Attachment 6 - Drawings - PACT B4 - Part 4.pdf
PDF 12 MB Posted
- Attached to
- Y1DA--656-400 Construct PACT B4 Minor Construction - St. Cloud, MN Federal contract opportunity
- Solicitation number
- 36C77624B0021
About this file
This document is Attachment 6 - Drawings - PACT B4 - Part 4.pdf, which provides technical drawings related to the federal contract opportunity 36C77624B0021 for the construction of PACT B4 Minor Construction in St. Cloud, MN. The contract is being solicited by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings cover various architectural, structural, mechanical, electrical, and plumbing specifications for the construction project. This attachment provides detailed technical information to support the requirements outlined in the overall solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C77624B0021 0002.pdf | ||
| Technical Questions - PACT B4.pdf | ||
| 36C77624B0021 0001.docx | DOCX document | |
| S06-Site Visit Sign-in PACT B4 - 0001.pdf | ||
| Attachment 12 - Site Visit Map.pdf | ||
| Attachment 9 - Brand Name JandA - St Cloud.pdf | ||
| Attachment 3 - Drawings - PACT B4 - Part 1.pdf | ||
| Attachment 2 - Specifications - PACT B4 - Vol 02.pdf | ||
| Attachment 11 - Division Cost Breakdown.xlsx | XLSX spreadsheet | |
| Attachment 10 - Wage Rates - Stearns County 7.9.pdf | ||
| Attachment 7 - Asbestos and Lead Report.pdf | ||
| Attachment 1 - Specifications - PACT B4 - Vol 01.pdf | ||
| Attachment 8 - Limitations on Subcontracting - Construction.docx | DOCX document | |
| Attachment 5 - Drawings - PACT B4 - Part 3.pdf | ||
| Attachment 4 - Drawings - PACT B4 - Part 2.pdf | ||
| 36C77624B0021_1.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UCF
656-400
10/28/22CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
KEY PLAN
10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS
10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
1-HOUR FIRE/SMOKE BARRIER
2-HOUR FIRE/SMOKE BARRIER
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
(EXISTING)
1-HOUR FIRE/SMOKE BARRIER (EXISTING)
2-HOUR FIRE/SMOKE BARRIER (EXISTING)
LCDA
DENOTES 5'-0" WHEELCHAIR TURNING RADIUS
CLEARANCE.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:
Dennis Mika
10/28/2022
10/28/22CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
KEY PLAN
10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS
ZONE 1
ZONE 2
10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
1-HOUR FIRE/SMOKE BARRIER
2-HOUR FIRE/SMOKE BARRIER
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
(EXISTING)
1-HOUR FIRE/SMOKE BARRIER (EXISTING)
2-HOUR FIRE/SMOKE BARRIER (EXISTING)
LCDA
DENOTES 5'-0" WHEELCHAIR TURNING
RADIUS CLEARANCE.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:
UCF
10/28/22CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
KEY PLAN
10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS
ZONE 1
ZONE 2
10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
1-HOUR FIRE/SMOKE BARRIER
2-HOUR FIRE/SMOKE BARRIER
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
(EXISTING)
1-HOUR FIRE/SMOKE BARRIER (EXISTING)
2-HOUR FIRE/SMOKE BARRIER (EXISTING)
LCDA
DENOTES 5'-0" WHEELCHAIR TURNING
RADIUS CLEARANCE.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:
10/28/22CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS
10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS
LCDA
X
JMcAllister Snapshot
FIRE PROTECTION SYMBOL LIST
SYMBOL: DESCRIPTION:
FIRE PROTECTIONFP
FIRE PROTECTION - DRY SYSTEMFPD
SERVICE WATER - POTABLEW
AIR PRESSURE MAINTENANCE DEVICE
AIR SUPERVISORY SWITCH
ANGLE VALVE
BUTTERFLY VALVE WITH MONITOR SWITCH
OS&Y GATE VALVE
OS&Y GATE VALVE WITH MONITOR SWITCH
PRESSURE SWITCH
P
NO SYMBOL LIGHT HAZARD
ORDINARY GROUP 1
ORDINARY GROUP 2
INSPECTOR TEST AND DRAIN VALVE
MONITOR SWITCH
COMPRESSED AIR - FIRE PROTECTIONCAF
PIPE CAP
PIPE DOWN
NEW CONNECTION
PIPE UP OR UP/DOWN
SHUTOFF VALVE NORMALLY OPEN
DRAINDFP
NOT ALL SYMBOLS MAY APPLY.
