This document is a pre-solicitation notice for a federal contract opportunity for Architect-Engineer (A-E) services to develop construction documents, including working drawings, specifications, and reports, as well as construction period services, for a project to construct a service building annex and ambulance ramp at the VA Pittsburgh Healthcare System.

The Department of Veterans Affairs (VA) is seeking sources for this 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract. The anticipated period of performance for the design is 335 calendar days after notice of award, with an anticipated award in late November 2024. The estimated construction value is between $10-20 million. The VA will evaluate submissions based on specialized experience, technical competence, professional qualifications, capacity, past performance, and knowledge of the locality. Firms must submit Standard Form 330 by September 20, 2024 and be SDVOSB certified. The contract will be awarded to the highest ranked firm following discussions.

View the file

Other files

File Type Posted
36C77624R0148 0002.docx DOCX document
Attachment 2 Technical Questions Tracking Spreadsheet Pittsburgh.docx DOCX document
36C77624R0148 0001.docx DOCX document
Attachment 01 - SOW AE Design.pdf PDF
36C77624R0148.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

MAIN BUILDING

BOILER PLANT

AIR CONDITIONING BUILDING

GENERATOR BUILDING

CONSOLIDATION

BUILDING

CONSOLIDATION BUILDING29

RESEARCH OFFICE BUILDING30

S.GEAR/TRANS./BREAK BUILDING31

PARKING GARAGEBED TOWERShared Access

X

PARKING GARAGE32

FISHER HOUSE33

CLINICAL ADDITION

AND

OUTPATIENT ADDITION

Li m it of

W or k

FOUNTAIN #1

FOUNTAIN #2

PL

A

N

TI

N G

B

ED

PLANTING

BED

PLANTING

BED

PLANTING

BED

PLANTING

BED

PLANTING

BED

x x x

Lim it of W ork

X X X X

7600 SF

SF

S F

SF

SF

SF

S F

10400 SF

1100 SF

740 SF

3100 SF

S F

3300 SF

S F

1490 SF

2240 SF

1840 SF

4600SF

1900 SF

X

X

FUTURE ANNEX BLDG

UNIVERSITY DRIVE DIVISION

BUILDING LEGEND

Revisions Date

Drawing Title Project Title Date

Project No.

Approved: Site Manager

Approved: Location

Building No. Scale Drawn DRAWING NO.

Dwg. of

Approved: Director, VA Pittsburgh Healthcare System

Approved: Vice President, Facilities Management

Approved: Manager, Projects Section

Approved: Chief Operating Officer

SITE BUILDING NUMBERS

VA PITTSBURGH HEALTHCARE SYSTEM

UNIVERSITY DRIVE DIVISION

PITTSBURGH, PA 15240

X 1

NTS DMN/AUniversity Drive Facility Office of Facilities

Management

& LOCATIONSPLAN

UPDATED BUILDING NUMBERS & NAMES 2021

2022-07-222022-07-22

5/9/20241

SOW ATTACHMENT 3A - PROPOSED ELEVATION AND SPACE

Building #6

New Construction

5/9/20242

Future Expansion

ED Parking

Mechanical Space

Multi-Specialty Clinics

FMS

5/9/20243

ED Parking

Mechanical Space

Multi-Specialty Clinics

FMS

5/9/20244

5/9/20245

BELOW GRADE

5/9/20246

5/9/20247

Bldg 6 ‘Annex‘ Ground Floor:

Dedicated Parking Ramp and access point for Emergency Department via Breckenridge in High- Visibility location with improved driving access for Veteran traffic as opposed to existing Ambulance entry drive

5/9/20248

5/9/20249

5/9/202410

Bldg 6 ‘Annex'

• Dedicated link to renovated / expanded Emergency Department

• Independent link connector and nearly

~10,000 sq ft floorplate for dedicated Oncology Clinics or related Out-Patient Care clinics

• Relocation of Oncology from 8W allows for expanded Medicine clinics for entirety of 8th Floor, IE both 8E & 8W

5/9/202411

Mechanical Space (Sim adjacent 2A) Mechanicals Serving new ‘Annex’ Floors B, G, 1 & 2 Relocated aging ‘SPS' AHU from 4A Rooftop to clear roof area for 5A-Phase II (Additional 8-9 Inpatient Beds, with PRIVATE Bed/Bath per Secretary’s Initiatives

5/9/202412

Department of Veterans Affairs

D\ate: NOV O 7 2018

Memorandum

From: Deputy Under Secretary for Health for Operations and Management (1 ON)

Subj: Sensitive Infrastructure Data Classification - For Official Use Only (FOUO)

To: Veterans Integrated Service Network Directors (10N1-23)

1. This memorandum describes Veterans Health Administration's direction to protect sensitive infrastructure information, including building drawings and related data, for VHA-controlled space. VHA-controlled space includes owned, leased, and delegated Federal facil ities. All information determined to be sensitive shall be marked and managed as FOUO in accordance with this memorandum. This applies to the access to and generation, dissemination, storage, transfer and disposal of all FOUO information related to VHA-controlled space and to procurements to obtain, alter, or manage space, either Government-owned or leased, including VHA space that is delegated to other Federal agencies.

