Attachment 6 - Drawings - PACT B4 - Part 4.pdf

PDF 12 MB Posted

Attached to
Y1DA--656-400 Construct PACT B4 Minor Construction - St. Cloud, MN Federal contract opportunity
Solicitation number
36C77624B0021
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document is Attachment 6 - Drawings - PACT B4 - Part 4.pdf, which provides technical drawings related to the federal contract opportunity 36C77624B0021 for the construction of PACT B4 Minor Construction in St. Cloud, MN. The contract is being solicited by the Department of Veterans Affairs Technology Acquisition Center Austin. The drawings cover various architectural, structural, mechanical, electrical, and plumbing specifications for the construction project. This attachment provides detailed technical information to support the requirements outlined in the overall solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--656-400 Construct PACT B4 Minor Construction - St. Cloud, MN, newest first.
File Type Posted
36C77624B0021 0002.pdf PDF
Technical Questions - PACT B4.pdf PDF
36C77624B0021 0001.docx DOCX document
S06-Site Visit Sign-in PACT B4 - 0001.pdf PDF
Attachment 12 - Site Visit Map.pdf PDF
Attachment 9 - Brand Name JandA - St Cloud.pdf PDF
Attachment 3 - Drawings - PACT B4 - Part 1.pdf PDF
Attachment 2 - Specifications - PACT B4 - Vol 02.pdf PDF
Attachment 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 10 - Wage Rates - Stearns County 7.9.pdf PDF
Attachment 7 - Asbestos and Lead Report.pdf PDF
Attachment 1 - Specifications - PACT B4 - Vol 01.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 5 - Drawings - PACT B4 - Part 3.pdf PDF
Attachment 4 - Drawings - PACT B4 - Part 2.pdf PDF
36C77624B0021_1.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UCF

656-400

10/28/22CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

KEY PLAN

10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS

10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

1-HOUR FIRE/SMOKE BARRIER

2-HOUR FIRE/SMOKE BARRIER

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

(EXISTING)

1-HOUR FIRE/SMOKE BARRIER (EXISTING)

2-HOUR FIRE/SMOKE BARRIER (EXISTING)

LCDA

DENOTES 5'-0" WHEELCHAIR TURNING RADIUS

CLEARANCE.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:

Dennis Mika

10/28/2022

10/28/22CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

KEY PLAN

10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS

ZONE 1

ZONE 2

10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

1-HOUR FIRE/SMOKE BARRIER

2-HOUR FIRE/SMOKE BARRIER

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

(EXISTING)

1-HOUR FIRE/SMOKE BARRIER (EXISTING)

2-HOUR FIRE/SMOKE BARRIER (EXISTING)

LCDA

DENOTES 5'-0" WHEELCHAIR TURNING

RADIUS CLEARANCE.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:

UCF

10/28/22CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

KEY PLAN

10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS

ZONE 1

ZONE 2

10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

1-HOUR FIRE/SMOKE BARRIER

2-HOUR FIRE/SMOKE BARRIER

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

(EXISTING)

1-HOUR FIRE/SMOKE BARRIER (EXISTING)

2-HOUR FIRE/SMOKE BARRIER (EXISTING)

LCDA

DENOTES 5'-0" WHEELCHAIR TURNING

RADIUS CLEARANCE.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:

10/28/22CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

10/28/2022 - ISSUE FOR 100 % CONSTRUCTION DOCUMENTS

10/28/22ISSUE FOR 100% CONSTRUCTION DOCUMENTS

LCDA

X

JMcAllister Snapshot

FIRE PROTECTION SYMBOL LIST

SYMBOL: DESCRIPTION:

FIRE PROTECTIONFP

FIRE PROTECTION - DRY SYSTEMFPD

SERVICE WATER - POTABLEW

AIR PRESSURE MAINTENANCE DEVICE

AIR SUPERVISORY SWITCH

ANGLE VALVE

BUTTERFLY VALVE WITH MONITOR SWITCH

OS&Y GATE VALVE

OS&Y GATE VALVE WITH MONITOR SWITCH

PRESSURE SWITCH

P

NO SYMBOL LIGHT HAZARD

ORDINARY GROUP 1

ORDINARY GROUP 2

INSPECTOR TEST AND DRAIN VALVE

MONITOR SWITCH

COMPRESSED AIR - FIRE PROTECTIONCAF

PIPE CAP

PIPE DOWN

NEW CONNECTION

PIPE UP OR UP/DOWN

SHUTOFF VALVE NORMALLY OPEN

DRAINDFP

NOT ALL SYMBOLS MAY APPLY.

