36C78618Q0409-002.docx

DOCX document 147 KB Posted

Attached to
2 tiered VOSB/SB ABRAHAM LINCOLN NAT CEM- HVAC Services (Preventative Maint)
Solicitation number
36C78618Q0409
Issued by

About this file

36C78618Q0409 36C78618Q0409.docx

View the file

Other files

File Type Posted
36C78618Q0409-0001000.docx DOCX document
36C78618Q0409-003.pdf PDF
36C78618Q0409-001.docx DOCX document
36C78618Q0409-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78618Q0409

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE

SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB

DESTINA

TION

UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS

(15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

9158-000014 36C78618Q0409 07-02-2018 Katherine Iacovelli 540-658-7231 07-16-2018 noon EST National Cemetery Administration 75 Barrett Heights Rd, Ste 309 Stafford, VA 22556 X X 238220 $15 Million X N/A X Department of Veterans Affairs National Cemetery Administration Abraham Lincoln National Cemetery 20953 West Hoff Road Elwood IL 60421 Same as Box 9

43C1 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

1-877-752-0900 See CONTINUATION Page HVAC Services- Preventative Maintenance for Abraham Lincoln National Cemetery Base + 4 Option Years if exercised

DUNS # _______________________________________

TAX ID # ______________________________________

Email: _________________________________________ Please call cemetery for site visit at (815) 423-9958 $0.00 See CONTINUATION Page X

XXX

X Katherine Iacovelli Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 SCHEDULE OF UNIT PRICES4
B.3 STATEMENT OF WORK6
SECTION C - CONTRACT CLAUSES13
C.1 DIGNITY CLAUSE13
C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017)13
C.3 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)18
C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)18
C.5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)18
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS24
ATTACHMENT 1 CONTRACT DISCREPANCY REPORT25
ATTACHMENT 2 WAGE DETERMINATION26
ATTACHMENT 3 BUSINESS MANAGEMENT QUESTIONNAIRE35
SECTION E - SOLICITATION PROVISIONS36
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JAN 2017)36
E.2 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)40
E.3 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)40
E.4 METHOD OF AWARD – CASCADE PROCEDURES42
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2017)42

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C786 Katherine Iacovelli National Cemetery Administration 75 Barrett Heights Rd, Ste 309 Stafford, VA 22556

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] After work is performed and accepted

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

http://www.tungsten-network.com/customer-campaigns/veterans-affairs/

5. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 SCHEDULE OF UNIT PRICES

CLIN Listing for HVAC Service

FY 2018-2022

Abraham Lincoln National Cemetery

Base Period: Date of Award through September 30, 2018

CLIN
Description
QTY
Unit
Cost/

Unit Year Total

0001
Preventative Maintenance Service and Repairs on HVAC System
2
EA
$_____
$_________
Total Base Year:
$___________

Option Year 1: October 1, 2018 through September 30, 2019

CLIN
Description
QTY
Unit
Cost/

Year Total

1001
Preventative Maintenance Service and Repairs on HVAC System
4
EA
$_____
$_________
Total Option Year 1:
$___________

Option Year 2: October 1, 2019 through September 30, 2020

CLIN
Description
QTY
Unit
Cost/

Year Total

2001
Preventative Maintenance Service and Repairs on HVAC System
4
EA
$_____
$_________
Total Option Year 2:
$___________

Option Year 3: October 1, 2020 through September 30, 2021

CLIN
Description
QTY
Unit
Cost/

Year Total

3001
Preventative Maintenance Service and Repairs on HVAC System
4
EA
$_____
$_________
Total Option Year 3:
$___________

Option Year 4: October 1, 2021 through September 30, 2022

CLIN
Description
QTY
Unit
Cost/

Year Total

4001
Preventative Maintenance Service and Repairs on HVAC System
4
EA
$_____
$_________
Total Option Year 4:
$___________
Sub Total-Base Period:
$_________
Sub Total-Option Year One:
$_________
Sub Total-Option Year Two:
$_________
Sub Total-Option Year Three:
$_________
Sub Total-Option Year Four:
$_________
Contract Total:
$________________

B.3 STATEMENT OF WORK

Abraham Lincoln National Cemetery 20953 West Hoff Rd Elwood, Illinois, 60421 Telephone (815) 423-9958 Fax (815) 423-5824

Heating/Ventilation/Air Conditioning Service (HVAC)

The vendor shall furnish all labor, supervision, professional expertise, technical engineering verification, equipment, and tools to provide semi-annual inspections to include a (DMS) technician and perform scheduled quarterly preventative and maintenance servicing repairs to include consumable items to Trane and all other related brands of heating and cooling equipment.