AUTOMATIC DRAIN VALVE
UNION/FLANGE
DIRECTION OF FLOW IN PIPE
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
CHECK VALVE
FLOW SWITCH
F
ROUTE TO DRAIN
AREA BOUNDARY
OH1
OH2
FIRE PROTECTION ABBREVIATION KEY
AD ACCESS DOOR
BFP BACKFLOW PREVENTER
N.C. NORMALLY CLOSED
ABOVE FINISHED FLOORAFF
NC NEW CONNECTION
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
I.E. INVERT ELEVATION
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
T101
SIM
DETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
NEW WORK BY THIS CONTRACTOR
(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR
(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN
(LIGHT SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK SHORT DASHED LINE)
LINE TYPE KEY:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
NURSE CALL CONTRACTORN.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
FOOD SERVICE CONTRACTORF.S.C.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO THE VA.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM NON-STRUCTURAL BUILDING
ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE
APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
18. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSERS, RETURN, AND EXHAUST
GRILLES. ALL DAMPERS ARE NOT SHOWN ON PLANS.
19. CONTRACTOR SHALL REPAIR AND/ OR REPLACE ALL INSULATION AT EXISTING SHEET METAL
DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES AND SHALL
REPAIR OR REPLACE ANY INSULATION AT NEW AND OLD DUCT CONNECTIONS AND ANY
MISSING OR DAMAGED INSULATION ON REUSED OR EXISTING DUCTWORK.
20. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS
LOCATED ABOVE THE CEILING THAT REQUIRE OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND/ OR CALIBRATION.
ENGINEERING DISCIPLINE REFERENCE NOTES
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER
REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED
WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A
DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE
TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED
AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE
BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL
DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS
TO BE FOLLOWED.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM LIMITED
FIELD OBSERVATIONS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING
CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ARCHITECT AND VA COR IN WRITING OF ANY CONFLICTS
WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY ARCHITECT AND VA COR IN WRITING PRIOR TO BIDDING IF OTHER
UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER
AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GC IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES,
AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY
THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM VA COR BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
12. ALL LOUD WORK SHALL BE COORDINATED WITH GENERAL CONTRACTOR TO AVOID ANY
NOISE RESTRICTION TIME SLOTS.
MECHANICAL SEQUENCING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF SEQUENCING.
REFER TO ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND SCHEDULES FOR
CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT
THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY
DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF
THE SEQUENCING CRITERIA.
2. REVIEW PROJECT SEQUENCING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES,
ETC. WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PORTIONS OF THE PROJECT.
5. SEQUENCE DEMOLITION WORK TO MINIMIZE DOWNTIME.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE BASIS OF
DESIGN.
3. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
4. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH
2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
5. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE
SPRINKLERS IN UNPARTITIONED SPACES.
6. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.
7. PROVIDE COVERAGE ABOVE AND BELOW FLOATING CEILINGS. REFER TO ARCHITECTURAL
PLANS.
8. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.
9. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE
WITH NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS,
INCLUDING RECORD DOCUMENTATION, TESTING AND INSPECTION.
10. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.
FIRE PROTECTION GENERAL NOTES:
TEST DATE:
RESIDUAL HYDRANT #:
HYDRANT ELEVATION:
LOCATION:
STATIC PRESSURE:
RESIDUAL PRESSURE:
FLOW HYDRANT #:
HYDRANT ELEVATION:
LOCATION:
STATIC PRESSURE:
TOTAL FLOW:
SIZE OF MAIN:
FIRE HYDRANT FLOW TEST DATA
9/25/2018
INFORMATION PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL PERFORM FLOW TEST
PRIOR TO FINAL HYDRAULLIC CALCULATIONS.
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS
WERE ACQUIRED FROM THE ARCHITECTURAL PLANS.
FIRE / SMOKE BARRIER DESIGNATIONS
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
1-HOUR FIRE/SMOKE BARRIER
2-HOUR FIRE/SMOKE BARRIER
FIRE PROTECTION SHEET INDEX
F000 FIRE PROTECTION - COVERSHEET
FD100 FIRE PROTECTION - DEMOLITION PLAN - BASEMENT
FD101 FIRE PROTECTION - DEMOLITION PLAN - FIRST FLOOR
F100 FIRE PROTECTION - PLAN - BASEMENT
F101 FIRE PROTECTION - PLAN - FIRST FLOOR
GRAND TOTAL: 5
REFERENCE SCALE IN INCHES
0 1 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
F000
FIRE PROTECTION -
COVERSHEET
NKJ TGE
10/28/2022
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
NOTES:
1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.