2. Executive Order 13556, signed on November 4, 2010, establishes a program for managing Controlled Unclassified Information, with the National Archives and Records Administration (NARA) serving as the executive agent. The Department of Veterans Affairs is in the process of developing Controlled Unclassified Information (CUI) standards in conformance with the Executive Order and NARA requirements. In advance of agency direction regarding the implementation of CUI, this memorandum specifically identifies and defines sensitive infrastructure information. Due to the increased use and transfer of electronic media it was determined that advance clarification of infrastructure data requirements is necessary. Data types that will be considered sensitive and therefore FOUO is as follows:

a. Facility drawings with technical details (e.g. cross-sections, construction details, wiring diagrams, etc.) on critical or secure areas.

b. Specifications with information on critical or secure areas, associated functions or systems.

c. Reports or investigations pertaining to facilities management or infrastructure containing information on critical or secure areas.

d. Facility Operation and Maintenance data (Preventative Maintenance records, Standard of Procedures. Maintenance and Operation manuals) on critical or secure areas.

Page2

Sensitive Infrastructure Data classification - For Official Use Only (FOUO)

3. Critical or secure areas shall include areas categorized as or like the following, at a minimum:

• Pharmacy vault and dispensing area;

• Agent cashier area;

• Police holding cells and weapons vault;

• National Continuity of Operations (COOP) centers as well as COOP facilities at each VAMC;

• National Emergency Response caches;

• Biological Safety Level - 3 laboratories;

• Security systems (Video Assessment and Surveillance System, Physical Access

Control System, Intrusion Detection System, etc.) and control centers;

• Information Technology room design details; and

• Animal research facility or laboratories.

4. If you have any questions, please feel free to contact Mr. Vincent Rizzo, Compliance Engineer, by phone at (716) 238-5587 or by email at Vincent.Rizzo@va.gov. In addition, please coordinate this guidance with your Network Capital Assets Manager and Medical Center Chief Engineers.

03-01-20

01 32 16.01 - 1

SECTION 01 32 16.01

ARCHITECTURAL AND ENGINEERING CPM SCHEDULES

PART 1- GENERAL

1.1 DESCRIPTION:

The Architect/Engineer of Record (A/E) shall develop a Critical Path

Method (CPM Schedule) plan and schedule demonstrating fulfillment of the contract requirements as designated in VA PG 18-15, shall keep the

CPM up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract. Conventional Critical Path Method (CPM) Precedence

Diagramming Method (PDM) technique will be utilized to satisfy both time and cost applications. All schedule data and reports required under this specification section shall be based upon regular total float, not relative total float schedules.

1.2 A/E'S REPRESENTATIVE:

A. The A/E shall designate an authorized representative in the firm who will be responsible for the preparation of the CPM Schedule, review and report progress of the project with and to the Project Manager and the

Contracting Officer.

B. The A/E's representative shall have direct project control and complete authority to act on behalf of the A/E in fulfilling the requirements of this specification section and such authority shall not be interrupted throughout the duration of the project.

1.3 A/E'S SCHEDULE PREPARATION:

A. To prepare the CPM Schedule, and subsequent periodic updates, which reflects the A/E's project plan, the A/E shall either designate a qualified individual within their firm or engage an independent CPM consultant (CPM Developer) who is skilled in the time and cost application of scheduling using (PDM) network techniques for Design projects, the cost of which is included in the A/E's bid.

B. Within 10 calendar days after award of the contract, the A/E shall submit to the Contracting Officer:

1. The name of the CPM Developer.

2. The Computer Software to be utilized.

3. Sufficient information to show that the CPM Developer has the qualifications to meet the requirements specified in the preceding paragraph.

01 32 16.01 - 2

C. The Contracting Officer has the right to approve or disapprove the designated CPM developer, and will notify the A/E of the VA decision within seven calendar days from receipt of information. In case of disapproval, the A/E shall resubmit another CPM Developer within 10 calendar days for renewed consideration. The A/E must have their CPM

Developer approved prior to submitting the Initial CPM Schedule

1.4 COMPUTER PRODUCED SCHEDULES

A. The A/E shall provide to the VA Project Manager, Contracting Officer and CPM Schedule Analyst, monthly computer processing of all computer-produced time/cost schedules and reports generated from monthly project updates. A hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data. These reports shall be submitted with and substantively support the A/E’s monthly payment request. The Project Manager shall identify the different report formats that the A/E shall provide based upon the monthly schedule updates.

B. The A/E is responsible for the correctness and timeliness of the computer-produced reports. The A/E is also responsible for the accurate and timely submittal of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.

C. The VA shall report errors in computer-produced reports to the A/E’s representative within ten calendar days from receipt of reports. The

A/E will reprocess the computer-produced reports and associated compact disk(s), when requested by the Contracting Officer’s representative, to correct errors which affect the payment and schedule for the project.

1.5 THE COMPLETE CPM SCHEDULE SUBMITTAL

A. Within 45 calendar days after receipt of Notice to Proceed, the A/E shall submit for the Project Manager and Contracting Officer's review;

three blue line copies of the complete CPM Schedule on sheets of paper

765 x 1070 mm (30 x 42 inches) and an electronic file, (PDM) format.

The submittal shall also include three copies of a computer-produced activity/event ID schedule showing project duration; phase completion dates; and other data, including event cost. Each activity/event on the computer-produced schedule shall contain as a minimum, but not limited to, activity/event ID, duration, predecessor and successor relationships, area code, description, budget amount, early start date, early finish date, late start date, late finish date and total float.

01 32 16.01 - 3

Work activity/event relationships shall be restricted to finish-to-start and start-to-start without lead or lag constraints.

