36C78618Q0081 074113MetalRoof.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618Q0081-004.pdf | ||
| 36C78618Q0081-001.docx | DOCX document | |
| 36C78618Q0081-002.txt | TXT text file | |
| 36C78618Q0081-005.pdf | ||
| 36C78618Q0081-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
06-01-14
STANDING SEAM METAL ROOFING
07 41 13 - 1
SECTION 07 41 13
STANDING SEAM METAL ROOFING
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the installation of pre-formed standing seam roofing panels with snap together seam.
1.2 RELATED WORK
A. Counterflashing and flashing of roof projections: 07 60 00, FLASHING
AND SHEET METAL.
1.3 DESIGN REQUIREMENTS
A. Provide panels in continuous lengths up to manufacturer's standard longest lengths, with no joints or seams, except where indicated or specified. Ribs of adjoining sheets must be in continuous contact from eave to ridge.
B. There cannot be exposed or penetrating fasteners except where shown on approved shop drawings. Fasteners into steel must be stainless steel, zinc cast head, or cadmium plated steel screws inserted into predrilled holes.
C. Snap together type systems must have a capillary break and a positive side lap locking device. Include a continuous factory applied sealant within the seam.
D. Roof panel anchor clips must be concealed and designed to allow for longitudinal thermal movement of the panels, except where specific fixed points are indicated. Provide for lateral thermal movement in panel configuration or with clips designed for lateral and longitudinal movement.
E. Design metal roof panel assembly, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
1. Structural Performance: Provide metal roof panel assemblies capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated, based on testing according to ASTM E1592.
2. Wind-Uplift Resistance: Provide metal roof panel assemblies that comply with UL 580 for wind-uplift-resistance class; design and size components to withstand positive and negative wind loads, including increased loads at building corners as calculated according to local jurisdiction and ASCE 7.
07 41 13 - 2
3. Deflection: Provide panels capable of supporting design loads between unsupported spans with deflection of not greater than L/180 of the span.
F. Single Source: Roofing panels, clips, closures, and other accessories must be standard products of the same manufacturer; be the latest design by the manufacturer; and have been designed by the manufacturer to operate as a complete system for the intended use.
G. Energy Performance, Energy Star: Provide roofing finish system that is listed on DOE's ENERGY STAR "Roof Products Qualified Product List" or listed on Cool Roof Rating Council (CRRC) product list.
1.4 INSTALLATION REQUIREMENTS
A. Install in accordance with SMACNA Architectural Sheet Metal Manual except as otherwise shown or specified.
1.5 SUBMITTALS
A. Submit PRODUCT DATA, AND SAMPLES.
B. Installer Qualifications: Document installer is factory-trained, approved by the metal roofing system manufacturer to install the system, and has a minimum of three years’ experience as an approved applicator with that manufacturer. The applicator must have applied five installations of similar size and scope as this project within the previous 3 years.
1.6 WARRANTY
A. Roofing work subject to the terms of the Article “Warranty of
Construction”, FAR clause 52.246-21, except extend the warranty period to five years.
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.
B. American Architectural Manufacturer Association (AAMA):
AAMA 621-02 High Performance Organic Coatings on Coil
Coated Architectural Hot Dipped Galvanized
(HDG) & Zinc-Aluminum Coated Steel Substrates
C. American Society for Testing and Materials (ASTM):
A463/A463M-09 Steel Sheet, Cold-Rolled, Aluminum-Coated, by the Hot-Dip Process
C920-11 Elastomeric Joint Sealants
07 41 13 - 3
E1514-98(2011) Structural Standing Seam Steel Roof Panel
Systems
E1592 Structural Performance of Sheet Metal Roof and
Siding Systems by Uniform Static Air Pressure
Difference
D. American Society of Civil Engineers (ASCE):
ASCE 7-10 Minimum Design Loads for Buildings and Other
Structures
E. Cool Roof Rating Council (CRRC):
CRRC-1-10 Product Rating Program, www.coolroofs.org
F. Sheet Metal and Air Conditioning Contractors National Association
(SMACNA): Architectural Sheet Metal Manual 2012
G. Underwriters Laboratory (UL):
UL 580, 2006 Edition Tests for Uplift Resistance of Roof Assemblies
H. U.S. Department of Energy (DoE):
Roof Products Qualified Product List, www.energystar.gov
PART 2 - PRODUCTS
2.1 METAL ROOF PANEL
A. Aluminum-Zinc Alloy Coated Sheet Steel conforming to ASTM A463 and coated on both sides with 0.5 ounce of aluminum per square foot (0.15
Kg/sm); minimum 0.6 mm (24 gage) base metal thickness.
B. Conform to ASTM E1514.
C. Vertical rib, snap joint, standing seam metal roof panels: Formed with vertical ribs at panel edges and intermediate stiffening ribs symmetrically spaced between ribs; designed for sequential installation by mechanically attaching panels to supports using concealed clips located under one side of panels and engaging opposite edge of adjacent panels and snapping panels together.