2. ALL SPRINKLERS SHALL BE UL AND FM LISTED.
3. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13
REQUIREMENTS.
4. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.
CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.
5. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.
6. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE
SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.
FIRE SPRINKLER USAGE SCHEDULE
AREA TYPE
(NOTE 1 & 5)
SPRINKLER
TEMPERATURE
RATING MANUFACTURER & MODEL NOTES
TAG NAME
(NOTE 4) SPRINKLER TYPE
RESPONSE
CATEGORY FINISH
SPR-2 UPRIGHT QUICK ROUGH
BRASS
PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2
AREAS WITH FINISHED CEILINGS SPR-3 RECESSED PENDENT QUICK CHROME
PLATED
PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2
SIDEWALL APPLICATIONS SPR-5 SIDEWALL QUICK CHROME
PLATED
PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:10/28/2022
Robert Douglas Lowe
24706
DIETETIC
STORAGE
ELECTRICAL
21A
MECHANICAL
21 MECHANICAL
UNIFINISHED SPACE
HAC
SPS ADMIN/
VENDOR DROP
SPS
CHIEF
OFFICE
26A
CORRIDOR
CON
CORRIDOR
C0S
STAIR
UNFINISHED
SPACE
19B
STORAGE
REFRIGERATION
EQUIPMENT
23A
ELEV
E01
HAC
CRAWL
SPACE
SERVICE TUNNEL
DIRTY
ANTE
LOCKER ROOM
STAIR
LOKER ROOM
WOMEN'S DECON
LOCKER ROOM
5A
MEN'S DECON
LOCKER ROOM
4A
EXISTING
ELEVATOR
EQUIPMENT
ROOM
DIRTY
LOBBY
DIRTY ELEVATOR
STORAGE
STAFF LOUNGE
CLEAN ALCOVE
DIRTY
ALCOVE
DIRTY
CORRIDOR
HAC
50 SOAP
DISPENSER
SYSTEM CLOSET
RO
SYSTEM
STORAGE
CLEAN
ANTE
DECON
WOKR AREA
LOW VOLTAGE
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
C
D
D.3 D.5 E.5 E.9 F.5
G
G.5 G.9 H.5 J.4 J.9 L.1
1.9
2.9
3.9
4.9
5.9
6.9
H J K LE FC.5
3.3 3.3
4.3 4.3
4" FP INSTALLED IN
ELEVATOR PROJECT
REFERENCE SCALE IN INCHES
0 1 2
NORTH
NTS
BUILDING 4KEY PLAN
AREA OF
WORK
ZONE 1
ZONE 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
FD100
FIRE PROTECTION - DEMOLITION
PLAN - BASEMENT
NKJ TGE
10/28/2022
N O R
HT
1/8" = 1'-0"
FIRE PROTECTION - DEMOLITION PLAN - BASEMENT
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
NOTE:
NO DEMOLITION WORK IN THIS AREA.
SHOWN FOR REFERENCE PURPOSES ONLY.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:10/28/2022
C1W
131A 131B
105A
C1N
101A101
100B
103 104
111CC1E
E01
109107
120A 120B 120C 120D 120E 120F 120G
120H C1E
120I120J120K120L120N
120M
C1M
1A
100A
105B
UCF
C
D
D.3 D.5 E.5 E.9 F.5
G
G.5 G.9 H.5 J.4 J.9 L.1
1.9
2.9
3.9
4.9
5.9
6.9
H J K LE FC.5
3.3 3.3
4.3 4.3
1 1
AREA OF FIRE
PROTECTION
DEMOLITION
AREA OF FIRE
PROTECTION
DEMOLITION
EXISTING MAIN
SPRINKLER (TYP)
REFERENCE SCALE IN INCHES
0 1 2
NORTH
NTS
BUILDING 4KEY PLAN
AREA OF
WORK
ZONE 1
ZONE 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
FD101
FIRE PROTECTION - DEMOLITION
PLAN - FIRST FLOOR
NKJ TGE
10/28/2022
N O R
HT
1/8" = 1'-0"
FIRE PROTECTION - DEMOLITION PLAN - FIRST FLOOR
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
KEYNOTES:
1. REMOVE SPRINKLERS AND PIPING. CAP PIPING
AT MAIN. PROVIDE FIRE WATCH PER NFPA FOR
OCCUPIED AREAS SERVED BY SPRINKLER
SYSTEMS DURING REQUIRED SHUT-DOWNS.