Activity/event date constraints, not required by the contract, will not be accepted unless submitted to and approved by the Contracting

Officer. The A/E shall make a separate written detailed request to the

Contracting Officer identifying these date constraints and secure the

Contracting Officer’s written approval before incorporating them into the CPM Schedule. The Contracting Officer’s separate approval of the

CPM Schedule shall not excuse the A/E of this requirement. Logic events

(non-work) will be permitted where necessary to reflect proper logic among work events, but must have zero duration. The complete working

CPM Schedule shall reflect the A/E's approach to scheduling the complete project. The final CPM Schedule in its original form shall contain no contract modifications or changes which may have been incurred during the final CPM Schedule development period and shall reflect the entire contract duration as defined in the bid documents.

These changes/delays shall be entered at the first update after the final CPM Schedule has been approved. The A/E should provide their requests for time and supporting time extension analysis for contract time as a result of contract changes/delays, after this update, and in accordance with Article, ADJUSTMENT OF CONTRACT COMPLETION.

B. Within 30 calendar days after receipt of the complete project CPM

Schedule, the Project Manager of Contracting Officer will do one or both of the following:

1. Notify the A/E concerning his actions, opinions, and objections.

2. A meeting with the A/E at or near the job site for joint review, correction or adjustment of the proposed plan will be scheduled if required. Within 14 calendar days after the joint review, the A/E shall revise and shall submit three blue line copies of the revised

CPM Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified by the Contracting Officer. The revised submission will be reviewed by the Contracting Officer and, if found to be as previously agreed upon, will be approved.

C. The approved baseline CPM Schedule and the corresponding computer-produced schedule(s) shall constitute the approved baseline schedule until subsequently revised in accordance with the requirements of this section.

01 32 16.01 - 4

1.6 WORK ACTIVITY/EVENT COST DATA

The A/E shall cost load all work activities. The cost loading shall reflect the appropriate level of effort of the work activities/events.

The cumulative amount of all cost loaded work activities/events

(including alternates) shall equal the total contract price. Prorate overhead, profit and general conditions on all work activities/events for the entire project length. The A/E shall generate from this information cash flow curves indicating graphically the total percentage of work activity/event dollar value scheduled to be in place on early finish, late finish. These cash flow curves will be used by the Contracting Officer to assist him in determining approval or disapproval of the cost loading. In the event of disapproval, the A/E shall revise and resubmit in accordance with Article, THE COMPLETE

PROJECT CPM SCHEDULE SUBMITTAL. Negative work activity/event cost data will not be acceptable, except on VA issued contract changes.

1.7 CPM SCHEDULE REQUIREMENTS

A. Show on the CPM Schedule the sequence and interdependence of work activities/events required for complete performance of all items of work. In preparing the CPM Schedule, the A/E shall:

1. Exercise sufficient care to produce a clear, legible and accurate

CPM Schedule.

2. Show the following on each work activity/event:

a. Activity/Event ID number.

b. Concise description of the work represented by the activity/event. (35 characters or less including spaces preferred).

c. Performance responsibility.

d. Duration (in work days.)

e. Cost (in accordance with Article, ACTIVITY/EVENT COST DATA of this section and less than $99,999 per activity).

f. Manpower required (average number of men per day).

3. Show activities/events as:

a. A/E's time required for submittal of drawings.

b. VA review and approval of drawings, equipment schedules, samples, template, or similar items.

c. Interruption of VA Medical Center utilities, delivery of

Government furnished equipment, project phasing and any other specification requirements.

01 32 16.01 - 5

4. Show activities/events for work for each discipline.

5. Break up the work into activities/events of duration no longer than

20 work days each, except for which the Project Manager and/or the

Contracting Officer may approve the showing of a longer duration.

6. Describe work activities/events clearly, so the work is readily identifiable for assessment of completion. Activities/events labeled

"start," "continue," or "completion," are not specific and will not be allowed. Lead and lag time activities will not be acceptable.

7. Uniquely number each activity/event with numbers ranging from 1 to

99998 only. The CPM Schedule should be generally numbered in such a way to reflect disciplines, phase or location of the work.

B. Submit the following supporting data in addition to the CPM Schedule, activity/event ID schedule and electronic file (s). Failure of the A/E to include this data will delay the review of the submittal until the

Contracting Officer is in receipt of the missing data:

1. The proposed number of working days per week.

2. The holidays to be observed during the life of the contract (by day, month, and year).

C. To the extent that the CPM Schedule or any revised CPM Schedule shows anything not jointly agreed upon, it shall not be deemed to have been approved by the Contracting Officer. Failure to include any element of work required for the performance of this contract shall not excuse the

A/E from completing all work required within any applicable completion date of each phase regardless of the Contracting Officer's approval of the CPM Schedule.

D. Compact Disk Requirements and CPM Activity/Event Record Specifications:

Submit to the VA (Project Manager and CPM Schedule Analyst) an electronic file(s) containing one file of the data required.

1.8 PAYMENT TO THE A/E:

A. Monthly, the A/E shall submit the AIA application and certificate for payment documents G702 & G703 reflecting updated schedule activities and cost data. The A/E is entitled to a monthly progress payment upon approval of estimates as determined from the currently approved updated computer-produced calendar-dated schedule unless, in special situations, the Contracting Officer permits an exception to this requirement.

B. When the A/E fails or refuses to furnish to the Contracting Officer the information, which, in the sole judgment of the Contracting Officer, is

01 32 16.01 - 6 necessary for processing the monthly progress payment, the A/E shall not be deemed to have provided an estimate and supporting schedule data upon which progress payment may be made.

