Sources Sought Attachment 1 - Capabilities Questionnaire.docx
DOCX document 37 KB Posted
- Attached to
- Z2DZ--VA ESPC IDIQ
- Solicitation number
- 36C77627Q0067
About this file
This is a Capabilities Questionnaire form for a Department of Veterans Affairs Energy Savings Performance Contracts (ESPC) Indefinite Delivery Indefinite Quantity (IDIQ) pre-solicitation. Contractors responding to this market research notice must provide general company information including Unique Entity ID, CAGE code, SAM.gov registration status, NAICS code 236220 (Commercial and Institutional Building Construction) registration, and DOE FEMP Qualified ESCO List certification status. The questionnaire requests identification of geographic areas where firms can perform energy performance contracting work, including all 48 contiguous states, Alaska, Hawaii, U.S. territories, or specific states.
The form requires detailed responses regarding business type and socioeconomic designations (SDVOSB, VOSB, HUBZone, 8(a), WOSB, EDWOSB, small disadvantaged business, or other than small business), years of experience in energy and ESPC projects, and contractor arrangement structure (joint venture, prime contractor self-performing, or prime with subcontractors). A comprehensive capability checklist addresses 20 functional areas including permits and compliance, VA facility experience, energy cost savings identification, design and construction capabilities, maintenance services, quality control, safety planning, and specialized expertise in boiler improvements, chiller systems, HVAC, lighting, renewable energy, commissioning, and other energy systems. Narrative questions request detailed information on the largest single task order capacity, aggregate concurrent capacity, performance-period capacity, bonding capacity with surety details, industry certifications, potential SOW risks, financing capability at risk and projected over ten years, relevant ESPC project examples with implementation prices and financing terms, utility company coordination experience, assessment and audit experience, healthcare facility experience, third-party generation experience, DOE FEMP eProject Builder reporting experience, and willingness to participate in joint ventures or mentor-protégé arrangements with SDVOSB/VOSB firms. The small business size standard under NAICS 236220 is $45 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Attachment 2 - DRAFT ESPC IDIQ SOW.docx | DOCX document | |
| 36C77627Q0067.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
VA ESPC IDIQ
Capabilities Questionnaire Use this form to provide contractor’s general information. Please respond to all questions as completely as possible.
SECTION 1. GENERAL
A. Unique Entity ID (UEI):
B. CAGE Code:
C. SAM.gov Registration: ☐ Active ☐ Inactive D. Business Name:
E. Business Address:
F. NAICS:
a. Is your firm registered under the NAICS code 236220 – Commercial and Institutional Building Construction? ☐ Yes ☐ No
b. If not, what NAICS code do you propose for this requirement and why?
c. Indicate your firm’s size status (small / other than small) under NAICS 236220:
G. Is your firm currently on the DOE FEMP Qualified ESCO List? ☐ Yes ☐ No ☐ Application pending (date submitted: _________ ).
H. If you anticipate proposing as a joint venture, identify which joint venture partner(s) are listed on the DOE FEMP Qualified ESCO List.
I. Responsible Point of Contact Name:
Title:
Telephone:
Email:
J. Select the following States, U.S. Territories and Outlying Areas where your firm has the capability/interest to perform energy performance contracting work.
☐ All 48 Contiguous States ☐ Alaska ☐ Hawaii ☐ Only the following states: ____________________________________________ ☐ U.S. Territories and Outlying Areas ☐ Only the following U.S. Territories and Outlying Areas: ____________________
SECTION 2. TYPE OF BUSINESS: (check all that apply) ☐Service-Disabled Veteran-Owned small business (SDVOSB) ☐ SBA VetCert Certified SDVOSB (certification date: _____ expiration date: __________) ☐Veteran-Owned small business (VOSB) ☐ SBA VetCert Certified VOSB (certification date: _____ expiration date: __________) ☐HUBZone small business ☐8(a) Program participant ☐Women-owned small business (WOSB) ☐ SBA WOSB Certified (certification date: _____ expiration date: __________) ☐Economically disadvantaged WOSB (EDWOSB) ☐ SBA EDWOSB Certified (certification date: _____ expiration date: __________) ☐Small Disadvantaged business ☐Small business (no socioeconomic designation) ☐Other than small business 2.a. EXPERIENCE:
· Number of years/months in business executing Energy projects:
· ________years ______ months
· Number of years/months in business executing ESPC projects:
· ________years ______ months
2.b. CONTRACTOR ARRANGEMENT:
Our firm will most likely be proposing as a:
☐Joint Venture with (Insert business name, UEI, business size, and socioeconomic status).