SHEET NOTES:
1. WITHIN THE AREA OF FIRE PROTECTION
DEMOLITION REMOVE ALL SPRINKLER HEADS,
BRANCH LINES, HANGERS, ETC. CAP PIPING
AT MAINS.
2. AREAS OUTSIDE THE DEFINED AREA OF FIRE
PROTECTION DEMOLITION ARE OUTSIDE THE
PRIMARY SCOPE OF WORK BUT MAY HAVE
INCEDENTAL RELATED WORK PASSING
THROUGH OR AT THE BOUNDARY.
3. AREAS OUTSIDE THE AREA OF FIRE
PROTECTION DEMOLITION ARE OCCUPIED AND
SPRINKLER SYSTEMS SHALL REMAIN
OPERATIONAL THROUGHOUT CONSTRUCTION.
ANY SHUT-DOWNS SHALL BE COORDINATED
WITH COR. CONTRACTOR SHALL BE
RESPONSIBLE FOR FIRE WATCH DURING ANY
SHUT-DOWNS.
REMOVE EXISTING 4" PIPE END CAPS AND
PREPARE FOR NEW CONNECTION.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:10/28/2022
CORRIDOR
ELECTRICAL
21A
MECHANICAL
21 MECHANICAL
UNIFINISHED SPACE
HAC
SPS ADMIN/
VENDOR DROP
SPS
CHIEF
OFFICE
26A
CORRIDOR
CON
CORRIDOR
C0S
STAIR
UNFINISHED
SPACE
19B
STORAGE
REFRIGERATION
EQUIPMENT
23A
ELEV
E01
HAC
CRAWL
SPACE
SERVICE TUNNEL
DIRTY
ANTE
LOCKER ROOM
STAIR
LOKER ROOM
WOMEN'S DECON
LOCKER ROOM
5A
MEN'S DECON
LOCKER ROOM
4A
EXISTING
ELEVATOR
EQUIPMENT
ROOM
DIRTY
LOBBY
DIRTY ELEVATOR
STORAGE
STAFF LOUNGE
CLEAN ALCOVE
DIRTY
ALCOVE
DIRTY
CORRIDOR
HAC
50 SOAP
DISPENSER
SYSTEM CLOSET
RO
SYSTEM
STORAGE
CLEAN
ANTE
DECON
WOKR AREA
LOW VOLTAGE
MECHANICAL
ALCOVE
25A
CORRIDOR
19A
STORAGE
25B
LOW VOLTAGE
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
R
R
R
R
R
R R
R
R
CW1
HW1
R
R
R
R
R
R R
R
R
C
D
D.3 D.5 E.5 E.9 F.5
G
G.5 G.9 H.5 J.4 J.9 L.1
1.9
2.9
3.9
4.9
5.9
6.9
H J K LE FC.5
3.3 3.3
4.3 4.3
OH1
FP
BOUNDARY OF FIRE
PROTECTION WORK
4" FP INSTALLED IN
PRIOR PROJECTS
REMOVE 4" CAP AND
EXTEND TO
BASEMENT AREA OF
PACT PROJECT.
REFERENCE SCALE IN INCHES
0 1 2
NORTH
NTS
BUILDING 4KEY PLAN
AREA OF
WORK
ZONE 1
ZONE 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
F100
FIRE PROTECTION - PLAN -
BASEMENT
NKJ TGE
10/28/2022
N O R
HT
1/8" = 1'-0"
FIRE PROTECTION - PLAN - BASEMENT
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
KEYNOTES:
1. EXISTING 4" FP MAIN INSTALLED IN ELEVATOR PROJECT. RISER AND ZONE VALVE LOCATED IN
MECHANICAL ROOM 13.
SHEET NOTES:
1. WITHIN THE AREA OF FIRE PROTECTION WORK, PROVIDE A COMPLETE FIRE
SPRINKLER INSTALLATION SUCH THAT THE AREA WILL BE CONSIDERED SPRINKLERED
THROUGHOUT IN ACCORDANCE WITH THE MINNESOTA FIRE CODE.
2. PIPE ROUTING WHICH RESULTS IN PIPING BELOW FINISHED CEILINGS IN FINISHED AREAS MUST
RECEIVE APPROVAL BY THE ARCHITECT PRIOR TO INSTALLATION.
3. USE OF NON SPECIFIED SPRINKLERS MUST RECEIVE APPROVAL BY ENGINEER PRIOR TO
INSTALLATION.
4. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONDITIONS, DETERMINE
HYDRAULICALLY REMOTE AREAS, OBTAIN FLOW TEST DATA, AND SUBMIT HYDRAULIC
CALCULATIONS TO ALL AUTHORITIES HAVING JURISDICTION. SEE SPECIFICATIONS FOR SPECIFIC
HYDRAULIC CALCULATION REQUIREMENTS.
5. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORE DRILLING, CUTTING, PATCH AND REPAIR OF ALL SURFACES NECESSARY FOR THE INSTALLATION OF ITEMS INSTALLED AS PART
OF THE DIVISION 21 CONTRACT. PATCH AND REPAIR TO MATCH SURROUNDING SURFACE.
6. SPRINKLER HEAD AND PIPING LAYOUT SHALL BE DETERMINED BY DIVISION 21 CONTRACTOR.
DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL PIPE ROUTING WITH
OTHER TRADES AND BUILDING CONFIGURATION.
7. REFER TO ARCHITECTURAL DRAWINGS FOR CURRENT REFLECTED CEILING PLAN INFORMATION.
8. AREAS OUTSIDE THE AREA OF FIRE PROTECTION WORK ARE OCCUPIED AND SPRINKLER SYSTEMS
SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. ANY SHUT-DOWNS SHALL BE
COORDINATED WITH COR. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE WATCH DURING ANY
SHUT-DOWNS.
9. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.
10. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE WITH
NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS, INCLUDING RECORD
DOCUMENTATION, TESTING AND INSPECTION.
11. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:10/28/2022
ELECTRICAL
130C
LOW
VOLTAGE
130B
TOILET
TEAM
WORK AREA
132EXAM 1
EXAM 2
EXAM 3
EXAM 4
PCMHI
EXAM 5
CLEAN STORAGE
STORAGE
132A
EXAM 11
EXAM 10
EXAM 9
EXAM 8
EXAM 7
MEDICATION
EXAM 6
EXAM 12
TOILET
EXAM 13
EXAM 14
SPS
PROCEDURE
TOILET
HAC
SOILED
HOLDING
TEAM
WORK AREA
CLEAN
STORAGE
158A
WAITING
RECEPTION
159A
SELF
CHECK-IN
159B
SCALE
ALCOVE
159C
SCALE
ALCOVE
159D
CORRIDOR
C1E
STORAGE
130ACORRIDOR
C1
CORRIDOR
C2
CORRIDOR
C3
TOILET
SCALE
ALCOVE
159C
HAC
HAC
121A
STORAGE
EXAM 3
TOILET
164A
EXAM 4
TOILET
165A
CLEAN
MED. STO.
LOADING DOCK
CORRIDOR
STORAGE
100B
ELECTRICAL
100A
FRIDGE
131A
FRIDGE
131B
CORRIDOR
C1E
STAIR
ELEV
E01
HAC
LOBBY
120N
ELEV
E03
STAIR
TR
123C
UCF
C
D
D.3 D.5 E.5 E.9 F.5
G
G.5 G.9 H.5 J.4 J.9 L.1
1.9
2.9
3.9
4.9
5.9
6.9
H J K LE FC.5
3.3 3.3
4.3 4.3
OH2 OH2 OH2
OH2
OH2
OH2
OH1
OH2
OH2
OH2
OH2
AREA OF FIRE
PROTECTION WORK
AREA OF FIRE
PROTECTION WORK
FP
OH2
OH1
OH1
OH1
4" EXISTING FP
REFERENCE SCALE IN INCHES
0 1 2
NORTH
NTS
BUILDING 4KEY PLAN
AREA OF
WORK
ZONE 1
ZONE 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
F101
FIRE PROTECTION - PLAN - FIRST
FLOOR
NKJ TGE
10/28/2022
N O R
HT
1/8" = 1'-0"
FIRE PROTECTION - PLAN - FIRST FLOOR
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
KEYNOTES:
1. EXISTING FIRE PROTECTION MAIN UP FROM BASEMENT.
2. EXTEND EXISTING ZONE PIPING TO PROVIDE SPRINKLER COVERAGE FOR PACT.
SHEET NOTES:
1. WITHIN THE AREA OF FIRE PROTECTION WORK, PROVIDE A COMPLETE FIRE
SPRINKLER INSTALLATION SUCH THAT THE AREA WILL BE CONSIDERED SPRINKLERED
THROUGHOUT IN ACCORDANCE WITH THE MINNESOTA FIRE CODE.
2. PIPE ROUTING WHICH RESULTS IN PIPING BELOW FINISHED CEILINGS IN FINISHED AREAS MUST
RECEIVE APPROVAL BY THE ARCHITECT PRIOR TO INSTALLATION.