1.9 PAYMENT AND PROGRESS REPORTING

A. Monthly progress meetings shall be held on dates mutually agreed to by the Project Manager and/or Contracting Officer and the A/E. The A/E shall update the project schedule and all other data required by this section shall be accurately filled in and completed prior to the monthly progress meeting. The A/E shall provide this information to VA three work days in advance of the progress meeting. Job progress will be reviewed to verify:

1. Actual start and/or finish dates for updated/completed activities/events.

2. Remaining duration, required to complete each activity/event started, or scheduled to start, but not completed.

3. Logic, time and cost data for change orders, and supplemental agreements that are to be incorporated into the CPM Schedule and computer-produced schedules. Changes in activity/event sequence and duration which have been made pursuant to the provisions of following Article, ADJUSTMENT OF CONTRACT COMPLETION.

4. Percentage for completed and partially completed activities/events.

5. Logic and duration revisions required by this section of the specifications.

6. Activity/event duration and percent complete shall be updated independently.

B. The A/E shall submit a narrative report as a part of his monthly review and update, in a form agreed upon by the A/E and the Contracting

Officer. The narrative report shall include a description of problem areas; current and anticipated delaying factors and their estimated impact on performance of other activities/events and completion dates;

and an explanation of corrective action taken or proposed.

C. After completion of the joint review and the Contracting Officer's approval of all entries, the A/E shall generate an updated computer-produced calendar-dated schedule and supply the Contracting Officer’s representative with reports in accordance with the Article, COMPUTER

PRODUCED SCHEDULES, specified.

D. After completing the monthly schedule update, the A/E’s scheduling person shall rerun all current period contract change(s) against the

01 32 16.01 - 7 prior approved monthly project schedule. The analysis shall only include original workday durations and schedule logic agreed upon by the A/E and Project Manager for the contract change(s). When there is a disagreement on logic and/or durations, the CPM Schedule update shall use the schedule logic and/or durations provided and approved by the

Project Manager. After each rerun update, the resulting electronic project schedule data file shall be appropriately identified and submitted to the VA in accordance to the requirements listed in articles 1.4 and 1.7. This electronic submission is separate from the regular monthly project schedule update requirements and shall be submitted to the resident engineer within fourteen (14) calendar days of completing the regular schedule update. Before inserting the contract changes durations, care must be taken to ensure that only the original durations will be used for the analysis, not the reported durations after progress. In addition, once the final CPM Schedule is approved, the A/E must recreate all manual progress payment updates on this approved CPM Schedule and associated reruns for contract changes in each of these update periods as outlined above for regular update periods. This will require detailed record keeping for each of the manual progress payment updates.

E. After VA acceptance and approval of the final CPM Schedule, and after each monthly update, the A/E shall submit to the Contracting Officer three blue line copies of a revised complete CPM Schedule showing all completed and partially completed activities/events, contract changes and logic changes made on the intervening updates or at the first update on the final diagram. The Contracting Officer may elect to have the A/E do this on a less frequent basis, but it shall be done on a quarterly basis as a minimum.

1.10 RESPONSIBILITY FOR COMPLETION

A. Whenever it becomes apparent from the current monthly progress review meeting or the monthly schedule that phasing or contract completion dates will not be met, the A/E shall execute some or all of the following remedial actions:

1. Increase manpower in such quantities and discipline as necessary to eliminate the backlog of work.

2. Increase the number of working hours to eliminate the backlog of work.

01 32 16.01 - 8

3. Reschedule the work in conformance with the specification requirements.

B. Prior to proceeding with any of the above actions, the A/E shall notify and obtain approval from the Project Manager and/or the Contracting

Officer for the proposed schedule changes. If such actions are approved, the CPM revisions shall be incorporated by the A/E into the

CPM Schedule before the next update, at no additional cost to the

Government.

1.11 CHANGES TO CPM SCHEDULE AND SCHEDULE

A. Within 30 calendar days after VA acceptance and approval of any updated computer-produced schedule, the A/E will submit a revised CPM Schedule

B. Contracting Officer's approval for the revised CPM Schedule and all relevant data is contingent upon compliance with all other paragraphs of this section and any other previous agreements by the Contracting

Officer or the VA representative.

D. The cost of revisions to the CPM Schedule resulting from contract changes will be included in the proposal for changes in work as specified in Article, FAR 52.243 -4 (CHANGES), and will be based on the complexity of the revision or contract change, man hours expended in analyzing the change, and the total cost of the change.

E. The cost of revisions to the CPM Schedule not resulting from contract changes is the responsibility of the A/E .

1.12 ADJUSTMENT OF CONTRACT COMPLETION

A. The contract completion time will be adjusted only for causes specified in this contract. Request for an extension of the contract completion date by the A/E shall be supported with a justification, CPM data and supporting evidence as the Contracting Officer may deem necessary for determination as to whether or not the A/E is entitled to an extension of time under the provisions of the contract. Submission of proof based on revised activity/event logic, durations (in work days) and costs is obligatory to any approvals. The schedule must clearly display that the

A/E has used, in full, all the float time available for the work involved in this request. The Contracting Officer's determination as to the total number of days of contract extension will be based upon the current computer-produced calendar-dated schedule for the time period in question and all other relevant information.