A- Description/Specifications/Equipment Listing and Locations B- Maintenance Task for Equipment

All equipment, supplies and activities shall be maintained, operated and performed in accordance with all applicable Federal, State, County, Village, and Township laws, ordinances and regulations including, but not limited to OSHA standards. Any damage caused by the Contractor shall be repaired or replaced at Contractor's expense, as directed by the COR.

All servicing maintenance shall be completed during normal working business hours of 8:00am to 4:30pm. The Contractor shall set up and provide to the cemetery a preventative/maintenance program, and schedules for services provided. All services, or repairs not covered under the service agreement plan will get prior approval from the COR before proceeding with repairs or services.

(a) This service contract at Abraham Lincoln National Cemetery, Elwood, IL, hereafter referred to as “Cemetery,” requires a contractor with past professional experience in HVAC maintenance.

(b) National cemeteries are a final resting place for our nation's heroes and as such, the standards for management, maintenance and appearance of these cemeteries have been established by the National Cemetery Administration to reflect this nation's concern and respect for those interred there. The contractor is to plan, coordinate, organize, manage, and perform the specified work to achieve and maintain HVAC at the quality required for a national shrine.

A. DESCRIPTION/SPECIFICATIONS/EQUIPMENT LISTING AND LOCATIONS

1. Bldg 1101 – Public Information Center:

Furnace F-1, Condensing Unit CU-1, Toilet Exhaust Fan TE-1

2. Bldg 1301 – Administration Building:

Central Fan AHU-2, Return Fan EF-2, Condensing Unit CU-2, Exhaust Fan – E-2, Hot Water Boiler B-1, Hot Water Pumps PM-1, PM-2, PM-3, Toilet Exhaust Fans TE-2 & TE-3, DMS Equipment (Digital Management System), Hot Water Cabinet Unit Heaters-CUH-1,2,3 & 4.

3. Bldg 1301 – Garage/Maintenance Building/Wash Bay:

Furnaces F-3, F-4, Exhaust Fans E-3, E-4, E-5, E-6, E-8, Unit Heaters UH-126 A-B&C, UH-7, UH-8 Elec.

4. Bldg 3002 – Out Building Sheltered Exhaust Fan E-7

5. Bldg 3W01 – Pump House/Chlorination:

Exhaust Fan E-13, E-14, Unit Heater UH-13, UH-14

6. Bldg 3001 – Carpenter Shop:

Exhaust Fan E-9, E-10, E-11 & E-12, Unit Heaters UH-9, UH-10, UH-12

7. Bldg 3020 – Honor Guard Building:

Electric Heater (Ceiling Mount), Air Conditioning (split) System, Toilet Exhaust Fans TE-4, Cabinet Unit Heaters – CUH-7 & CUH-8, Air Conditioning Wall Mount – AC-1

8. Miscellaneous Equipment:

Exhaust Fans - E-5, 6, 7, 8, 9, 10, 11, 12, 13, 14, & 15 (11 - Total) Unit Heaters – UH-7, 8, 9, 10, 12, 13, 14, 126 A-B&C (10 – Total) Cabinet Unit Heaters – CUH – 1, 2, 3, 4, 7, 8 (6 – Total) Air Conditioning Wall Mount – AC – 1 (1 – Total)

9. Condensing Coil Cleaning:

Provide 8 Hours of condenser coil cleaning on scheduled day in summer season at Public Information Center, Honor Guard Building and Administration/Maintenance Complex.

