or arrange for the relocation of his equipment and buildings.

12. At the end of the on-site contract or sooner, if an option year is not renewed, the contractor shall be responsible for removing his property to include portable sheds, awnings, equipment, etc., and shall have (15) days to accomplish this and is responsible for repairing and/or restoring the site to its original condition.

12. Upon receipt of pallets of blank headstones and niche covers from the cemetery, the contractor shall be responsible for setting up the monuments for inspection by cemetery personnel before inscribing the stones. Upon satisfactory completion of the inscribing, the inscribed monuments shall be moved by cemetery staff to be set at the gravesite. The contractor must not abdicate responsibility for performing a quality control review prior to the cemetery’s staff removing the monument(s) to the gravesite. The contractor is responsible for the final review which ensures the monument is satisfactorily completed prior to being set.

12. Contractor and cemetery staff will be responsible for completing Appendix B and C when transferring blank and inscribed headstones. (Refer to 19.0)

1. Cemetery Requirements

13. Checking In Upon Arrival and Departure: The contractor shall be required to check in with a pre-determined cemetery representative upon each arrival to the cemetery and to provide the representative a listing of the inscriptions that shall be completed on a specific day. This listing should include the decedents’ name and section/grave number for each decedent’s gravesite. Upon departure from the cemetery, the contractor is required to provide the cemetery representative a listing of the inscriptions that were completed. If the contractor did not complete all inscriptions as originally planned, the contractor should inform the cemetery representative of the contractor’s intended return date to complete any pending inscriptions.

13. Authorized Working Hours: All work for contract performance at the cemetery shall be performed between the hours of 8:00 a.m. and 4:30 p.m., local time, Monday through Friday, excluding Federal holidays. Work performed during non-duty hours, weekends and holidays will be at the discretion and with the written approval of the cemetery director and at no additional cost to the Government.

13. Impact on other Cemetery Operations: The contractor agrees to phase all work in a manner that does not impact with cemetery operations. As a general rule-of-thumb, work involving power equipment should not take place within 1,000 feet (305m) of an on-going committal service or ceremony.

13. Conduct on Cemetery Property: While performing work on cemetery property, contractor personnel shall adhere to the following standards of dress and conduct. These standards and regulations are enforceable under Title 38, U.S.C., Section 218.

3. National cemeteries are shrines; contractor personnel appearance and conduct shall be professional and unobtrusive at all times. All contractor personnel shall wear long pants while on cemetery grounds unless approved in writing by the cemetery director.

3. Contractor personnel shall not sleep on cemetery grounds, sit, and lean or stand on erected headstones, or put equipment or materials on erected monuments, nor lean or place any equipment or materials on erected monuments.

3. Questions from cemetery visitors shall be politely referred or directed to cemetery personnel.

3. Contractor personnel will behave with appropriate decorum, courtesy, and respect while within the cemetery or at its’ perimeter or entrances. Shouting, cursing, use of personal radios, angry outbursts, sleeping, intoxication, spitting, unsafe driving of private or company vehicles, and violence or criminal acts of any kind shall not be tolerated and are cause for immediate removal from the cemetery, and shall jeopardize the contractor’s chance of receiving an award a future contract or the renewal of a current contract.

3. The contractor shall ensure all motor vehicles used in this contract meet State Inspection, safety, licensing, registration, and insurance requirements. All contract personnel operating vehicles shall have a valid driver’s license.

3. Contractor shall be responsible for safety training of on-site personnel. When blasting on-site, the blasting personnel shall wear a personal protective garment to cover the body from the waist to neck and long pants or a protective apron. The contractor is also responsible for providing a breathing apparatus for employees when blasting.

3. Garments displaying a “message” or slogan” other than the contractor’s business name are prohibited. Offensive tattoos shall be covered.

3. Public restrooms at the cemetery are for visitors only. The contractor is responsible for either providing a portable toilet that is maintained and kept clean or using restroom facilities off-site.