B. Actual delays in activities/events which, according to the computer-produced calendar-dated schedule, do not affect the extended

01 32 16.01 - 9 and predicted contract completion dates shown by the critical path in the network, will not be the basis for a change to the contract completion date. The Contracting Officer will within a reasonable time after receipt of such justification and supporting evidence, review the facts and advise the A/E in writing of the Contracting Officer's decision.

C. The A/E shall submit each request for a change in the contract completion date to the Contracting Officer in accordance with the provisions specified under Article, FAR 52.243 -4 (CHANGES). The A/E shall include, as a part of each change order proposal, a sketch showing all CPM logic revisions, duration (in work days) changes, and cost changes, for work in question and its relationship to other activities on the approved CPM Schedule.

D. All delays due to non-work activities/events such as RFI’s, WEATHER, STRIKES, and similar non-work activities/events shall be analyzed on a month by month basis.

1.13 PROJECT DESIGN SCHEDULE RISK ANALYSIS/MITIGATION PLAN

A. Schedule Risk Analysis – The A/E shall conduct the statistical schedule risk analysis based on the above detailed construction activities in the Day 1 approved diagram, identifying major schedule risk areas and recommended risk mitigation plans as outlined below.

B. The risk analysis shall be conducted by a person or firm skilled in the statistical method of schedule risk analysis based on the (PDM) CPM

Schedule techniques for major projects, preferably in the major health care related projects. The cost of this service shall be included in the A/E's proposal.

C. The Contracting Officer has the right to approve or disapprove the

Person or firm designated to perform the risk analysis.

1.14 RISK ANALYSIS FORMAT / REQUIREMENTS / SUBMITALS

A. Risk Analysis Software / Format - Within 45 calendar days after receipt of Notice to Proceed, the A/E shall submit for the Contracting

Officer's review; a Risk Analysis software to be utilized, the method of performing the analysis, the format of presenting the data and the reports for VA approval.

B. Conduct Risk Analysis / Submittals - Based on the approved software / format, the consultant shall perform statistical risk analysis on the detailed approved Day 1 diagram. The A/E shall review and utilize any previous Risk analysis based on the “semi-detailed” schedule logic and

01 32 16.01 - 10 schedule to ensure the continuity of previous schedule risk analysis.

The A/E’s project manager shall identify the major schedule risk areas and possible risk mitigation strategy/plan and record it in a narrative format, with electronic file submission to VA. The risk analysis exercise shall be performed or updated at least on a quarterly basis or as directed by the VA Contracting officer.

C. The submittal shall include three copies of a computer-produced risk analysis results, predicting the various meaningful probability curves of achieving the contract schedules. It shall also include a detailed narrative list of all major and minor potential and specific schedule and cost risk areas, and a A/E ’s recommendations of mitigating the identified risks which must be addressed by the VA Project and Resident engineer teams to maintain the contract schedule.

- - - E N D - - -

Program Guide, PG-18-15, Volume C Nov 2008

Department of Veterans Affairs

VA Medical Center Projects

A/E Submission Instructions for Minor and NRM Construction Program:

• Schematics

• Design Development

• Construction Documents

Program Guide, PG-18-15, Volume C Page i May 2006

Department of Veterans Affairs Washington, DC 20420

FOREWORD

This document states the minimum requirements for each submission in the production of VA Schematics, Design Development, and Construction Documents for Minor and NRM Construction Program for Medical Center Projects. It will give VA reviewers and the A/E a clear understanding of what is required of the A/E at each stage of design.

This document does not relieve the A/E firms of their professional responsibility to produce a correct, complete, and fully coordinated set of construction documents.

Lloyd H. Siegel William W. Graham Director, Facilities Quality Office (Acting) Director, Engineering Management and Field Support Office

Program Guide, PG-18-15, Volume C Page ii

A/E SUBMISSION INSTRUCTIONS FOR

MINOR AND NRM CONSTRUCTION PROGRAM

MEDICAL CENTER PROJECTS

Table-of-Contents

I. GENERAL

A. INTRODUCTION

B. A/E RESPONSIBILITIES

C. SUBMISSION POLICY

D. QUALITY ASSURANCE/QUALITY CONTROL

E. ADDITIONAL SERVICES

F. CRITICAL PATH METHOD

II. SUBMISSIONS

A. SITE DEVELOPMENT

B. ARCHITECTURAL

C. FIRE PROTECTION

D. INTERIOR DESIGN

E. STRUCTURAL

F. PLUMBING

G. SANITARY

H. HVAC

I. ELECTRICAL

J. EQUIPMENT

K. STEAM GENERATION

L. STEAM DISTRIBUTION (OUTSIDE)

M. SOLID WASTE DISPOSAL SYSTEM (INCLUDING INCINERATION)

N. AUTOMATIC TRANSPORT

O. ASBESTOS ABATEMENT

P. SPACE PLANNING

Q. CRITICAL PATH METHOD (CPM)

Program Guide, PG-18-15, Volume C Page iii

Table of Contents (Cont.)

R. ESTIMATING

S. SPECIFICATIONS

T. FINAL BID DOCUMENTS

III. DISTRIBUTION OF A/E MATERIAL

A. SYMBOL IDENTIFICATION OF CONTRACT DRAWINGS

B. GENERAL NOTES

Program Guide, PG-18-15, Volume C 1 November 2008

A/E SUBMISSION INSTRUCTIONS FOR

MINOR AND NRM CONSTRUCTION PROGRAM

MEDICAL CENTER PROJECTS

Note: This document is intended for electronic use. Edit and delete submission items that are not required and renumber footnotes accordingly in Section II. Complete the attachment in Section III.