3. USE OF NON SPECIFIED SPRINKLERS MUST RECEIVE APPROVAL BY ENGINEER PRIOR TO
INSTALLATION.
4. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONDITIONS, DETERMINE
HYDRAULICALLY REMOTE AREAS, OBTAIN FLOW TEST DATA, AND SUBMIT HYDRAULIC
CALCULATIONS TO ALL AUTHORITIES HAVING JURISDICTION. SEE SPECIFICATIONS FOR SPECIFIC
HYDRAULIC CALCULATION REQUIREMENTS.
5. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORE DRILLING, CUTTING, PATCH AND REPAIR OF ALL SURFACES NECESSARY FOR THE INSTALLATION OF ITEMS INSTALLED AS PART
OF THE DIVISION 21 CONTRACT. PATCH AND REPAIR TO MATCH SURROUNDING SURFACE.
6. SPRINKLER HEAD AND PIPING LAYOUT SHALL BE DETERMINED BY DIVISION 21 CONTRACTOR.
DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL PIPE ROUTING WITH
OTHER TRADES AND BUILDING CONFIGURATION.
7. REFER TO ARCHITECTURAL DRAWINGS FOR CURRENT REFLECTED CEILING PLAN INFORMATION.
8. AREAS OUTSIDE THE AREA OF FIRE PROTECTION WORK ARE OCCUPIED AND SPRINKLER SYSTEMS
SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. ANY SHUT-DOWNS SHALL BE
COORDINATED WITH COR. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE WATCH DURING ANY
SHUT-DOWNS.
9. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.
10. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE WITH
NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS, INCLUDING RECORD
DOCUMENTATION, TESTING AND INSPECTION.
11. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name:
Date: License Number:10/28/2022
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)FD
PITCH PIPE IN DIRECTION
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
DIELECTRIC CONNECTION
UNION/FLANGE
THERMOSTATIC BALANCING VALVE
CHECK VALVE
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METERM
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
NEW CONNECTION
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
ACID VENTAV
ACID WASTEAW
COLD WATER - POTABLECW
DT DRAIN TILE
SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
HOT WATER - POTABLE NUMBER INDICATES TEMPHW140
HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140
NON-POTABLE COLD WATERNCW
NON-POTABLE HOT WATERNHW
PUMPED DISCHARGEPD
SANITARY DRAINAGESAN
SOFT COLD WATERSCW
SOFT HOT WATERSHW
STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)
STS STORM DRAINAGE (SECONDARY)
VENTV
WASTE ANETHESIA GAS DISPOSALWAGD
GREASE VENTGV
COMPRESSED AIRCA
DEIONIZED WATERDI
PROPANE GASP
REVERSE OSMOSIS WATERRO
STW SOFT TEMPERED WATER
TW TEMPERED WATER
DRAIND
G NATURAL GAS
NOT ALL SYMBOLS MAY APPLY.
PRESSURE REDUCING VALVE (LIQUID/GAS)
OIL RETURNOR
OIL SUPPLYOS
LAB VACUUMVAC
SOLENOID VALVE
SAFETY/RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
PUMP
GRV GAS REGULATOR VENT
INSTRUMENT AIRIA
MEDICAL AIRMA
MEDICAL VACUUMMV
NITROGENN
NITROUS OXIDENO
OXYGENO
PURE WATERPW
SERVICE WATER - POTABLEW
PIPE CONTINUATION
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
ROUTE TO DRAIN
PLUMBING ABBREVIATION KEY
BATHTUBBT
CO CLEANOUT
CLINICAL SINKCS
DRINKING FOUNTAINDF
EMERGENCY EYEWASHEE
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FLOOR SINKFS
GARBAGE DISPOSERGD
GREASE INTERCEPTORGI
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
LAVATORYLAV
MOP BASINMB
MH MANHOLE
MIXING VALVEMV
NEUTRALIZATION TANKNT
OIL SEPARATOROS
ROOF DRAINRD
SHOWERSH
SINKSK
SERVICE SINKSS
TRENCH DRAINTD
TRAP PRIMERTP
URINALUR
WATER CLOSETWC
WALL CLEANOUTWCO
WASH FOUNTAINWF
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
YARD CLEANOUTYCO
EMERGENCY SHOWERES
EMERGENCY SHOWER/EYEWASHESE
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
NC NEW CONNECTION
NOT IN CONTRACTNIC
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS NOTED OTHERWISEUNO
EXISTINGE
FLOW METERFM
WATER SOFTENERWS
WATER METERWM
DIALYSIS BOXDB
CATCH BASINCB
CAST IRONCI
DUCTILE IRONDI
UTILITY BOXUB
BELOW FINISHED FLOORBFF
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
T101
SIM
DETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
NEW WORK BY THIS CONTRACTOR
(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR
(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN
(LIGHT SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK SHORT DASHED LINE)
LINE TYPE KEY:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
NURSE CALL CONTRACTORN.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
FOOD SERVICE CONTRACTORF.S.C.
