This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a Department of Veterans Affairs construction project at the Amarillo VA Medical Center. Amendment 0012 updates the solicitation for project 504-21-700, specifically correcting the project number in the contract opportunities posting and providing a revised solicitation that replaces the previous version from amendment 0006.

Key updates include changes to the SF 1442, price schedule, instructions to offerors, evaluation criteria, clauses, and provisions. Three attachments have been updated: the Construction Statement of Work, Limitations on Subcontracting for Construction, and the Performance Preference Questionnaire (PPQ) for Amarillo. The project involves infrastructure upgrades with a total project completion timeline of 548 calendar days after the notice to proceed, involving general construction, alterations, roads, walks, grading, drainage, and removal of existing structures.

View the file

Other files

File Type Posted
36C77624R0084 0006 SF 30.docx DOCX document
PPQ - Amarillo.docx DOCX document
Limitations on Subcontracting - Construction.docx DOCX document
Att 1 Construction SOW Revised 504-21-700 - 3-27-25.pdf PDF
RFP 36C77624R0084 3-28-2025.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

03-28-2025

504-21-700 36C776 Kara Evert Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77624R0084 12-18-2024

X

ONE

The purpose of this amendment is to:

1) Correct the project number in the Contract Opportunities posting

2) Provide the SF 30 for amendment 0006 for offerors' use to acknowledge receipt and acceptance that was not previously provided

3) Provide a revised solicitation that replaces the previous updated solicitation in its entirety from amendment 0006

4) Provide three updated solicitation attachments See page 2 for more details.

Richelle Gray Contracting Officer

VA-VHA-RPOC-2023-0041

With this amendment to the solicitation, the following updates are being implemented:

1) The revised RFP includes changes to the SF 1442, price schedule, instructions to offerors (evaluation criteria), clauses and provisions.

2) The following RFP attachments have been updated or corrected:

· Att 1 Construction SOW Revised 504-21-700 - 3-27-25 replaces Att 1 Construction SOW Prj 504-21-700 11.13.24

· Limitations on Subcontracting - Construction replaces Att 2-Limitations on Subcont – Constr

· PPQ - Amarillo replaces Att 21-PPQ

See attached document: 36C77624R0084 0006 SF 30.

See attached document: Att 1 Construction SOW Revised 504-21-700 - 3-27-25.

See attached document: Limitations on Subcontracting - Construction.

See attached document: PPQ - Amarillo.

End of Document