I. GENERAL

A. INTRODUCTION

1. This document contains information and minimal submission requirements for contract documents specified in the A/E contract.

2. The Department of Veterans Affairs (VA) may contract with an Architect/Engineer (A/E) for any portion of a design: Schematics, Design Development, Construction Documents, or a combination of these.

a. For projects where the VA is contracting for Schematics Documents only, Schematics and Design Development Documents only, or Schematics, Design Development, and Construction Documents, the VA will provide the Design Program (if available), Facility Development Plans (if available), and VA design standards to accompany the Scope of Work for the project.

b. For projects where the VA is contracting for Design Development and

Construction Documents only, the VA will provide the Schematics Plans and VA design standards to accompany the Scope of Work for the project.

c. For projects where the VA is contracting for Construction Documents only, the VA will provide the Design Development Plans and VA design standards to accompany the Scope of Work for the project.

3. Coordinate all activities with the VA Medical Center (VAMC). Hold informal meetings (upon mutual consent of the VA and the A/E) at the VAMC to discuss the design and related issues. Continue to expand contacts by telephone, rough sketch studies and other means of communication with the purpose of finalizing a general design approach to be followed.

4. Final approved Schematic documents shall be the basis for the development of the Design Development phase. Likewise, final approved Design

Program Guide, PG-18-15, Volume C 2

Development documents shall be the basis for the development of the Construction Documents phase. The VAMC must approve any changes from each set of documents before the A/E proceeds to the next phase.

5. VA will review all submittals for functional and aesthetic relationships.

However, no further functional decisions are anticipated after the Design Development phase.

6. Provide a design narrative/analysis for each technical discipline (e.g., architectural, mechanical, fire protection, etc.) which describes the intent of each discipline with schematic and/or design development submission.

7. Provide computations and sizing calculations for electrical, mechanical

(HVAC, plumbing, and steam), sanitary, structural and fire protection designs.

For computerized calculations, submit complete and clear documentation of computer programs, interpretation of input/output, and description of program procedures.

8. Provide individually packaged drawings for each submission to each unit specified in the "Distribution of A/E Materials" section.

9. Submit a complete set of final approved drawings incorporating all revisions, within 30 days after completion of the Schematics and Design Development stages.

10. At each review stage, the VA’s technical reviewer, a value-engineering consultant, or a construction manager will perform a value engineering review.

11. Submit final drawings (Bid Documents) in 3 1/2" floppy disks to be used with the AutoCAD version at the VAMC. Submit instructions on the use of the disks along with a complete listing of all layers that are used.

B. A/E RESPONSIBILITIES:

1. Contract documents shall meet or exceed the requirements of this document.

2. The A/E is responsible for producing a complete set of drawings, design narrative/analysis, calculations, sample boards, and specifications in accordance with professional standard practices and VA criteria. Each A/E discipline shall receive a copy of their respective VA design manuals, standard details, construction standards, and VA National CAD Standard Application Guide. The AE is responsible for obtaining the NCS.

Program Guide, PG-18-15, Volume C 3

3. A/E shall conduct coordination meetings between A/E technical disciplines before submitting material for each VA review and provide minutes of the meetings to VAMC.

4. A/E shall adhere to the approved Memorandum of Agreement (MOA).

5. A/E shall provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section.

6. In addition, the A/E shall conduct interim fire protection installation inspections and witness final fire protection equipment testing.

C. SUBMISSION POLICY:

1. There is a Schematic* submission, a Design Development (DD**) submission, and a Construction Document (CD***) submission indicated in this guide. The VAMC may alter the submission requirements depending upon the complexity of the project by adding or deleting certain reviews. Where additional reviews might be required, the VAMC will issue, at their discretion, a detailed “Statement of Task” or supplemental instructions to the A/E, which would be provided at the time of solicitation for a fee proposal.

2. At each submission, the A/E shall date all material and present the designs on VA standard size drawings that are appropriately labeled, "SCHEMATIC SUBMISSION", “DESIGN DEVELOPMENT SUBMISSION”, OR

“CONSTRUCTION DOCUMENT SUBMISSION”, in large block letters above or beside the VA standard drawing title block. In each submission, the A/E shall incorporate the corrections, adjustments, and changes made by VA at the previous review.

D. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC):

In an effort to reduce construction change orders due to design errors and omissions, the Office of Facilities Management has initiated a Quality Assurance/Quality Control program. The A/E shall develop, execute, and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. The requirements are as follows:

1. Fee Proposal: Provide an outline of the actions that your firm will take during the design process along with an associated fee.

2. Two Weeks after Receipt of the Notice To Proceed: Submit a detailed

QA/QC Plan describing each step that will be taken during the development of the various phases of design. Each step should have an appropriate space where a senior member of the firm can initial and date when the action has been completed.

Program Guide, PG-18-15, Volume C 4

3. 100% Submittal: Submit the completed QA/QC Plan along with the latest marked-up documents (plans, specifications, etc.) necessary to ensure that a thorough review and coordination have been completed.

E. ADDITIONAL SERVICES:

If additional services (i.e. surveys, soil borings, asbestos surveys, water flow testing, or lead surveys), are necessary to be performed by consultants, submit criteria for the work to be performed to the VAMC Contracting Officer as soon as possible. Upon approval of the criteria, submit proposals and qualifications of at least three firms being considered for the work in accordance with the contract procedures (CP1) of the contract, together with a proposal from the recommended firm and a brief justification for its selection, for VA approval. A/E should submit survey information for the Schematic Review.