A joint venture must comply with the SBA regulations applicable to its status: 13 CFR 128.402 for SDVOSB and VOSB joint ventures (see also VAAR 819.7003(c) and VAAR 852.219-73); 13 CFR 124.513 for 8(a) joint ventures; 13 CFR 126.616 for HUBZone joint ventures; 13 CFR 127.506 for WOSB/EDWOSB joint ventures; 13 CFR 125.8 for small business joint ventures generally; 13 CFR 125.9 for SBA Mentor-Protégé joint ventures; and 13 CFR 121.103(h) for size and affiliation treatment of joint ventures. For SDVOSB/VOSB joint ventures, the SDVOSB/VOSB partner must be certified by SBA (VetCert), and the joint venture must be designated as an SDVOSB/VOSB joint venture in SAM.gov at the time of offer. A certified SDVOSB/VOSB may not participate in more than one joint venture submitting an offer on this requirement. Identify the joint venture’s managing venturer, each partner’s business size and socioeconomic status, each partner’s UEI, and whether the arrangement is an approved SBA Mentor-Protégé joint venture.
☐Prime Contractor, self-performing 100% of the work ☐Prime contractor (small business) that will comply with the limitations on subcontracting applicable to the assigned NAICS code (FAR 52.219-14; VAAR 852.219-75), with the following subcontractors or similarly situated entities (Insert business name, UEI, size/status, and scope of work to be subcontracted) ☐Subcontractor or similarly situated entity to (Insert prime contractor’s business name, UEI, and size/status) for the following scope of work: ______________________ ☐Prime contractor (other than small business) with the following subcontractors (Insert business name, UEI, size/status, and scope of work to be subcontracted) ☐Other – explain_________________________
SECTION 3: CAPABILITY CHECKLIST
1. Does your company have the capability to identify and obtain all permits required by Federal, State, and local agencies and the VA facility, including the capability of complying with environmental laws and regulations? ☐Yes ☐ No
2. Does your company have experience working on VA medical centers or other VA facilities? ☐Yes ☐ No
3. Is your company capable and qualified to search for energy and ancillary cost savings potential at Federal facilities? ☐Yes ☐ No
4. Is your company capable and qualified to develop procedures, courses of action, steps, repairs, or changes in equipment which lower energy costs? ☐Yes ☐ No
5. Is your company capable and qualified to provide work plans/designs? ☐Yes ☐ No
6. Does your company have the capability to perform construction efforts to include site security (fencing, lighting) as required by an ESPC task order? ☐Yes ☐ No
7. Is your company capable and qualified to provide maintenance and repair services for any energy related equipment including computer software systems? ☐Yes ☐ No
8. Is your company capable and qualified to provide, at a minimum, yearly equipment inspections to ensure that the equipment is being operated properly and maintenance is being performed? ☐Yes ☐ No
9. Does your company have the capability to provide all personnel (to include dedicated project manager), tools, equipment, transportation, material, and supervision needed to safely and efficiently perform the energy cost saving projects? ☐Yes ☐ No
10. Does your company have the capability to implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation needed for its management of an ESPC IDIQ and task order(s)? ☐Yes ☐ No
11. Does your company have the capability to provide and maintain an effective quality control program? ☐Yes ☐ No
12. Does your company have the capability to provide, maintain, and execute an approved site safety and health plan? ☐Yes ☐ No
13. Does your company have the capability to provide any new metering, monitoring, measuring, or testing needed to verify savings to include equipment, software, labor, and installation? ☐Yes ☐ No
14. Does your company have the capability to coordinate all work from all trades to include subcontractors and suppliers relative to the awarded contract? ☐Yes ☐ No
15. Does your company have the capability to provide all required facilities to house its field operations? ☐Yes ☐ No
16. Indicate your company's demonstrated experience in each of the following:
a. Boiler Improvements ☐Yes ☐ No
b. Chiller Improvements ☐Yes ☐ No
c. Utility Monitoring and Controls Systems ☐Yes ☐ No
d. Heating, Ventilating, and Air Conditioning (not including Boilers, Chillers, and UMCS) ☐Yes ☐ No
e. Lighting Improvements ☐Yes ☐ No
f. Building Envelope Improvements ☐Yes ☐ No
g. Water and Steam Distribution Systems ☐Yes ☐ No
h. Electric Motors and Drives ☐Yes ☐ No
i. Distributed Generation ☐Yes ☐ No
j. Renewable Energy Systems ☐Yes ☐ No
k. Energy/Utility Distribution Systems ☐Yes ☐ No
l. Water and Sewer Conservation Systems ☐Yes ☐ No
m. Electrical/Peak Shaving/Load Shifting ☐Yes ☐ No
n. Commissioning/Retro-Commissioning ☐Yes ☐ No
o. Central steam/heating improvements ☐Yes ☐ No
p. Emergency and standby power (NFPA 99/110) ☐Yes ☐ No
q. Data Center Improvements ☐Yes ☐ No
r. Ancillary Construction Requirements ☐Yes ☐ No
s. Energy Storage Systems ☐Yes ☐ No
t. Microgrids / Energy Resilience Systems ☐Yes ☐ No
SECTION 4: NARRATIVE QUESTIONS
Please respond to all questions with as much information as possible without exceeding the page count limit in this notice.
1. Largest single task order. What is the largest single ESPC task order, measured by implementation price (the total design, construction, and commissioning cost of the ECMs, excluding financing and performance-period services), that your firm could execute as prime contractor? State the dollar amount and the basis for it (for example, surety single-project bonding limit, in-house project management and engineering staffing, or prior largest project completed).