AUTOMATIC DRAIN VALVE

UNION/FLANGE

DIRECTION OF FLOW IN PIPE

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

CHECK VALVE

FLOW SWITCH

F

ROUTE TO DRAIN

AREA BOUNDARY

OH1

OH2

FIRE PROTECTION ABBREVIATION KEY

AD ACCESS DOOR

BFP BACKFLOW PREVENTER

N.C. NORMALLY CLOSED

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

I.E. INVERT ELEVATION

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

NURSE CALL CONTRACTORN.C.C.

CIVIL CONTRACTORC.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FOOD SERVICE CONTRACTORF.S.C.

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO THE VA.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM NON-STRUCTURAL BUILDING

ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE

APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

18. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSERS, RETURN, AND EXHAUST

GRILLES. ALL DAMPERS ARE NOT SHOWN ON PLANS.

19. CONTRACTOR SHALL REPAIR AND/ OR REPLACE ALL INSULATION AT EXISTING SHEET METAL

DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES AND SHALL

REPAIR OR REPLACE ANY INSULATION AT NEW AND OLD DUCT CONNECTIONS AND ANY

MISSING OR DAMAGED INSULATION ON REUSED OR EXISTING DUCTWORK.

20. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS

LOCATED ABOVE THE CEILING THAT REQUIRE OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND/ OR CALIBRATION.

ENGINEERING DISCIPLINE REFERENCE NOTES

GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER

REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED

WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A

DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.

EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE

TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED

AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE

BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL

DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS

TO BE FOLLOWED.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM LIMITED

FIELD OBSERVATIONS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING

CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ARCHITECT AND VA COR IN WRITING OF ANY CONFLICTS

WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY ARCHITECT AND VA COR IN WRITING PRIOR TO BIDDING IF OTHER

UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER

AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GC IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES,

AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY

THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM VA COR BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

12. ALL LOUD WORK SHALL BE COORDINATED WITH GENERAL CONTRACTOR TO AVOID ANY

NOISE RESTRICTION TIME SLOTS.

MECHANICAL SEQUENCING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF SEQUENCING.

REFER TO ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND SCHEDULES FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE SEQUENCING CRITERIA.

2. REVIEW PROJECT SEQUENCING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES,

ETC. WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PORTIONS OF THE PROJECT.

5. SEQUENCE DEMOLITION WORK TO MINIMIZE DOWNTIME.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE BASIS OF

DESIGN.

3. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

4. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH

2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

5. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE

SPRINKLERS IN UNPARTITIONED SPACES.

6. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.

7. PROVIDE COVERAGE ABOVE AND BELOW FLOATING CEILINGS. REFER TO ARCHITECTURAL

PLANS.

8. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

9. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE

WITH NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS,

INCLUDING RECORD DOCUMENTATION, TESTING AND INSPECTION.

10. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.

FIRE PROTECTION GENERAL NOTES:

TEST DATE:

RESIDUAL HYDRANT #:

HYDRANT ELEVATION:

LOCATION:

STATIC PRESSURE:

RESIDUAL PRESSURE:

FLOW HYDRANT #:

HYDRANT ELEVATION:

LOCATION:

STATIC PRESSURE:

TOTAL FLOW:

SIZE OF MAIN:

FIRE HYDRANT FLOW TEST DATA

9/25/2018

INFORMATION PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL PERFORM FLOW TEST

PRIOR TO FINAL HYDRAULLIC CALCULATIONS.

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS

WERE ACQUIRED FROM THE ARCHITECTURAL PLANS.

FIRE / SMOKE BARRIER DESIGNATIONS

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

1-HOUR FIRE/SMOKE BARRIER

2-HOUR FIRE/SMOKE BARRIER

FIRE PROTECTION SHEET INDEX

F000 FIRE PROTECTION - COVERSHEET

FD100 FIRE PROTECTION - DEMOLITION PLAN - BASEMENT

FD101 FIRE PROTECTION - DEMOLITION PLAN - FIRST FLOOR

F100 FIRE PROTECTION - PLAN - BASEMENT

F101 FIRE PROTECTION - PLAN - FIRST FLOOR

GRAND TOTAL: 5

REFERENCE SCALE IN INCHES

0 1 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

F000

FIRE PROTECTION -

COVERSHEET

NKJ TGE

10/28/2022

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

NOTES:

1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS.