F. CRITICAL PATH METHOD PHASING MEETINGS

A. If required and prior to submission of Schematic material, the A/E shall meet with the VAMC’s Project Manager to discuss and outline phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor's approach to the construction project. The A/E shall be responsible for recording the phasing requirements.

B. Submit a phasing narrative and phasing plans (on reduced size plans) within two weeks after each phasing meeting to the VAMC Project Manager. VA will review these submission(s) and return comments to the A/E within two weeks of receipt. The A/E will then use this information in preparing their schematic, design development, and construction document submissions.

Program Guide, PG-18-15, Volume C 5

A. SITE DEVELOPMENT: Submit the following:

Site Development: Schematics* DD** CD***

Narrative Analysis of site Circulation study Phasing analysis Parking analysis Development concept showing proposed buildings and structures

Landscape drawings with plant groupings

Topographic, utility, and landscape survey

Demolition plan Layout plan showing location of:

• Building and structures

• Roads

• Fire Access

• Parking

• Accessible spaces

• Van spaces

• Mechanical and electrical equipment on grade

• Future expansion

• Off-site roads

• Off-site utilities

• Service area(s)

• Entrances and exits

• Walks

• Inlets

• Contractor's staging area

• Vertical and horizontal road alignment

• Paving joint patterns Grading plan showing:

• Existing contours

• Proposed contours

• Spot elevations at structure corners, entrances, equipment pads, etc.

• First floor elevations

Program Guide, PG-18-15, Volume C 6

Site Development: Schematics* DD** CD***

• Rim and invert elevations on storm drainage fixtures

• Erosion and sediment control Rock excavation (quantity) Planting plan showing:

• List of plant material

• Limits of irrigation Site details Landscape details Signage plan and schedule Specifications

* Submit site and landscape plans at an appropriate scale to show all work involved.

** Submit site and landscape plans at same scale as topographic/utility survey incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.

Program Guide, PG-18-15, Volume C 7

B. ARCHITECTURAL: Submit or show the following:

Architectural: Schematics* DD** CD***

Location of:

• Rooms1

• Doors2

• Corridor(s)3

• Basic column grid/sizes

• Expansion and seismic joints

• Electrical closets

• Equipment rooms

• Signal and telephone closets

• Mechanical shafts and space

• Stair(s)

• Ramp(s)

• Elevator(s)

• Automatic Conveyances Floor Plans/Drawings:

• All floors (new and renovated)

• Penthouse

• Roof plan

• Pipe basement

• Pipe tunnel

• Reflected ceiling4

• Equipment floor plans 1:50 (1/4 inch) scale5

• Demolition plans6 Room names and numbers7 Program net/designed net Exterior dimensions/total building gross area

Size and shape of all departmental functions and services9

Exterior building elevations10 Finish floor elevations11 Door locations, sizes, and swings Wall thickness and chase walls Handrail location/dimensions Fixed equipment Equipment elevations and details Plumbing fixtures Wheelchair accessible facilities

Program Guide, PG-18-15, Volume C 8

Architectural: Schematics* DD** CD***

Wall sections12 Building sections13 Finish grades at corners, entrances, exits, platforms and ramps

Fire and smoke rated partitions14 Lead-lined and radio-frequency-shielded partitions14

Fire extinguisher cabinets14 Spray-on fire proofing (see fire protection)

Construction details15 Drafting symbols, abbreviations, and general notes

Door, window, and louver schedules Interior details, elevations, sections Finish schedule16 Graphics and signage17 Color rendering Specifications Lead abatement18 Lead abatement specification19

* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.

B. NOTES:

1. Use lines between spaces to indicate the centerline of the partition (for schematics only).

2. Indicate doors with a slash mark.

3. Along the corridor, the line shall represent the corridor side of the partition.

Program Guide, PG-18-15, Volume C 9

4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.

5. Identify all equipment for each room. Indicate and coordinate all equipment with the Equipment Guide List (Program Guide 7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)], and relocated (R) equipment. Equipment floor plans are not required for the offices, consultation rooms, classrooms, conference rooms, and waiting rooms within the above departments. Draw equipment details which are necessary for major decisions, though complete detailing is not required for this submittal.

6. Indicate existing finish schedule and notes on plan.

7. Label as required for schematic drawings. Coordinate new room numbering with medical center.

8. Use the same names on drawings as those used in the space program.

Provide area figures in fractional form, e.g., 400/390. Indicate space provided, but not called for in the space program, as: -/390.

9. Label each service or activity listed in the Project Scope Data of the Design Program and indicate boundaries with a distinctive line. Include the activity code number (see Handbook 7610).

10. If the project requires exterior work, show all facades indicating massing, proposed fenestration and the building relationship to adjacent structures and the finish grade. Show all significant building materials, including their colors, any proposed roof top mechanical equipment, architectural screens, skylights, and stacks on the elevation drawings. If building is designed for future expansion (vertical and/or horizontal), delineate elevations with and without the future expansion. If project is an addition, show elevations of the existing building in sufficient detail to illustrate the relationship between the new and existing in terms of scale, material, and detail.

11. Define the relationship of the finish ground floor to finish grade at major entrances and docks.

12. Indicate construction including fire resistance rating, building materials and systems, and proposed sill and head heights of openings. Indicate both new and renovated areas on form provided by VA.