3. Breaks and lunch while on cemetery property shall be taken in areas approved by the cemetery administrator.

3. At least one contractor staff member must speak fluent English when the contractor is working on cemetery grounds.

3. Personnel shall remove all personal protective equipment, such as eye/or face protection, respiratory protection, and gloves, as well as required protective clothing/garments before leaving the worksite.

1. Government Quality Assurance (QA)

14. Site Inspections: Quality assurance (QA) inspections of the contractor’s manufacturing facility and of the completed on-site work at cemetery shall be conducted during the contract period by the designated COR of the Memorial Products Service, Program Support Unit and the designated alternate cemetery COR to assure contract performance. Visits to the Contractor and the cemetery shall be scheduled at a time so as to ensure inspection of the Contractor’s production. The Government reserves the right to perform quality audit inspections without prior scheduling or notifications to the contractor.

14. During each QA visit, a complete assessment of the Contractor’s operation shall be made, to include the following areas:

1. Performing quality inspections

1. Maintaining QA records indicating the quality of the inscribed headstones and,

1. Maintain a working area, including storage building, sandblasting and other equipment, in a manner that is in compliance with state or other environmental and health regulations.

1. Contractor’s Quality System

15. Reporting: The contractor shall develop and maintain a written inspection system that documents the quality and timeliness of finished products. The contractor shall provide, to the designated COR of the MPS Program Support Unit and the cemetery ACOR, reports on the contractors’ processing and completed deliveries. Weekly reports shall be emailed to MPS MPSProgSupport@va.gov, attention of the designated COR. The reports shall be due to the designated COR by the close of business on Tuesday of each week. Should this day fall on a holiday, the report shall be submitted the day before the holiday. Each report shall include the following information on daily basis:

0. Date order received

0. Purchase order number

0. Shipment numbers

0. Quantity of items associated with each shipment number

0. Date provided

0. Quantity of orders provided

0. Quantity of orders pending

0. Estimated completion dates for pending orders

0. Date of invoice, invoice number, quantity per invoice, invoice dollar amount

0. Number of orders cancelled (include shipment number and name)

0. Blanks Received

0. Blanks on Hand

0. Blanks not used due to blatant defects that were inspected and accepted by cemetery representative

15. Quality Complaints: The contractor is responsible for the performance of all inspections and quality assurance required by this contract. The contractor shall develop and maintain a written inspection system that documents the quality of all finished products resulting from the inscription of government headstones. The government reserves the right to perform any inspections deemed necessary to assure headstones are supplied in accordance with the specifications of the contract.

15. The receipt of a quality complaint or a quality audit inspection indicating non-compliance with the specifications/contract shall be considered reason for a visit and review of the contractor’s quality assurance program. The Government reserves the right to impose 100% Government Quality Inspection for an indefinite period due to quality problems. Indicative, but not all-inclusive, examples are:

2. Nonconforming on headstone/niche cover inscriptions

2. Completed on site upright marble inscriptions and marble niche inscriptions that passed the contractor’s inspection system but fail the Quality Inspection of the designated COR

2. Deficiencies that adversely affect performance of the contract existing in areas such as:

2. Inspection system

2. Inspection personnel

2. Manufacturing process

2. Production control

2. Planning and scheduling

2. Employee training

2. Safety

15. The designated ACOR for the cemetery shall inform the Contractor of noted deficiencies and shall discuss with the contractor what corrective action(s) will be taken.

15. When issue(s) arise regarding an inscription on a monument not meeting the specifications standards and the issue(s) cannot be resolved between the Contractor and cemetery’s ACOR, the discrepancy will be routed to the primary COR within MPS. If further action is needed, the Contracting Officer shall make a final determination as to whether the monument shall be replaced at contractor’s or at Government’s expense.