MECHANICAL SEQUENCING NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF SEQUENCING.
REFER TO ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND SCHEDULES FOR
CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT
THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY
DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF
THE SEQUENCING CRITERIA.
2. REVIEW PROJECT SEQUENCING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES,
ETC. WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PORTIONS OF THE PROJECT.
5. SEQUENCE DEMOLITION WORK TO MINIMIZE DOWNTIME.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO THE VA.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM NON-STRUCTURAL BUILDING
ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE
APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
18. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSERS, RETURN, AND EXHAUST
GRILLES. ALL DAMPERS ARE NOT SHOWN ON PLANS.
19. CONTRACTOR SHALL REPAIR AND/ OR REPLACE ALL INSULATION AT EXISTING SHEET METAL
DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES AND SHALL
REPAIR OR REPLACE ANY INSULATION AT NEW AND OLD DUCT CONNECTIONS AND ANY
MISSING OR DAMAGED INSULATION ON REUSED OR EXISTING DUCTWORK.
20. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS
LOCATED ABOVE THE CEILING THAT REQUIRE OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND/ OR CALIBRATION.
ENGINEERING DISCIPLINE REFERENCE NOTES
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER
REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED
WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A
DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE
TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED
AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE
BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL
DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS
TO BE FOLLOWED.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM LIMITED
FIELD OBSERVATIONS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING
CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ARCHITECT AND VA COR IN WRITING OF ANY CONFLICTS
WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY ARCHITECT AND VA COR IN WRITING PRIOR TO BIDDING IF OTHER
UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER
AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GC IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES,
AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY
THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM VA COR BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
12. ALL LOUD WORK SHALL BE COORDINATED WITH GENERAL CONTRACTOR TO AVOID ANY
NOISE RESTRICTION TIME SLOTS.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
ALL ELEVATIONS BEFORE BEGINNING WORK.
6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR
ADDITIONAL DEMOLITION INFORMATION.
10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL
INFORMATION.
PLUMBING GENERAL NOTES:
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS
WERE ACQUIRED FROM THE ARCHITECTURAL PLANS.
FIRE / SMOKE BARRIER DESIGNATIONS
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
1-HOUR FIRE/SMOKE BARRIER
2-HOUR FIRE/SMOKE BARRIER
PLUMBING SHEET INDEX
P000 PLUMBING - COVERSHEET
PDU100 PLUMBING - DEMOLITION PLAN - BASEMENT UNDERFLOOR
PD100 PLUMBING - DEMOLITION PLAN - BASEMENT
PD101 PLUMBING - DEMOLITION PLAN - FIRST FLOOR
PD102 PLUMBING - DEMOLITION PLAN - LOWER ROOF
PU100 PLUMBING - PLAN - BASEMENT UNDERFLOOR
P100 PLUMBING - PLAN - BASEMENT
P101 PLUMBING - PLAN - FIRST FLOOR
P102 PLUMBING - PLAN - LOWER ROOF
P300 PLUMBING - DETAILS
P400 PLUMBING - WATER RISER DIAGRAM
P401 PLUMBING - WASTE AND VENT RISER DIAGRAM
P500 PLUMBING - SCHEDULES AND MATERIAL LIST
GRAND TOTAL: 13
REFERENCE SCALE IN INCHES
0 1 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
P000
PLUMBING - COVERSHEET
NKJ TGE
10/28/2022
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
NOTES: 1) SANITARY RISER UP IN WALL TO FIXTURE SHALL BE A MINUMUM OF 2". 2) 1/2" CW AND HW APPLIES ONLY TO THE FINAL VERTICAL RISE-DROP TO EACH FIXTURE, BRANCH PIPING TO VERTICAL RISE-DROP SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE. 3) SIZES SHOWN ARE MINIMUMS. SIZES SHOWN ON THE DRAWING THAT ARE LARGER THAN THE SIZES LISTED IN THE
SCHEDULE SHALL DICTATE THE ROUGH-IN SIZE.