2. ALL SPRINKLERS SHALL BE UL AND FM LISTED.

3. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION, USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13

REQUIREMENTS.

4. TAG NAME IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS.

CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED.

5. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES.

6. SPRINKLERS SPECIFIED WITHIN FIRE SPRINKLER USAGE SCHEDULE ARE STANDARD COVERAGE TYPE. EXTENDED COVERAGE

SPRINKLERS ARE PERMITTED PROVIDED SPRINKLERS MEET THE REQUIREMENTS OF UL AND FM.

FIRE SPRINKLER USAGE SCHEDULE

AREA TYPE

(NOTE 1 & 5)

SPRINKLER

TEMPERATURE

RATING MANUFACTURER & MODEL NOTES

TAG NAME

(NOTE 4) SPRINKLER TYPE

RESPONSE

CATEGORY FINISH

SPR-2 UPRIGHT QUICK ROUGH

BRASS

PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2

AREAS WITH FINISHED CEILINGS SPR-3 RECESSED PENDENT QUICK CHROME

PLATED

PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2

SIDEWALL APPLICATIONS SPR-5 SIDEWALL QUICK CHROME

PLATED

PER NFPA VIKING VK OR APPROVED EQUAL NOTE 2

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:10/28/2022

Robert Douglas Lowe

24706

DIETETIC

STORAGE

ELECTRICAL

21A

MECHANICAL

21 MECHANICAL

UNIFINISHED SPACE

HAC

SPS ADMIN/

VENDOR DROP

SPS

CHIEF

OFFICE

26A

CORRIDOR

CON

CORRIDOR

C0S

STAIR

UNFINISHED

SPACE

19B

STORAGE

REFRIGERATION

EQUIPMENT

23A

ELEV

E01

HAC

CRAWL

SPACE

SERVICE TUNNEL

DIRTY

ANTE

LOCKER ROOM

STAIR

LOKER ROOM

WOMEN'S DECON

LOCKER ROOM

5A

MEN'S DECON

LOCKER ROOM

4A

EXISTING

ELEVATOR

EQUIPMENT

ROOM

DIRTY

LOBBY

DIRTY ELEVATOR

STORAGE

STAFF LOUNGE

CLEAN ALCOVE

DIRTY

ALCOVE

DIRTY

CORRIDOR

HAC

50 SOAP

DISPENSER

SYSTEM CLOSET

RO

SYSTEM

STORAGE

CLEAN

ANTE

DECON

WOKR AREA

LOW VOLTAGE

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

C

D

D.3 D.5 E.5 E.9 F.5

G

G.5 G.9 H.5 J.4 J.9 L.1

1.9

2.9

3.9

4.9

5.9

6.9

H J K LE FC.5

3.3 3.3

4.3 4.3

4" FP INSTALLED IN

ELEVATOR PROJECT

REFERENCE SCALE IN INCHES

0 1 2

NORTH

NTS

BUILDING 4KEY PLAN

AREA OF

WORK

ZONE 1

ZONE 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

FD100

FIRE PROTECTION - DEMOLITION

PLAN - BASEMENT

NKJ TGE

10/28/2022

N O R

HT

1/8" = 1'-0"

FIRE PROTECTION - DEMOLITION PLAN - BASEMENT

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

NOTE:

NO DEMOLITION WORK IN THIS AREA.

SHOWN FOR REFERENCE PURPOSES ONLY.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:10/28/2022

C1W

131A 131B

105A

C1N

101A101

100B

103 104

111CC1E

E01

109107

120A 120B 120C 120D 120E 120F 120G

120H C1E

120I120J120K120L120N

120M

C1M

1A

100A

105B

UCF

C

D

D.3 D.5 E.5 E.9 F.5

G

G.5 G.9 H.5 J.4 J.9 L.1

1.9

2.9

3.9

4.9

5.9

6.9

H J K LE FC.5

3.3 3.3

4.3 4.3

1 1

AREA OF FIRE

PROTECTION

DEMOLITION

AREA OF FIRE

PROTECTION

DEMOLITION

EXISTING MAIN

SPRINKLER (TYP)