15. Contractor Records and Files: The Contractor shall maintain records and files of all documents relating to each order filled under each Government Headstone and Marker contract. Said files shall minimally contain, manufacturing quality assurance checklist, final inspection and acceptance reports, Delivery Order Numbers, dates completed and date invoiced. Said files are in addition to any similar information provided to or by the government and shall be available upon request to the designated COR during on-site quality assurance inspections.

A running status report for all completions shall be e-mailed to MPSProgSupport@va.gov by the close of business on Tuesdays. If any order is completed late or projected to be completed beyond the contractually required due date, the contractor shall identify the reason(s) for the delinquency, what actions are underway to resolve the tardiness, and the projected future date for completion (projected completion dates which are past the reporting date are unacceptable).

1. PROCESSING OF ORDERS AND TIME OF DELIVERY:

16. Email Address: Contractors shall provide a single email address for electronically receiving orders. Orders shall be electronically distributed by MPS to the contractor’s provided email address, Monday thru Friday, excluding federal holidays. Contractors shall complete orders on a first in/first out basis, except for those items where accelerated delivery is requested. Each order for Normal delivery shall be produced in numerical sequence, by shipment number (FIFO – first in, first out).

16. Normal delivery: All monuments with the exception of those identified for accelerated delivery shall be manufactured, inspected and released to the cemetery within (10) calendar days following the date the order was sent to MPS.

16. Accelerated Request (Casualties of War): It is the goal of NCA to ensure the grave of active duty service members who die as a result of enemy action is marked on the day of interment. When the cemetery director or MPS is made aware of a pending burial request for a U.S. casualty of war, they will provide to the contractor the inscription. These orders are estimated to be less than 1% of the estimated orders for the life of the contract. The Government will provide the inscription to the contractor with not less than (2) calendar days advance notification, and advise the contractor when the inscription needs to be completed. All inscriptions identified as an accelerated delivery shall be provided at no additional cost to the government for the accelerated processing.

16. Inscription Correction/Cancellations of Orders: Occasionally, it shall be necessary to request from the contractor that a correction is made or that an order be cancelled. These corrections/cancellations shall be forwarded by e-mail to the contractor only by the MPS Program Support Unit and within one (1) business day of receipt of the order. The contractor will be required to respond to each e-mailed request from the MPS Program Support Unit within one (1) business day following receipt of the correction or cancellation.

16. Replacements-in-Kind: It may be occasionally necessary to order an emblem, symbol, or format which differs from current approved forms. These rare occurrences must be provided by the contractor as replacements-in-kind at no additional cost

1. Use of Appendix B – Transfer of Government-Furnished Headstones, Markers or Niche Covers and Appendix C – Completion of Inscription Service(s) (Process Responsibilities) (Reference Addendum 3)

17. The contractor is NOT responsible for unloading pallets of government-owned blanks from delivery trucks, nor for ensuring the number of pallets and monuments match what is stated on the bill of lading, nor for signing the bill of lading. The contractor is NOT responsible for the inspection of blanks.

17. Cemetery personnel are responsible for the storage of the newly received government-owned blanks until they are inspected by cemetery personnel, and their receipt is acknowledged by the contractor using the Appendix B – Transfer of Government-Furnished Headstones, Markers or Niche Covers form.

17. Cemetery personnel are responsible for transferring to the contractor a pre-determined quantity of government-owned blanks by completing the Appendix B - Transfer of Government-Furnished Headstones, Markers or Niche Covers form (NCA Handbook 3320).

17. Cemetery personnel must complete the top portion of the form, check the appropriate box and insert the quantity that is being transferred to the contractor.

17. The contractor must confirm the quantity of blanks being transferred and accept and sign the bottom of the form. Both the contractor and the cemetery should retain a copy of the transfer for their records.

17. The contractor is responsible for setting up the government-owned blanks for inspection by cemetery personnel. If any rejects are identified due to chipping, inappropriate coloration, etc., the cemetery is responsible for the storage and eventual disposal of the rejected blanks. The quantity of rejects should be noted on the transfer form along with date and name of cemetery personnel performing the inspection. The cemetery is responsible for notifying MPS of the rejects and supplying photos.