B. MAINTENANCE TASKS FOR EQUIPMENT

Hot Water Pumps

1. Lubricate bearings per manufacturer’s recommendations.

2. Lubricate Motor bearings per manufacturer’s recommendations.

3. Check motor mounts and vibration pads.

4. Visually check pump alignment and coupling.

5. Check motor operating conditions.

6. Inspect electrical connections and contractors.

7. Inspect mechanical seals.

8. Inspect pumps packing.

Hot Water Boilers

1. Inspect fireside of boiler.

2. Visually inspect boiler pressure vessel for possible leaks.

3. Check hand valves and automatic feed equipment.

4. Inspect and clean combustion control equipment.

5. Check burner sequence of operation and combustion air equipment.

6. Check fuel piping for leaks and proper support.

7. Check auxiliary equipment operation.

8. Start burner and check operating controls.

9. Test safety controls and pressure relief valve.

Central Fan System

1. Check fan assembly

2. Lubricate fan bearings per manufacturer’s recommendations.

3. Lubricate motor bearings per manufacturer’s recommendations.

4. Check motor mounts and vibration pads.

5. Check motor operating conditions.

6. Inspect electrical connections and contactors.

7. Change filters.

8. Check unit sequence of operation.

9. Check unit safeties and controls.

Exhaust Fans/Unit Heaters

1. Lubricate fan bearings per manufacturer’s recommendations.

2. Lubricate motor bearings per manufacturer’s recommendations.

3. Check belt and sheaves if applicable.

4. Check unit heater coil heater element.

5. Check associated dampers, linkages, and actuators.

6. Check operation.

Condensing Units

1. Visually inspect for leaks.

2. Lubricate fan and motor bearings as required.

3. Inspect electrical connections, contactors, relays, and operating/safety controls.

4. Check motor operating conditions.

5. Check fan blades.

6. Check vibration eliminators.

7. Check compressor operating temperatures and pressures.

8. Check and test all operating and safety controls.

9. Check operating conditions.

C. GENERAL INFO:

a. Job Foreman: A job foreman shall be provided whenever work is being performed to ensure employees are adequately supervised and proper conduct is maintained.

Period of Performance: The period of performance of the base contract is from the date of award through September 30, 2018 plus (4), one year options, if exercised.

Work Hours: All work shall be performed between the normal business hours (8:00 a.m. to 4:30 p.m.), Monday through Friday.

Site Visit: Offerors are highly encouraged to make a site visit. Such visits must be pre-scheduled and arranged by contacting the Abraham Lincoln National Cemetery office.

b. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work, appearance, and procedures performed by the contractor at this cemetery shall reflect this nation’s concern for those interred there. Due to the sensitive mission of the cemetery, contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.

c. The Contractor is responsible to ensure that all work shall be done in a manner that safeguards all NCA visitors, employees, and public. The Contractor shall provide an English-speaking crew leader ensuring clear communication between the cemetery COR and contractors leadership, ensuring contractors employees are adequately supervised and proper conduct is maintained.

d. Be required to be fully clothed at all times, to include upper garment with company name and logo to cover body from the waist to the neck and long pants or slacks.

e. The Contractor/personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at any time on Government property.

D. CONSEQUENCES OF CONTRACTOR’S FAILURE TO PERFORM REQUIRED SERVICES:

a. In the case of unperformed work, the Government:

i. May, at its option, afford the contractor an opportunity to perform the unperformed work, at no additional cost to the Government. This performance must take place within a reasonable period subject to the discretion of the COR, but in no event longer than the next workday.

ii. May, at its option, perform the services by Government personnel or other means.

b. In the case of unsatisfactory work that was not resolved, the Government:

i. Will deduct from the contractor’s invoice all amounts associated with such unsatisfactory work at the prices contained in the Schedule or provided by other provisions of the contract; unless the contractor is afforded an opportunity to re-perform the work as outlined in the next paragraph, and satisfactorily completes the work;

ii. May, at its option, afford the contractor the opportunity to re-perform the unsatisfactory work, at no additional cost to the Government, within a reasonable period, subject to the discretion of the COR, but in no event longer than the next workday;

iii. May, at its option, perform the services by Government personnel or other means.