REFERENCE SCALE IN INCHES

0 1 2

NORTH

NTS

BUILDING 4KEY PLAN

AREA OF

WORK

ZONE 1

ZONE 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

FD101

FIRE PROTECTION - DEMOLITION

PLAN - FIRST FLOOR

NKJ TGE

10/28/2022

N O R

HT

1/8" = 1'-0"

FIRE PROTECTION - DEMOLITION PLAN - FIRST FLOOR

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

KEYNOTES:

1. REMOVE SPRINKLERS AND PIPING. CAP PIPING

AT MAIN. PROVIDE FIRE WATCH PER NFPA FOR

OCCUPIED AREAS SERVED BY SPRINKLER

SYSTEMS DURING REQUIRED SHUT-DOWNS.

SHEET NOTES:

1. WITHIN THE AREA OF FIRE PROTECTION

DEMOLITION REMOVE ALL SPRINKLER HEADS,

BRANCH LINES, HANGERS, ETC. CAP PIPING

AT MAINS.

2. AREAS OUTSIDE THE DEFINED AREA OF FIRE

PROTECTION DEMOLITION ARE OUTSIDE THE

PRIMARY SCOPE OF WORK BUT MAY HAVE

INCEDENTAL RELATED WORK PASSING

THROUGH OR AT THE BOUNDARY.

3. AREAS OUTSIDE THE AREA OF FIRE

PROTECTION DEMOLITION ARE OCCUPIED AND

SPRINKLER SYSTEMS SHALL REMAIN

OPERATIONAL THROUGHOUT CONSTRUCTION.

ANY SHUT-DOWNS SHALL BE COORDINATED

WITH COR. CONTRACTOR SHALL BE

RESPONSIBLE FOR FIRE WATCH DURING ANY

SHUT-DOWNS.

REMOVE EXISTING 4" PIPE END CAPS AND

PREPARE FOR NEW CONNECTION.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:10/28/2022

CORRIDOR

ELECTRICAL

21A

MECHANICAL

21 MECHANICAL

UNIFINISHED SPACE

HAC

SPS ADMIN/

VENDOR DROP

SPS

CHIEF

OFFICE

26A

CORRIDOR

CON

CORRIDOR

C0S

STAIR

UNFINISHED

SPACE

19B

STORAGE

REFRIGERATION

EQUIPMENT

23A

ELEV

E01

HAC

CRAWL

SPACE

SERVICE TUNNEL

DIRTY

ANTE

LOCKER ROOM

STAIR

LOKER ROOM

WOMEN'S DECON

LOCKER ROOM

5A

MEN'S DECON

LOCKER ROOM

4A

EXISTING

ELEVATOR

EQUIPMENT

ROOM

DIRTY

LOBBY

DIRTY ELEVATOR

STORAGE

STAFF LOUNGE

CLEAN ALCOVE

DIRTY

ALCOVE

DIRTY

CORRIDOR

HAC

50 SOAP

DISPENSER

SYSTEM CLOSET

RO

SYSTEM

STORAGE

CLEAN

ANTE

DECON

WOKR AREA

LOW VOLTAGE

MECHANICAL

ALCOVE

25A

CORRIDOR

19A

STORAGE

25B

LOW VOLTAGE

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

R

R

R

R

R

R R

R

R

CW1

HW1

R

R

R

R

R

R R

R

R

C

D

D.3 D.5 E.5 E.9 F.5

G

G.5 G.9 H.5 J.4 J.9 L.1

1.9

2.9

3.9

4.9

5.9

6.9

H J K LE FC.5

3.3 3.3

4.3 4.3

OH1

FP

BOUNDARY OF FIRE

PROTECTION WORK

4" FP INSTALLED IN

PRIOR PROJECTS

REMOVE 4" CAP AND

EXTEND TO

BASEMENT AREA OF

PACT PROJECT.

REFERENCE SCALE IN INCHES

0 1 2

NORTH

NTS

BUILDING 4KEY PLAN

AREA OF

WORK

ZONE 1

ZONE 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

F100

FIRE PROTECTION - PLAN -

BASEMENT

NKJ TGE

10/28/2022

N O R

HT

1/8" = 1'-0"

FIRE PROTECTION - PLAN - BASEMENT

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

KEYNOTES:

1. EXISTING 4" FP MAIN INSTALLED IN ELEVATOR PROJECT. RISER AND ZONE VALVE LOCATED IN

MECHANICAL ROOM 13.