Program Guide, PG-18-15, Volume C 10

13. Define building configuration. Draw sections at the same scale as floor plans, normally 1:100 (1/8 inch). If the building abuts an existing structure, indicate in the section how the new floor elevations align with existing.

14. Identify psychiatric areas where special considerations are required to ensure the safety of patients (e.g. hard ceilings, safety glazing, etc.).

15. Indicate new building components and systems, such as window design, roofing system, special entryways, building "skin", and any special architectural elements for the project. Complete detailing of miscellaneous items is not required for this submission.

16. Indicate all building systems, materials, and future expansion, if applicable.

17. Submit a drawing for all which is part of the construction contract.

18. Provide square meters (feet) of lead paint and x-ray shielding to be removed.

19. Format provided in SPECIFICATIONS. If there is no VA master specification, develop contract specification that is in compliance with regulations of the Environmental Protection Agency.

Program Guide, PG-18-15, Volume C 11

C. FIRE PROTECTION: Submit the following:

Fire Protection: Schematics* DD** CD***

Fire protection narrative:1

• Fire and smoke separation

• Fire sprinkler/standpipe system

• Size of fire pumps

• Water supply available/max.

demand

• Water flow testing results

• Fire alarm systems2

Existing to be modernized Base loop system for interface of new construction

• Kitchen extinguishing systems

• Size of air handling unit

• Exit paths from each zone

• Distances to stairs

• Occupancy of each area

• Exit calculations for each floor

• Smoke control features Floor Plans/Drawings:3 & 4

• Sprinkler zones

• Fire alarm zones

• Smoke zones

• Building water supply

• Interior sprinkler supply lines

• Standpipes

• Fire extinguisher cabinets

• Fireproofing of structural members

• Sprinkler/standpipe riser supply piping

• Termination of sprinkler main and inspector test drains

• Sprinkler alarm valves

• Waterflow and tamper switches

• Sprinkler system fire department connections

• Sprinkler design hazards per

NFPA 13

• Exit signs and emergency lighting

Program Guide, PG-18-15, Volume C 12

• Occupied areas not protected by automatic sprinklers

Calculations Estimated capacities for proposed air handling units in cubic meters (cubic feet) per minute

Location of:

• Fire alarm system

• Annunciator panels

• Pull stations

• Flow switches

• Audio-visual devices

• Smoke detectors

• Duct smoke detectors

• Smoke dampers

• Fire dampers

• Fire alarm risers5

• Exit signs

• Emergency lighting

• Fire sprinklers

• Standpipes

• Fire hydrants

• Fire pumps

• Post indicator valves

• Sectional valves

• Fire extinguisher cabinets

• Electromagnetic door hold open devices

Wall sections indicating fire resistive ratings

Staff sleeping rooms Excavation plan signage Door and window schedule with fire rating or fire rated glazing

Zoning of each fire alarm initiating device

Details:

• Fire pump system (capacity and pressure)

• Elevation and isometric view of fire pump

Program Guide, PG-18-15, Volume C 13

• Stairwell sign

• Annunciator panel Interconnection of fire alarm system with:

• Smoke dampers

• Air handlers

• Elevator controls

• Kitchen fire extinguishing and fire pump system

• HVAC system with smoke duct detectors

Single line riser diagram for fire alarm system

Height/configuration of storage racks and shelving

1:100 (1/8 inch). Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.

** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all of the revisions required by comments from schematics.

*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch)

Program Guide, PG-18-15, Volume C 14

C. NOTES:

1. Indicate NFPA 220 and UBC fire resistive rating of the building, NFPA 101 occupancy type, and fire protection code analysis to access compliance with

NFPA 101.

2. Determine type, features, age, reliability, compliance with present day codes, capacity, zoning, supervision, control panel and power supplies, initiating devices and circuits, and auxiliary functions for existing fire alarm system. Indicate manufacturer, model number, voltage, and wiring style of existing alarm systems and devices. Provide recommendations for the proposed fire alarm work.

3. Provide information to meet JCAHO requirements; e.g. location of all fire rated barriers, smoke barriers, exit signs, fire extinguishers, manual pull stations, smoke detectors, and sprinkler flow switches. Show all interim life safety measures such as temporary systems Fire Alarm, Sprinkler, and Smoke.

4. At DD Submission, add room names, room numbers, door locations and swings, smoke and fire rated partitions, sprinkler/standpipe risers to floor plans.

Identify psychiatric areas on drawings so areas for institutional type heads are identified. Add location of all valves (post indicator, sectional) and backflow preventer if provided.

5. Show new equipment and/or the necessary changes involved if modification to the existing system is required. Include any recommendations where certain requirements of VA criteria might be waived, in order to allow the existing equipment to be reused.

Program Guide, PG-18-15, Volume C 15

D. INTERIOR DESIGN: Submit the following:

Interior Design: Schematics* DD** CD***

Written interior design concept1 Illustrate overall design solution2 Material and finish samples Sketches Design solution for interior spaces:

• Perspectives

• Plans

• Details

• Elevations

• Sections

• Wayfinding

• Floor patterns

• Wall patterns

• Lighting

• Signage

• Handrails

• Bumper guards Specification section 09050 Finish schedule Exterior colors and materials Sample boards for interior and exterior materials, products, and finishes

Edited carpet and wallcovering specifications

Keyed…