17. The contractor takes possession and is responsible for the care and protection of blanks following the cemetery staff’s inspection of the blanks. The contractor shall be responsible for the cost of damage to blanks or inscribed monuments while in their custody. Reimbursement will be made monthly through an electronic payment from the contractor to the address below:

17. The contractor processes inscription orders and displays the completed inscribed monuments for inspection by cemetery personnel following the contractor’s own required quality control actions. Pre-release review by the cemetery does not relieve the contractor of responsibility for performing an effective review of quality prior to turning inscribed monuments over to the cemetery. This should occur in a pre-determined location within the contractor’s inscription area.

17. The contractor will be responsible for completing Appendix C – Completion of Inscription Service(s) form. The contractor will complete the top portion of the form, checking the appropriate box and inserting the quantity of monuments that are ready for final inspection by cemetery personnel. Shipment numbers will be inserted for each monument completed. The contractor will inform the cemetery that monuments are ready for final inspection. This should be at a pre-determined, mutually agreeable time as established between cemetery and contractor personnel.

17. Cemetery personnel are responsible for a final inspection and acceptance of the completed monuments utilizing the Monument Order Acknowledgement Report (MOAR). Any rejects will be noted on the form (Appendix C) and the cemetery inspector will sign and date for the cemetery. Both parties should retain a copy for their records.

17. The cemetery will be responsible for scanning and emailing a copy of the Appendix C form, to the MPS COR, which will be used when certifying invoices for payment by the contractor.

17. The cemetery will be responsible for the removal of inspected and accepted monuments out of the inscription area. The cemetery will also be responsible for updating BOSS with the receipt date, which should match the date on the Appendix C form.

17. Rejects

12. The cemetery is responsible for the destruction and disposal of blanks that are rejected prior to being turned over to the contractor.

12. The contractor shall dispose of all rejected work within 60 calendar days of rejection. Disposal means destroyed so no part of the inscription is legible, removal from cemetery property, and discarded so no part of the monument can be used for any other private or public purpose.

17. Reorder of Rejected Inscribed Monuments

13. The cemetery will be required to reorder any rejected monuments through BOSS. The shipment order number (XXX-XXX) that was rejected will be entered into the “Remarks” section of the reorder with “Rejected”

13. The original order that was rejected will be received in BOSS and then rejected selecting a code for the reject.

1. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, primary MPS Contracting Officers Representative (COR), Cemetery’s alternate Contracting Officers Representative (ACOR) and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

18. Primary Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

18. Alternative Contracting Officer Representative (ACOR): The (ACOR) will be located at the cemetery level, selected by the cemetery director and identified by a separate letter. The ACOR monitors all aspects of the inscription process to include: inspection, acceptance and transfer of blanks (Appendix B); monitoring of the inscription area and contractor personnel; inspection of finished inscriptions to include quality, depth, blow-outs, lithichrome application (if required); comparison of inscribed monuments with the BOSS MOAR report; reporting to the CO and COR any deviations or issues pertaining to contract performance; maintain written and oral communications with the contractor maintaining files until contract expiration; partner with COR to complete CPAR requirements on a timely basis. The ACOR is not authorized to change any of the terms and conditions of the contract.

1. Procedures (Administrative and other)

19. Government Responsibilities

0. MPS shall email formatted orders on weekdays, when available, to a contractor’s self-designated email address.

0. Within 2 workdays, MPS shall clarify formatting questions regarding ordered items or advise the contractor as to whether extra time is needed to provide a reply. The contractor shall submit questions to MPSProgSupport@va.gov in order for MPS to provide guidance regarding questionable circumstances.

0. Questions or issues regarding processing of an order, which cannot be resolved through submission to MPSProgSupport@va.gov, shall be routed by MPS to the contracting officer for resolution.