PLUMBING FIXTURE ROUGH-IN SCHEDULE
TAG NAME
DOMESTIC
CW
(NOTE 3)
DOMESTIC
HW
(NOTE 3)
SANITARY
(NOTE 3)
VENT
(NOTE 3) REMARKS
CS-1 1" 3/4" 4" 2" -
EWC-1 1/2" - 1 1/4" 1 1/4"
FD-2 - 2 1 1/2"
FD-4 - 4" 2"
LAV-1 1/2" 1/2" 1 1/4" 1 1/4"
MB-1 3/4" 3/4" 3" 1 1/2"
MB-2 3/4" 3/4" 3" 1 1/2"
SK-1 1/2" 1/2" 1 1/2" 1 1/4"
WC-1 1 1/2" - 4" 2"
WC-2 1 1/2" - 4" 2"
ELECTRICAL
21A
MECHANICAL
21 MECHANICAL
UNIFINISHED SPACE
HAC
SPS ADMIN/
VENDOR DROP
SPS
CHIEF
OFFICE
26A
CORRIDOR
CON
CORRIDOR
C0S
STAIR
UNFINISHED
SPACE
19B
STORAGE
REFRIGERATION
EQUIPMENT
23A
ELEV
E01
HAC
CRAWL
SPACE
SERVICE TUNNEL
DIRTY
ANTE
LOCKER ROOM
STAIR
LOKER ROOM
WOMEN'S DECON
LOCKER ROOM
5A
MEN'S DECON
LOCKER ROOM
4A
EXISTING
ELEVATOR
EQUIPMENT
ROOM
DIRTY
LOBBY
DIRTY ELEVATOR
STORAGE
STAFF LOUNGE
CLEAN ALCOVE
DIRTY
ALCOVE
DIRTY
CORRIDOR
HAC
50 SOAP
DISPENSER
SYSTEM CLOSET
RO
SYSTEM
STORAGE
CLEAN
ANTE
DECON
WOKR AREA
LOW VOLTAGE
C
D
D.3 D.5 E.5 E.9 F.5
G
G.5 G.9 H.5 J.4 J.9 L.1
1.9
2.9
3.9
4.9
5.9
6.9
H J K LE FC.5
3.3 3.3
4.3 4.3
COURTYARD
6"ST
SAN
S A
N
SAN
E X
IS
T
IN
G
EXISTING
EXISTING
ST
EXISTING
5 5
ST
3" FD
FD
3"FD
INV. EL. 1039.9"
4" C.I. SAN. SEWER
"S
A N
"S
A N
3"SAN
3"SAN
3"SAN
3"SAN
4"
SAN
SAN UP
TO 1ST
REFERENCE SCALE IN INCHES
0 1 2
NORTH
NTS
BUILDING 4KEY PLAN
AREA OF
WORK
ZONE 1
ZONE 2
10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS
656-400
CONSTRUCT PACT CLINIC
BUILDING 4 FIRST FLOOR
ARCHITECT/ENGINEER OF RECORD
ST. CLOUD VAHCS
ST. CLOUD, MN 56303
ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22
No DATEREVISION
DRAWING TITLE
APPROVED: CHIEF OF STAFF
APPROVED: HEALTH CARE SYSTEM DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS PROJECT MANAGER
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
CHECKED BYBUILDING No
LOCATION
DATE:
DATE:
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
APPROVED: PROJECT COR DATE:
DATE:
PDU100
PLUMBING - DEMOLITION PLAN -
BASEMENT UNDERFLOOR
NKJ TGE
10/28/2022
N O R
HT
1/8" = 1'-0"
PLUMBING - DEMOLITION PLAN - BASEMENT UNDERFLOOR
3001 BROADWAY
STREET NE, SUITE 601
MINNEAPOLIS, MN
55413
PH: 612.540.5000
www.imegcorp.com
KEYNOTES:
1. REMOVE CATCH BASIN AND RELATED PIPING.
REMOVE DOWNSPOUT PIPING UP TO CHANGE
IN MATERIAL.
2. APPROXIMATE LOCATION OF GREASE TRAP.
REMOVE GREASE TRAP.
3. REMOVE AREA DRAIN AND PIPING. CAP PIPING
AT MAIN.
4. APPROXIMATE LOCATION OF EXISTING
MANHOLE
5. REMOVE 4"ST DOWNSPOUT PIPING UP AND
WHERE CHANGE IN PIPE MATERIAL.
6. REMOVE 6"ST BACK TO THIS POINT…
This is the start of the file's text. The full file is on GovTribe.