SHEET NOTES:

1. WITHIN THE AREA OF FIRE PROTECTION WORK, PROVIDE A COMPLETE FIRE

SPRINKLER INSTALLATION SUCH THAT THE AREA WILL BE CONSIDERED SPRINKLERED

THROUGHOUT IN ACCORDANCE WITH THE MINNESOTA FIRE CODE.

2. PIPE ROUTING WHICH RESULTS IN PIPING BELOW FINISHED CEILINGS IN FINISHED AREAS MUST

RECEIVE APPROVAL BY THE ARCHITECT PRIOR TO INSTALLATION.

3. USE OF NON SPECIFIED SPRINKLERS MUST RECEIVE APPROVAL BY ENGINEER PRIOR TO

INSTALLATION.

4. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONDITIONS, DETERMINE

HYDRAULICALLY REMOTE AREAS, OBTAIN FLOW TEST DATA, AND SUBMIT HYDRAULIC

CALCULATIONS TO ALL AUTHORITIES HAVING JURISDICTION. SEE SPECIFICATIONS FOR SPECIFIC

HYDRAULIC CALCULATION REQUIREMENTS.

5. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORE DRILLING, CUTTING, PATCH AND REPAIR OF ALL SURFACES NECESSARY FOR THE INSTALLATION OF ITEMS INSTALLED AS PART

OF THE DIVISION 21 CONTRACT. PATCH AND REPAIR TO MATCH SURROUNDING SURFACE.

6. SPRINKLER HEAD AND PIPING LAYOUT SHALL BE DETERMINED BY DIVISION 21 CONTRACTOR.

DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL PIPE ROUTING WITH

OTHER TRADES AND BUILDING CONFIGURATION.

7. REFER TO ARCHITECTURAL DRAWINGS FOR CURRENT REFLECTED CEILING PLAN INFORMATION.

8. AREAS OUTSIDE THE AREA OF FIRE PROTECTION WORK ARE OCCUPIED AND SPRINKLER SYSTEMS

SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. ANY SHUT-DOWNS SHALL BE

COORDINATED WITH COR. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE WATCH DURING ANY

SHUT-DOWNS.

9. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

10. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE WITH

NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS, INCLUDING RECORD

DOCUMENTATION, TESTING AND INSPECTION.

11. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:10/28/2022

ELECTRICAL

130C

LOW

VOLTAGE

130B

TOILET

TEAM

WORK AREA

132EXAM 1

EXAM 2

EXAM 3

EXAM 4

PCMHI

EXAM 5

CLEAN STORAGE

STORAGE

132A

EXAM 11

EXAM 10

EXAM 9

EXAM 8

EXAM 7

MEDICATION

EXAM 6

EXAM 12

TOILET

EXAM 13

EXAM 14

SPS

PROCEDURE

TOILET

HAC

SOILED

HOLDING

TEAM

WORK AREA

CLEAN

STORAGE

158A

WAITING

RECEPTION

159A

SELF

CHECK-IN

159B

SCALE

ALCOVE

159C

SCALE

ALCOVE

159D

CORRIDOR

C1E

STORAGE

130ACORRIDOR

C1

CORRIDOR

C2

CORRIDOR

C3

TOILET

SCALE

ALCOVE

159C

HAC

HAC

121A

STORAGE

EXAM 3

TOILET

164A

EXAM 4

TOILET

165A

CLEAN

MED. STO.

LOADING DOCK

CORRIDOR

STORAGE

100B

ELECTRICAL

100A

FRIDGE

131A

FRIDGE

131B

CORRIDOR

C1E

STAIR

ELEV

E01

HAC

LOBBY

120N

ELEV

E03

STAIR

TR

123C

UCF

C

D

D.3 D.5 E.5 E.9 F.5

G

G.5 G.9 H.5 J.4 J.9 L.1

1.9

2.9

3.9

4.9

5.9

6.9

H J K LE FC.5

3.3 3.3

4.3 4.3

OH2 OH2 OH2

OH2

OH2

OH2

OH1

OH2

OH2

OH2

OH2

AREA OF FIRE

PROTECTION WORK

AREA OF FIRE

PROTECTION WORK

FP

OH2

OH1

OH1

OH1

4" EXISTING FP

REFERENCE SCALE IN INCHES

0 1 2

NORTH

NTS

BUILDING 4KEY PLAN

AREA OF

WORK

ZONE 1

ZONE 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

F101

FIRE PROTECTION - PLAN - FIRST

FLOOR

NKJ TGE

10/28/2022

N O R

HT

1/8" = 1'-0"