19. Government Headstone and Marker Drawings: The Contractor shall ensure that copies of all relevant Government-provided drawings for production of headstones/markers under each contract are maintained on file and are available to the designated COR, upon request, during on-site Quality Assurance inspections.

19. Point of Contact at MPS, Program Support Unit:

E-mail MPSProgSupport@va.gov

[END OF STATEMENT OF WORK/SPECIFICATION]

Addendum 1

SAMPLE REVIEW - NICHE INSCRIPTION (Marble/Marble)

Date:

Prepared by:

Contractor:

Cemetery:

Solicitation #

Date Received:

Quarry:
n/a

Shipper:

Test Results:
n/a

Tracking #:

Criteria
Specification
Sample
Pass/Fail
Comments
Lithichrome
none
none
Pass
L-1 letter height
1-1/8"
L-1 letter depth
5/32" - 7/32"
L-4 letter height
3/4"
L-4 letter depth
4/32" - 6/32"
Emblem height
2"
Emblem depth
5/32" - 7/32"
Intra-Line Spacing (Rank→Brch of Svc)
1-1/2"
Intra-Line Spacing (DOB→DOD)
2"
Inter-Line Spacing
7/8", 29/32", 11/32", 11/32", 11/32", 11/32", 11/32", 11/32, 11/32"
Ref: Drawing No.:
A-NCIS-1 A-LFN&OC-1 A-LFN&OC-2 A-LFN&OC-3 A-EM 1-5

Recommendation:

Addendum 2

SAMPLE REVIEW - UPRIGHT MARBLE HEADSTONE INSCRIPTION (U1)

Date:

Prepared by:

Contractor:

Cemetery:

Solicitation

Date Rec'd:

Quarry:

Shipper:

Test Results:

Tracking #:

Criteria
Specification
Sample
Pass/Fail
Comments
Sample Size
24" x 13" x 3/4"
Lithichrome
none
L-1 letter height
1-1/8"
L-1 letter depth
6/32" - 8/32"
L-4 letter height
3/4"
L-4 letter depth
4/32" - 6/32"
Emblem height
3"
Emblem depth
6/32" - 8/32"
Interline Spacing
1-5/8", 2", 5/8" (2), 1/2" (8)
Ref: Drawing No.:
A-LFN&OC-1 thru 3
A-U1-1 and 2
A-EM-1 thru 5

Recommendation:

Addendum 3

APPENDIX B - TRANSFER OF BLANK GOVERNMENT-FURNISHED HEADSTONES, MARKERS, OR NICHE COVERS

I certify that the blank headstones, markers, or niche covers specified below were transferred to the VA contractor listed at the bottom of the form.

Printed Name of Cemetery Personnel: ________________________________ Signature:_________________________________________Date:___________

Check the appropriate box and insert the quantity for the type of headstone, marker or niche cover being transferred to the on-site contractor.

(I1) Blank Marble Niche Cover Quantity: ______ (U1) Blank Marble Upright Headstone Quantity: ______ List any rejects below, include type and quantity:

I certify that the headstones, markers, or niche covers specified above were received by me and the quantity of items has been verified.

Printed Name of VA Contractor:__________________________________ Signature:_________________________________________Date

Addendum 4

APPENDIX C – COMPLETION OF INSCRIPTION SERVICE(S)

I certify that the inscriptions have been completed per contract specifications on the government-furnished headstones, markers, or niche covers identified below.

Printed Name of VA Contractor: _______________________________________________

Signature:_________________________________________Date:___________

Check the appropriate box and enter the quantity of the type of headstone, marker or niche cover that has been completed and ready for inspection.

(I1) Blank Marble Niche Cover Quantity: ______

(U1) Blank Marble Upright Headstone Quantity: ______

(R2) Reverse Inscription Quantity: ______

Shipment Number (s) (required) rejects are to be marked:

I certify that the headstones, markers, or niche covers identified above were received by me and the quantity of items has been verified.

Printed Name of Cemetery:_________________________________________________

Signature:_________________________________________Date:___________