E. CONTRACT DISCREPANCY REPORT (CDR)

a. For serious contract performance deficiencies, or when less formal communications fail to resolve minor performance deficiencies, the COR will issue a Contract Discrepancy Report (CDR) to the Contractor. The criticality of the offense(s) will govern whether to issue the CDR immediately or at the end of the monthly invoicing period.

i. The CDR will require the Contractor to respond in writing why the performance was unacceptable, what corrective actions have been/will be taken to fix the discrepancy, and how avoidance of a recurring problem will be prevented in the future.

ii. If the Contractor does not achieve satisfactory performance by correcting the discrepancy identified in the CDR by the end of the next period or agreed suspense date, the Contracting Officer may consider further actions, to include a determination on whether continued performance by the contractor is feasible.

iii. The contractor shall be held to the full performance of the contract. The COR will not approve the payment of invoices for items which were not completed in compliance with the specifications outlined in this Statement of Work.

iv. When a CDR is issued for a service, the Contracting Officer and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.

v. The COR will consult the Contracting Officer prior to submission of CDRs and include the Contracting Officer on all correspondence pertaining to the CDR until the discrepancy is resolved

vi. If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.

vii. The CO will be the final arbitrator on all contract issues. Any disputes involving payment must be resolved by the CO.

F. STANDARDS OF EMPLOYEE CONDUCT

a. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here, while performing work in the National Cemetery. These standards and regulations are enforceable under Title 38, U.S.C., Part I, Chapter 9, Section 5901.

b. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/safety clothing and shoes shall meet or exceed OSHA and state requirements.

c. Behavior and language must be appropriate, reverent, and respectful at all times.

d. Eating and drinking (except water) is prohibited in the work areas and within sight of a committal shelter during a service.

e. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery premises is strictly prohibited.

f. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments. No tools, equipment or other items shall be placed or leaned on headstones or monuments.

G. OPERATIONS DURING CEMETERY FUNCTIONS

Contractor personnel shall not operate motorized equipment or conduct other commercial activities within a designated area during interment services. The COR will identify the designated area. The COR or his/her representative will furnish the Contractor with a schedule of all interments and/or ceremonies no later than the close of business of the day prior to the scheduled interment, and a minimum of three (3) days before any ceremonial events.

H. CONTRACTOR’S RESPONSIBILITIES AND INSURANCE REQUIREMENTS

The Contractor shall obtain all necessary licenses and/or permits required to perform this work. The Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. The Contractor shall be responsible for any injury to himself, his employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his or her employees’ fault or negligence. Further, it is agreed that any negligence of the Government, its officers, agents, servants, and employees, will not be the responsibility of the Contractor hereunder with the regard to any claims, loss, damage, injury, and liability resulting there-from. The Contractor shall maintain workmen’s compensation, personal liability, automobile liability, and property damage insurance, as prescribed by the laws of the state of Kentucky, and in accordance with FAR 5.2282-5(c). Evidence of coverage is required before commencing work under this contract (copy of Certificate of Insurance), and it may not be changed or cancelled without thirty calendar days prior written notice to the Contracting Officer.

I. DAMAGE TO GOVERNMENT PROPERTY

The Contractor shall be responsible for repair or replacement of any contractor damaged cemetery structure, to include: turf, curb, road pavement, headstones or markers, valve boxes, grid monument control markers, trees, plant beds, etc., which are chipped, marred, damaged and/or ruined at the fault of the Contractor and shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the appointed Contracting Officer’s Representative (COR) prior to repair/replacement/installation.

a. The Contractor shall be responsible for cleaning cemetery structures, headstones, monuments, and roadways that are soiled or stained as a result of Contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures, headstones, and monuments at the end of each workday. Roadways shall be cleaned with a street sweeper each day, as needed, to keep the existing roads free from dirt and mud resulting from Contractor operations. No hazardous chemicals shall be used at any time on Government property. The Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning.

b. At the end of each day the Contractor shall remove all debris from the cemetery site resulting from the work. The Contractor shall ensure at all times that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the site. The Government will not provide receptacle(s) for disposal of debris related to this contract. The Contractor will be permitted to place his trash receptacle dumpsters in the COR approved “Contractor Staging Area”.

c. Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be provided by the Contractor at work site to eliminate hazards and for the protection, safety, and warning of all public visitors, pedestrians, cemetery employees, and vehicular traffic within the area.