D. Panel Coverage: 406 mm (16 inches).
E. Seam Height: Minimum 44 mm (1-3/4 inch).
2.2 SEALANTS
A. Field-applied: ASTM C920.
B. Seam Cap Sealant: Factory applied hot melt, high viscosity, pressure sensitive adhesive with high heat resistance.
C. Type, Grade, and Class as recommended in writing by the manufacturer.
2.3 SEALANT TAPE
A. Pressure sensitive, 100 percent solids, Gray Polyisobutylene compound with release-paper backing.
07 41 13 - 4
B. 12 mm (1/2 inch) wide x 3 mm (1/8 inch) thick.
2.4 UNDERLAYMENT
A. Self-Adhering with reinforcing scrim, High-Temperature Sheet: Minimum
50 thick minimum, consisting of slip-resisting top surface laminated to
SBS-modified asphalt adhesive, with release-paper backing; cold applied.
2.5 FASTENERS
A. Self-drilling, or self-tapping zinc plated hex head carbon-steel screws with EPDM washer or stainless steel cap.
B. Concealed Standard Anchor Clips: Clips base must be minimum 1.2 mm (18 gauge) galvanized steel with 0.7 mm (22 gage) galvanized or stainless steel sliding top. Clips must be two (2) piece design; one-piece clips are not acceptable.
2.6 FINISHES
A. Factory finished complying with SMACNA’s recommendations for applying and designating finishes.
B. Exterior Finish:
1. 2-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat.
2. Coating system must provide nominal 0.025 mm (1.0 mil) dry film thickness, consisting of primer and color coat.
3. Concealed Finish: Apply pretreatment and manufacturer's standard white or light-colored polyester backer finish, consisting of prime coat and wash coat with a minimum total dry film thickness of 0.0125 mm (0.5 mil).
C. Color: As approved by COR.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal roof panel supports, and other conditions affecting performance of work.
1. Examine primary and secondary roof framing to verify that rafters, purlins, angles, channels, and other structural panel support members and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer.
B. Examine roughing-in for components and systems penetrating metal roof panels to verify actual locations of penetrations relative to seam locations of metal roof panels before metal roof panel installation.
07 41 13 - 5
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean substrates of substances harmful to insulation, including removing projections capable of interfering with insulation attachment.
B. Install fascia and trim.
3.3 METAL ROOF PANEL INSTALLATION, GENERAL
A. General: Provide metal roof panels of full length from eave to ridge, unless otherwise indicated or restricted by shipping limitations.
Anchor metal roof panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Field cutting of metal roof panels by torch is not permitted.
2. Install panels perpendicular to purlins.
3. Rigidly fasten eave end of metal roof panels and allow ridge end free movement due to thermal expansion and contraction; predrill panels.
4. Provide metal closures at peaks, rake walls and each side of ridge and hip caps.
5. Flash and seal metal roof panels with weather closures at eaves, rakes, and at perimeter of all openings. Fasten with self-tapping screws.
6. Locate and space fastenings in uniform vertical and horizontal alignment.
7. Install ridge and hip caps as metal roof panel work proceeds.
8. Locate panel splices over, but not attached to, structural supports.
Stagger panel splices and end laps to avoid a four-panel lap splice condition.
9. Lap metal flashing over metal roof panels to allow moisture to run over and off the material.
B. Fasteners:
1. Steel Roof Panels: Use stainless-steel fasteners for surfaces exposed to the exterior and galvanized steel fasteners for surfaces exposed to the interior.
C. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating, by applying rubberized-asphalt underlayment to each contact surface, or by other permanent separation as recommended by metal roof panel manufacturer.
07 41 13 - 6
D. Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and where required for weatherproof performance of metal roof panel assemblies. Provide types of gaskets, fillers, and sealants indicated or, if not indicated, types recommended by metal roof panel manufacturer.
1. Seal metal roof panel end laps with double beads of tape or sealant, full width of panel. Seal side joints where recommended by metal roof panel manufacturer.
3.4 FIELD-ASSEMBLED METAL ROOF PANEL INSTALLATION
A. Standing-Seam Metal Roof Panels: Fasten metal roof panels to supports with concealed clips at each standing-seam joint at location, spacing, and with fasteners recommended by manufacturer.
1. Install clips to supports with self-tapping fasteners.
2. Install pressure plates at locations indicated in manufacturer's written installation instructions.
3. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied sealant.
3.5 ACCESSORY INSTALLATION
A. General: Install accessories with positive anchorage to building and weathertight mounting and provide for thermal expansion. Coordinate installation with flashings and other components.
1. Install components required for a complete metal roof panel assembly including trim, copings, ridge closures, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.
2. Details of installation which are not indicated must be in accordance with the SMACNA, panel manufacturer's approved printed instructions and details, or the approved shop drawings. Allow for expansion and contraction of flashing.
B. Pipe Flashing: Form flashing around pipe penetration and metal roof panels. Fasten and seal to metal roof panels as recommended by manufacturer.
3.6 ERECTION TOLERANCES
A. Installation Tolerances: Shim and align metal roof panel units within installed tolerance of 6 mm in 6 m (1/4 inch in 20 feet) on slope and location lines as indicated and within 3 mm (1/8 inch) offset of adjoining faces and of alignment of matching profiles.
07 41 13 - 7
3.7 CLEANING AND PROTECTION
A. Remove temporary protective coverings and strippable films, if any, as metal roof panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal roof panel installation, clean finished surfaces as recommended by metal roof panel manufacturer. Maintain in a clean condition during construction.
B. Replace metal roof panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
- - - E N D - - -