2. Aggregate concurrent capacity. What is the total implementation price of all ESPC task orders your firm could have in the project development and implementation phases at the same time? State the dollar amount, the number of concurrent task orders it represents, the number of different VA facilities or geographic regions it could support simultaneously, and the basis for the figure (for example, surety aggregate bonding limit, staffing, or at-risk capital available for Preliminary Assessments and Investment Grade Audits).
3. Performance-period capacity. Separately from the above, what is the total number of ESPC task orders awarded (and their combined annual guaranteed savings) for which your firm currently provides, or could provide, performance-period measurement and verification, operations and maintenance, and repair and replacement services? Describe how those services are staffed (in-house, regional subcontractors, or both).
4. Bonding capacity. State your firm’s current single-project and aggregate bonding capacity in dollars and identify your surety and its A.M. Best rating. Respondents are encouraged, but not required, to attach a letter from their surety or surety broker confirming these limits. The letter will not count against the page limit, is for market research purposes only, and does not constitute a commitment by the surety or a responsibility determination by VA. Performance and payment bonds for any resulting task order are anticipated to be required on the implementation (construction) price of the task order in accordance with FAR 28.102.
5. Describe any applicable industry certifications, permits, or licenses your firm currently maintains. If there are known required permits and certifications that your business does not hold, please explain how this will be addressed in order to fulfill the requirement.
6. As currently written, does this SOW create any risk for firms to propose on this IDIQ or execute work off of this IDIQ? If “yes” please explain.
7. As currently written, is there anything in the SOW that would cause a firm that would normally be interested in this type of contract, to choose not to propose?
8. Financing Capability.
(a) State the maximum amount of ESPC project investment (implementation price) your firm can carry at risk at any one time across concurrent task orders, including project development (Preliminary Assessment and Investment Grade Audit, performed at the ESCO’s risk with no reimbursement unless a task order is awarded) and the implementation period through Government acceptance. State the number of concurrent task orders this represents.
(b) State the total ESPC project investment your firm projects it could develop and bring to task order award over the 10-year ordering period, by year, assuming typical task orders require 24 to 36 months from Notice of Opportunity to award and 12 to 24 months from award to Government acceptance.
(c) Describe your firm’s demonstrated access to third-party project financing for performance periods of up to 25 years. For task orders closed in the last five years, identify the financier, the financed amount, the financing term (years), the rate basis and spread, and whether the financing was placed through a competitive financier solicitation. Identify the longest financing term your firm has closed on a federal ESPC and the longest term your financiers have indicated they will support.
For all parts, assume that performance-period payments begin only after Government acceptance of the project, are funded solely from guaranteed energy, water, and related cost savings, and that VA will make no advance payments and no one-time appropriated payment at acceptance unless expressly stated in a task order Notice of Opportunity.
9. Provide at least three examples of Energy Savings Performance Contract (ESPC) projects for which you were the prime contractor, joint venture partner, or first tier subcontractor responsible for the development, financing, and/or management of the design, construction and/or post construction operation. Identify the scope of your contractual responsibilities, location, client, and size of the project in terms of implementation price, total financed amount, performance-period term in years, and additional performance-period services executed such as Operations Maintenance Repair and Replacement (OMRR) and Measurement and Verification (M&V). Do not exceed two pages per project.
10. Briefly describe your company’s experience working with Utility companies and coordinating rebates, other incentives, and any potential interconnect/transmission discussions/agreements that may be necessary as part of a proposed project.
11. Briefly describe your company’s experience in performing preliminary assessments, investment grade audits (IGA), and economic analysis, such as Life Cycle Cost, Risk, Return on Investment (ROI), etc., which may be required to determine/demonstrate the financial viability of a proposed project?
12. Briefly describe your company’s experience supporting a Federal agency’s Assessment and Authorization (A&A) process under the NIST Risk Management Framework (NIST SP 800-37) for networked building automation, energy management, metering, or other operational technology installed under an ESPC or similar contract. Include whether your company has prepared system security documentation and implemented NIST SP 800-53 controls that resulted in the agency issuing an Authority to Operate (ATO). If your company has no such experience, state “None.”
13. Describe your firm’s experience performing ESPC or comparable performance-contract work in hospitals or other 24/7 critical health care facilities, including work performed under infection control risk assessment (ICRA) and interim life safety measure (ILSM) constraints.
14. Describe your firm’s experience in structuring, financing, and operating Energy Sales Agreements (ESAs) or other third-party-owned on-site generation within a Federal ESPC.
15. Describe your firm’s experience developing and reporting ESPC projects in the DOE FEMP eProject Builder (ePB) system.
16. If your firm is not a certified SDVOSB or VOSB, would it participate in this requirement as a joint venture partner, SBA Mentor-Protégé mentor, or subcontractor to an SDVOSB/VOSB prime contractor? If your firm is a certified SDVOSB or VOSB, identify any such teaming arrangement you anticipate and the partner’s role.
(end of questionnaire)