FIRE PROTECTION - PLAN - FIRST FLOOR

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

KEYNOTES:

1. EXISTING FIRE PROTECTION MAIN UP FROM BASEMENT.

2. EXTEND EXISTING ZONE PIPING TO PROVIDE SPRINKLER COVERAGE FOR PACT.

SHEET NOTES:

1. WITHIN THE AREA OF FIRE PROTECTION WORK, PROVIDE A COMPLETE FIRE

SPRINKLER INSTALLATION SUCH THAT THE AREA WILL BE CONSIDERED SPRINKLERED

THROUGHOUT IN ACCORDANCE WITH THE MINNESOTA FIRE CODE.

2. PIPE ROUTING WHICH RESULTS IN PIPING BELOW FINISHED CEILINGS IN FINISHED AREAS MUST

RECEIVE APPROVAL BY THE ARCHITECT PRIOR TO INSTALLATION.

3. USE OF NON SPECIFIED SPRINKLERS MUST RECEIVE APPROVAL BY ENGINEER PRIOR TO

INSTALLATION.

4. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO SURVEY EXISTING CONDITIONS, DETERMINE

HYDRAULICALLY REMOTE AREAS, OBTAIN FLOW TEST DATA, AND SUBMIT HYDRAULIC

CALCULATIONS TO ALL AUTHORITIES HAVING JURISDICTION. SEE SPECIFICATIONS FOR SPECIFIC

HYDRAULIC CALCULATION REQUIREMENTS.

5. DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE FOR THE CORE DRILLING, CUTTING, PATCH AND REPAIR OF ALL SURFACES NECESSARY FOR THE INSTALLATION OF ITEMS INSTALLED AS PART

OF THE DIVISION 21 CONTRACT. PATCH AND REPAIR TO MATCH SURROUNDING SURFACE.

6. SPRINKLER HEAD AND PIPING LAYOUT SHALL BE DETERMINED BY DIVISION 21 CONTRACTOR.

DIVISION 21 CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL PIPE ROUTING WITH

OTHER TRADES AND BUILDING CONFIGURATION.

7. REFER TO ARCHITECTURAL DRAWINGS FOR CURRENT REFLECTED CEILING PLAN INFORMATION.

8. AREAS OUTSIDE THE AREA OF FIRE PROTECTION WORK ARE OCCUPIED AND SPRINKLER SYSTEMS

SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION. ANY SHUT-DOWNS SHALL BE

COORDINATED WITH COR. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE WATCH DURING ANY

SHUT-DOWNS.

9. ALL AREAS TO BE CONSIDERED LIGHT HAZARD UNLESS NOTED OTHERWISE.

10. FIRE PROTECTION CONTRACTOR SHALL DESIGN AND INSTALL A SYSTEM IN COMPLIANCE WITH

NFPA 13 AND NFPA 24. REFER TO 21 13 13 FOR ADDITIONAL REQUIREMENTS, INCLUDING RECORD

DOCUMENTATION, TESTING AND INSPECTION.

11. REFER TO 21 08 00 FOR COMMISSIONING REQUIREMENTS.

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.

Signature:

Typed or Printed Name:

Date: License Number:10/28/2022

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

THERMOSTATIC BALANCING VALVE

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

NEW CONNECTION

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

ACID VENTAV

ACID WASTEAW

COLD WATER - POTABLECW

DT DRAIN TILE

SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

PUMPED DISCHARGEPD

SANITARY DRAINAGESAN

SOFT COLD WATERSCW

SOFT HOT WATERSHW

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

WASTE ANETHESIA GAS DISPOSALWAGD

GREASE VENTGV

COMPRESSED AIRCA

DEIONIZED WATERDI

PROPANE GASP

REVERSE OSMOSIS WATERRO

STW SOFT TEMPERED WATER

TW TEMPERED WATER

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

OIL RETURNOR

OIL SUPPLYOS

LAB VACUUMVAC

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

INSTRUMENT AIRIA

MEDICAL AIRMA

MEDICAL VACUUMMV

NITROGENN

NITROUS OXIDENO

OXYGENO

PURE WATERPW

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

PLUMBING ABBREVIATION KEY

BATHTUBBT

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NC NEW CONNECTION

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS NOTED OTHERWISEUNO

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

BELOW FINISHED FLOORBFF

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

NURSE CALL CONTRACTORN.C.C.