d. The Government may undertake or award other contracts for additional work at or near the site of work for this contract. The Contractor shall fully cooperate with any other contractors and with Government employees and shall carefully adapt scheduling and performance of work, and needing any direction, it will be provided by the COR(s). The Contractor shall be responsible for reporting to the COR(s) any problems or questions that may arise with any other personnel on site during the period of performance of this contract. The Contractor shall not take it upon him or herself to resolve any problems or issues with other on-site contractors or employees, but rather shall leave it to the COR(s) to resolve the issue.

e. The Contractor (including his or her employees, subcontractors, consultants or the like) shall not operate trucks, tractors, and other heavy equipment on any turf area except as provided in this contract to perform work or as authorized by the COR. The Contractor shall be responsible for repairing turf damage caused by the Contractor ‘s equipment and staff at no additional cost to the Government.

J. SAFETY

Matters related to safety, and any actions of the Contractor, shall meet all safety requirements of the COR, Safety Officer, Department of Veterans Affairs, OSHA, and the State. It is incumbent upon the Contractor to be familiar with these requirements. "Safety" shall also include the Contractor having a safety representative who maintains regular and routine contact with the Safety Officer at Camp Nelson National Cemetery.

K. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS

a. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and remove and properly dispose of from the site as defined herein.

b. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall immediately notify the COR of any such occurrence and repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

L. RESTORATION

a. Upon completion of contract, deliver work complete and undamaged. Existing cemetery features (lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, will be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. All restoration work shall be accomplished without undue delay.

b. The Contractor shall be responsible for restoration and the Contractor shall bear all costs associated with restoration. Any such restoration to service and repair as a result of damage caused by Contractor’s workmen/subcontractors to existing cemetery infrastructure shall be brought to the immediate attention of the appointed Contracting Officer’s Representative (COR) prior to restoration.

M. DISPOSAL OF WASTE

The Contractor shall not dispose of any waste materials at any location on the cemetery premises. All waste materials shall be removed from cemetery property and disposed of in full accordance with local and state requirements.

36C78618Q0409

END OF STATEMENT OF WORK

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

C.1 DIGNITY CLAUSE

Every action by contractor personnel at a National Cemetery must be performed with the special care, reverence, dignity, and respect that acknowledge the cemetery as the final resting place that commemorates the service and sacrifice those service members, Veterans, and their families made for our Nation. Critically important is the awareness, required of the contractor employees, of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (JAN 2017)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause) ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS

C.3 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Clause)

FAR Number
Title
Date
52.217-8
OPTION TO EXTEND SERVICES 5 days
NOV 1999
52.232-18
AVAILABILITY OF FUNDS
APR 1984
52.232-40
PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS
DEC 2013
52.237-2
PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION
APR 1984
52.242-15
STOP-WORK ORDER
AUG 1989
852.203-70
COMMERCIAL ADVERTISING
MAY 2018
852.232-72
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
NOV 2012
852.237-70
CONTRACTOR RESPONSIBILITIES
APR 1984

(End of Addendum to 52.212-4)

C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 1 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 5 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

(End of Clause) C.5 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2018)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(3) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(4) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509).

[] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) (Pub. L. 109–282) (31 U.S.C. 6101 note).

[] (5) [Reserved] [] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).

[] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

[] (10) [Reserved] [] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

[] (ii) Alternate I (NOV 2011) of 52.219-3.

[] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[] (ii) Alternate I (JAN 2011) of 52.219-4.

[] (13) [Reserved] [X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

[] (ii) Alternate I (NOV 2011).

[] (iii) Alternate II (NOV 2011).

[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

[] (ii) Alternate I (Oct 1995) of 52.219-7.

[] (iii) Alternate II (Mar 2004) of 52.219-7.

[] (16) 52.219-8, Utilization of Small Business Concerns (NOV 2016) (15 U.S.C. 637(d)(2) and (3)).

[] (17)(i) 52.219-9, Small Business Subcontracting Plan (JAN 2017) (15 U.S.C. 637(d)(4)).

[] (ii) Alternate I (NOV 2016) of 52.219-9.

[] (iii) Alternate II (NOV 2016) of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.