36C78618Q0118-004.pdf
PDF 16 KB Posted
- Solicitation number
- 36C78618Q0118
About this file
36C78618Q0118 Earth Moving Phase II 2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0153-000.docx | DOCX document | |
| 36C78618Q0118-00003000.docx | DOCX document | |
| 36C78618Q0118-00003001.pdf | ||
| 36C78618Q0118-00001000.docx | DOCX document | |
| 36C78618Q0118-00001001.pdf | ||
| 36C78618Q0118-006.pdf | ||
| 36C78618Q0118-005.pdf | ||
| 36C78618Q0118-001.docx | DOCX document | |
| 36C78618Q0118-003.pdf | ||
| 36C78618Q0118-007.pdf | ||
| 36C78618Q0118-002.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dallas-Fort Worth National Cemetery Reseal PCC Pavement Joints and Concrete Repairs
31 20 11 - 1
SECTION 31 20 11
EARTH MOVING (SHORT FORM)
PART 1 - GENERAL
1.1:DESCRIPTION:
This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill, and backfill.
1.2 DEFINITIONS:
A. Unsuitable Materials:
1. Fills: Topsoil, frozen materials; construction materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable.
2. Existing Subgrade (except footings): Same materials as above paragraph, that are not capable of direct support of slabs, pavement, and similar items, with the possible exception of improvement by compaction, proofrolling, or similar methods of improvement.
3. Existing Subgrade (footings only): Same as Paragraph 1, but no fill or backfill.
B. Earthwork: Earthwork operations required within the new construction area. It also includes earthwork required for auxiliary structures and buildings and sewer and other trenchwork throughout the job site.
C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in AASHTO
T99 Method A.
D. The term fill means fill or backfill as appropriate.
1.3 CLASSIFICATION OF EXCAVATION:
A. Unclassified Excavation: Removal and disposal of pavements and other man-made obstructions visible on the surface; utilities, and other items including underground structures indicated to be demolished and removed;
together with any type of materials regardless of character of material and obstructions encountered.
B. Classified Excavation: Removal and disposal of all material not defined as rock.
C. Rock Excavation:
1. Solid ledge rock (igneous, metamorphic, and sedimentary rock).
2. Bedded or conglomerate deposits so cemented as to present characteristics of solid rock which cannot be excavated without blasting; or the use of a modern power excavator (shovel, backhoe, or
31 20 11 - 2 similar power excavators) of no less than 0.75 m3 (1 cubic yard) capacity, properly used, having adequate power and in good running condition.
3. Boulders or other detached stones each having a volume of 0.4 m3 (1/2 cubic yard) or more.
1.4 APPLICABLE PUBLICATIONS:
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. American Association of State Highway and Transportation Officials
(AASHTO):
T99-01 (R2004)..........Moisture-Density Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 inch) Drop
T180-01 (2004)..........Moisture-Density Relations of Soils Using a
4.54-kg [10 lb] Rammer and a 457 mm (18 inch)
Drop
C. American Society for Testing and Materials (ASTM):
D698-07.................Laboratory Compaction Characteristics of Soil
Using Standard Effort
D1557-02................Laboratory Compaction Characteristics of Soil
Using Modified Effort
D. Standard Specifications of Texas State Department of Transportation, latest revision.
PART 2 - PRODUCTS
2.1 MATERIALS:
A. Fills: Materials approved from on site and off site sources having a minimum dry density of 1760 kg/m3 (110 pcf), a maximum Plasticity Index of 6, and a maximum Liquid Limit of 30.
B. Granular Fill:
1. Under concrete slab, crushed stone or gravel graded from 25 mm (1 inch) to 4.75 mm (No. 4).
PART 3 - EXECUTION
3.1 SITE PREPARATION:
A. Clearing: Clearing within the limits of earthwork operations as described or designated by the COR. Work includes removal of paving, debris, trash and any other obstructions. Remove materials from the
Cemetery Property.
B. Disposal: All materials removed from the property shall be disposed of at a legally approved site, for the specific materials, and all removals
31 20 11 - 3 shall be in accordance with all applicable Federal, State and local regulations. No burning of materials is permitted onsite.
C. Finished elevation of subgrade shall be as follows:
1. Pavement Areas - bottom of the pavement or base course as applicable.
3.2 FILLING AND BACKFILLING:
A. General: Do not fill or backfill until all debris, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from the excavation. Proof-roll exposed subgrades with a fully loaded dump truck.
B. Compaction: Use approved equipment (hand or mechanical) well suited to the type of material being compacted. Do not operate mechanized vibratory compaction equipment within 3000 mm (10 feet) of new or existing building walls without the prior approval of the COTR. Moisten or aerate material as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Compact each layer until there is no evidence of further compaction to not less than 95 percent of the maximum density determined in accordance with the following test method AASHTO T99 Method A.
3.3 GRADING:
A. General: Uniformly grade the areas within the limits of this section, including adjacent transition areas. Smooth the finished surface within specified tolerance. Provide uniform levels or slopes between points where elevations are indicated, or between such points and existing finished grades. Provide a smooth transition between abrupt changes in slope.
B. Place crushed stone or gravel fill under concrete slabs on grade tamped and leveled. The thickness of the fill shall be 150 mm (6 inches), unless otherwise indicated.
C. Finish subgrade in a condition acceptable to the COR at least one day in advance of the paving operations. Maintain finished subgrade in a smooth and compacted condition until the succeeding operation has been accomplished. Scarify, compact, and grade the subgrade prior to further construction when approved compacted subgrade is disturbed by contractor's subsequent operations or adverse weather.
3.4 DISPOSAL OF UNSUITABLE AND EXCESS EXCAVATED MATERIAL:
A. Disposal: Transport surplus satisfactory soil to designated storage areas on Cemetery property. Stockpile or spread soil as directed by COR.
1. Remove waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Cemetery property.
B. Place excess excavated materials suitable for fill and/or backfill on site where directed.
31 20 11 - 4
C. Remove from site and dispose of any excess excavated materials after all fill and backfill operations have been completed.
3.5 CLEAN-UP:
Upon completion of earthwork operations, clean areas within contract limits, remove tools, and equipment. Provide site clear, clean, free of debris, and suitable for subsequent construction operations. Remove debris, rubbish, and excess material from the Cemetery Property.
- - - E N D - - -