CIVIL CONTRACTORC.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FOOD SERVICE CONTRACTORF.S.C.

MECHANICAL SEQUENCING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF SEQUENCING.

REFER TO ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND SCHEDULES FOR

CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT

THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY

DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF

THE SEQUENCING CRITERIA.

2. REVIEW PROJECT SEQUENCING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES,

ETC. WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PORTIONS OF THE PROJECT.

5. SEQUENCE DEMOLITION WORK TO MINIMIZE DOWNTIME.

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO THE VA.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM NON-STRUCTURAL BUILDING

ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE

APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

18. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSERS, RETURN, AND EXHAUST

GRILLES. ALL DAMPERS ARE NOT SHOWN ON PLANS.

19. CONTRACTOR SHALL REPAIR AND/ OR REPLACE ALL INSULATION AT EXISTING SHEET METAL

DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES AND SHALL

REPAIR OR REPLACE ANY INSULATION AT NEW AND OLD DUCT CONNECTIONS AND ANY

MISSING OR DAMAGED INSULATION ON REUSED OR EXISTING DUCTWORK.

20. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS

LOCATED ABOVE THE CEILING THAT REQUIRE OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND/ OR CALIBRATION.

ENGINEERING DISCIPLINE REFERENCE NOTES

GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER

REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED

WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A

DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.

EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE

TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED

AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE

BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL

DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS

TO BE FOLLOWED.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM LIMITED

FIELD OBSERVATIONS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING

CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ARCHITECT AND VA COR IN WRITING OF ANY CONFLICTS

WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY ARCHITECT AND VA COR IN WRITING PRIOR TO BIDDING IF OTHER

UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER

AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GC IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES,

AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY

THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM VA COR BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

12. ALL LOUD WORK SHALL BE COORDINATED WITH GENERAL CONTRACTOR TO AVOID ANY

NOISE RESTRICTION TIME SLOTS.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

PLUMBING GENERAL NOTES:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS

WERE ACQUIRED FROM THE ARCHITECTURAL PLANS.

FIRE / SMOKE BARRIER DESIGNATIONS

SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE

1-HOUR FIRE/SMOKE BARRIER

2-HOUR FIRE/SMOKE BARRIER

PLUMBING SHEET INDEX

P000 PLUMBING - COVERSHEET

PDU100 PLUMBING - DEMOLITION PLAN - BASEMENT UNDERFLOOR

PD100 PLUMBING - DEMOLITION PLAN - BASEMENT

PD101 PLUMBING - DEMOLITION PLAN - FIRST FLOOR

PD102 PLUMBING - DEMOLITION PLAN - LOWER ROOF

PU100 PLUMBING - PLAN - BASEMENT UNDERFLOOR

P100 PLUMBING - PLAN - BASEMENT

P101 PLUMBING - PLAN - FIRST FLOOR

P102 PLUMBING - PLAN - LOWER ROOF

P300 PLUMBING - DETAILS

P400 PLUMBING - WATER RISER DIAGRAM

P401 PLUMBING - WASTE AND VENT RISER DIAGRAM

P500 PLUMBING - SCHEDULES AND MATERIAL LIST

GRAND TOTAL: 13

REFERENCE SCALE IN INCHES

0 1 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

P000

PLUMBING - COVERSHEET

NKJ TGE

10/28/2022

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

NOTES: 1) SANITARY RISER UP IN WALL TO FIXTURE SHALL BE A MINUMUM OF 2". 2) 1/2" CW AND HW APPLIES ONLY TO THE FINAL VERTICAL RISE-DROP TO EACH FIXTURE, BRANCH PIPING TO VERTICAL RISE-DROP SHALL BE A MINIMUM OF 3/4" UNLESS NOTED OTHERWISE. 3) SIZES SHOWN ARE MINIMUMS. SIZES SHOWN ON THE DRAWING THAT ARE LARGER THAN THE SIZES LISTED IN THE

SCHEDULE SHALL DICTATE THE ROUGH-IN SIZE.

