36C78618B0091-00001000.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C78618B0091
About this file
36C78618B0091 00001 36C78618B0091 00001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618C0079-000.docx | DOCX document | |
| 36C78618B0091-002.pdf | ||
| 36C78618B0091-003.pdf | ||
| 36C78618B0091-006.pdf | ||
| 36C78618B0091-004.pdf | ||
| 36C78618B0091-001.docx | DOCX document | |
| 36C78618B0091-005.pdf | ||
| 36C78618B0091-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00001 02-01-2018
815-NRM18-18
43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford VA 22556
To all Offerors/Bidders
36C78618B0091 01-08-2018
X X X
1. The attached questions from prospective bidders and government responses are attached. See the continuation page.
2. No additional questions concerning this solicitation will be accepted.
All other terms, conditions and specifications remain unchanged.
David J. Dixon Contracting Officer
CONTINUATION PAGE
Questions and Government Responses
1. Will the Department of Veterans Affairs be purchasing the replacement receptacles directly? Or will they be using a general contractor to purchase them?
0. RESPONSE: The items in Specification Section 32 30 00 Site Furnishings shall be furnished by the Contractor as a part of this contract.
1. Do you have any product details for the trash & flower vase receptacles?
1. RESPONSE: These are provided in Specification Section 32 30 00 Site Furnishings and drawings.
1. When reviewing the drawings provided is it correct to assume there are several stand alone water locations? And several locations where there will be a new receptacle that will not have water?
2. RESPONSE: The drawings, specifically the Site Plan show orange and blue locations which answers this question.
1. Will space be provided to store the job materials on site? (ie trash receptacles and flower vase receptacles)
3. RESPONSE: Unfortunately space is at a premium and therefore this will not be permissible.
1. Is there electrical service that runs underground near the areas where digging will happen? Who is responsible for “mark out” of existing services? (electric / water)
4. RESPONSE: Contractor is responsible to locate water and electric underground so as to safely perform the work in this project. Coordinate with the cemetery personnel.
1. Do we have to use a specific brand receptacle? Specifications note a specific color but not a brand or model number.
5. RESPONSE: Products must meet the project specifications, and no brand or model number will be provided.
1. Do the bollards need to be finished (painted) similar to the receptacles?
6. RESPONSE: No. Painting of the bollards is not required.
1. What is the purpose of the lock and chains? There is mention of providing locks and chains in the narrative, but they are not reflected on the drawings.
7. RESPONSE: Chain and Locks are not required as part of this project.
End of Document
File details come from the government source that posted it.