PLUMBING FIXTURE ROUGH-IN SCHEDULE

TAG NAME

DOMESTIC

CW

(NOTE 3)

DOMESTIC

HW

(NOTE 3)

SANITARY

(NOTE 3)

VENT

(NOTE 3) REMARKS

CS-1 1" 3/4" 4" 2" -

EWC-1 1/2" - 1 1/4" 1 1/4"

FD-2 - 2 1 1/2"

FD-4 - 4" 2"

LAV-1 1/2" 1/2" 1 1/4" 1 1/4"

MB-1 3/4" 3/4" 3" 1 1/2"

MB-2 3/4" 3/4" 3" 1 1/2"

SK-1 1/2" 1/2" 1 1/2" 1 1/4"

WC-1 1 1/2" - 4" 2"

WC-2 1 1/2" - 4" 2"

ELECTRICAL

21A

MECHANICAL

21 MECHANICAL

UNIFINISHED SPACE

HAC

SPS ADMIN/

VENDOR DROP

SPS

CHIEF

OFFICE

26A

CORRIDOR

CON

CORRIDOR

C0S

STAIR

UNFINISHED

SPACE

19B

STORAGE

REFRIGERATION

EQUIPMENT

23A

ELEV

E01

HAC

CRAWL

SPACE

SERVICE TUNNEL

DIRTY

ANTE

LOCKER ROOM

STAIR

LOKER ROOM

WOMEN'S DECON

LOCKER ROOM

5A

MEN'S DECON

LOCKER ROOM

4A

EXISTING

ELEVATOR

EQUIPMENT

ROOM

DIRTY

LOBBY

DIRTY ELEVATOR

STORAGE

STAFF LOUNGE

CLEAN ALCOVE

DIRTY

ALCOVE

DIRTY

CORRIDOR

HAC

50 SOAP

DISPENSER

SYSTEM CLOSET

RO

SYSTEM

STORAGE

CLEAN

ANTE

DECON

WOKR AREA

LOW VOLTAGE

C

D

D.3 D.5 E.5 E.9 F.5

G

G.5 G.9 H.5 J.4 J.9 L.1

1.9

2.9

3.9

4.9

5.9

6.9

H J K LE FC.5

3.3 3.3

4.3 4.3

COURTYARD

6"ST

SAN

S A

N

SAN

E X

IS

T

IN

G

EXISTING

EXISTING

ST

EXISTING

5 5

ST

3" FD

FD

3"FD

INV. EL. 1039.9"

4" C.I. SAN. SEWER

"S

A N

"S

A N

3"SAN

3"SAN

3"SAN

3"SAN

4"

SAN

SAN UP

TO 1ST

REFERENCE SCALE IN INCHES

0 1 2

NORTH

NTS

BUILDING 4KEY PLAN

AREA OF

WORK

ZONE 1

ZONE 2

10/28/2022 - ISSUE FOR 100% CONSTRUCTION DOCUMENTS

656-400

CONSTRUCT PACT CLINIC

BUILDING 4 FIRST FLOOR

ARCHITECT/ENGINEER OF RECORD

ST. CLOUD VAHCS

ST. CLOUD, MN 56303

ISSUE FOR 100% CONSTRUCTION DOCUMENTS 10/28/22

No DATEREVISION

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS PROJECT MANAGER

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

APPROVED: PROJECT COR DATE:

DATE:

PDU100

PLUMBING - DEMOLITION PLAN -

BASEMENT UNDERFLOOR

NKJ TGE

10/28/2022

N O R

HT

1/8" = 1'-0"

PLUMBING - DEMOLITION PLAN - BASEMENT UNDERFLOOR

3001 BROADWAY

STREET NE, SUITE 601

MINNEAPOLIS, MN

55413

PH: 612.540.5000

www.imegcorp.com

KEYNOTES:

1. REMOVE CATCH BASIN AND RELATED PIPING.

REMOVE DOWNSPOUT PIPING UP TO CHANGE

IN MATERIAL.

2. APPROXIMATE LOCATION OF GREASE TRAP.

REMOVE GREASE TRAP.

3. REMOVE AREA DRAIN AND PIPING. CAP PIPING

AT MAIN.

4. APPROXIMATE LOCATION OF EXISTING

MANHOLE

5. REMOVE 4"ST DOWNSPOUT PIPING UP AND

WHERE CHANGE IN PIPE MATERIAL.

6. REMOVE 6"ST BACK TO THIS POINT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .