This document contains a federal solicitation for Information Collection Forecasting Model (ICFM) services along with questions and answers from potential offerors. The Department of Veterans Affairs is seeking proposals for base year plus four option years of ICFM support services including collections forecasting and modeling, budget and legislation support, annual collections target development and allocation, ad-hoc data analytics, and business analyses impacted by the VA's EHR transition. Proposals are due by October 12, 2023 at 2:00 PM Eastern. Key personnel roles include an ICFM Program Manager and Data Analyst. The incumbent will provide knowledge transfer support and all work will be performed remotely. The solicitation includes a performance work statement, questions from offerors, and the government's responses to clarify requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77623R0149 0002_1.docx | DOCX document | |
| 36C77623R0149_1.docx | DOCX document | |
| S02_ICFM_PriceCost Schedule.xlsx | XLSX spreadsheet | |
| S02_36C77623R0149_FINAL.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
ICFM 2023 re-compete [Base + 4 OYs] [VA-23-00044637]
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 44131 |
| SOLICITATION NUMBER* |
| 36C77623R0149 |
| RESPONSE DATE/TIME/ZONE |
| 10-12-2023 14:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| R410 |
| NAICS CODE* |
| 541611 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
POINT OF CONTACT*
Contract Specialist Orangella Bittick Orangella.Bittick@va.gov
(314) 894-6460
PLACE OF PERFORMANCE
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| Orangella.Bittick@va.gov |
| EMAIL DESCRIPTION |
| Orangella.Bittick@va.gov |
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3.
EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTAN
T:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCO
UNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 AR
E MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTI
ON OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and th is amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF
AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SI
GNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, et c.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO
AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders
36C77623R0149
X X X
X The purpose of this amendment is to:
A. Respond to all Offeror questions pertaining to this Request for Proposal [RFP].
B. All submitted Offeror questions and Gov ernment responses are attached.
C. Please acknowledge receipt of this Amendment when submitting your RFP.
Page 1 of
CONTINUATION PAGE
ICFM VENDOR QUESTIONS and GOVERNMENT RESPONSE
Q01: Please provide the VHA’s preferred Labor Categories [LCATs] and estimated Level of Effort [LoE] for each task presented in your pricing spreadsheet.
A01: The labor categories and estimates need to be provided by the offerors based on the work described in the PWS and the key personnel specified in Section B.1 Part 9 – Key Personnel
Q02: The proposal instructions state that the CO wants the Past Performance Questionnaires [PPQs] in the Past Performance Volume. The PPQs state they are to be sent directly to the CO. Does the Government want the PPQs in the Past Performance Volume, sent directly, or both? If PPQs are not desired in the Past Performance Volume, do you want Relevant Experience forms/tables instead? Please verify the page limitations.
A02: It is the Government’s preference that all Past Performance Questionnaires [PPQs] be included in Volume III – Past Performance. However, as an option, the Government provided the ability to email PPQs to its representative by the proposal deadline in lieu of incorporating them into Volume III. The Government does not want Relevant Experience forms or tables included in the Past Performance Volume. The page limitations for Volume III – Past Performance listed in the TABLE: Volume, Title and Page Limitations remain unchanged.
Q03: The “expertise areas” listed as subfactors in the “Technical Experience” volume do not directly map to the task areas in the PWS. Does the Government want expertise narratives in those “expertise areas” or in the task areas enumerated in the PWS?
A03: Please use the PWS task areas for your response.
Q04: The proposal submission instructions do not state a requirement for Key Personnel resumés. However, section 9 strongly implies a requirement for resumés for 4 key personnel positions. Do you want resumés? If so, is there a preferred format or page limitation?
A04: There is no proposal requirement for the submission of Key Personnel resumes. However, in accordance with Sub-Factor 1.2, the proposal should “describe the Offeror’s hiring process that demonstrates how it will fill each Key Personnel Role with respect to this project in accordance with PWS Section 9.” The page limitations for Volume II – Technical Experience listed in the TABLE: Volume, Title and Page Limitations remain unchanged.
Q05: PWS, 6.2 Task Two – Collections Forecasting & Modeling: Is the Government open to the incorporation of advanced modeling techniques like artificial intelligence, machine learning, deep learning, and others to enhance the existing ICFM functionalities as part of the potential improvements?
A05: Yes, using any advanced modeling techniques is permissible as long as there is transparency on the modeling techniques used and the process is repeatable and auditable.
Q06: When referring to additional refinements for OF/RO consideration for the three model outputs, does this encompass both the front-end and back-end aspects of the system?
A06: It may be a possibility. The briefing can vary depending on the congressional question that needs to be answered.
Q07: PWS, 6.6 Task Six – Specialized Analyses: Can the specialized analyses and studies encompass the impact of various public health issues, not limited to infectious diseases such as COVID-19, but also including diseases and conditions that affect entire populations like diabetes and asthma? If so, should the labor categories involve expertise in public health?
A07: The specialized analysis or any studies is to be focused on the VA population and the impact of public health issues within this patient population whether it is COVID-19 or any relevant and immediate health issue[s]
Q08: Is a compliance matrix required? If so, can it be outside of Volume II Technical Experience page count?
A08: There is no proposal requirement for the submission of a compliance matrix.
Q09: How long does the Government anticipate the Government onboarding activities to take? [background checks, general account provisioning, special account provisioning for analyst and developers, such as for VPNs etc.]
A09: This can take a couple of months and does vary on the candidates who will handle the contract and their respective backgrounds. Some may have clearances while others will need to be processed by the VA.
R10: QUESTION 10 – REFERENCE: PAGE 109, E.1 52.212-1 TEAMING
Offerors / Potential Contractors who are contemplating a teaming or prime/subcontractor relationship must submit a signed plan by both parties clearly describing the specific roles and responsibilities of each party and the terms and conditions of the collaboration. Also provide the names and contact information of the primary points of contact of each party.
Q10: When is the signed plan due?
A10: The signed plan is due at the same time that proposals are due: 12 October 2023 – NLT 2:00 PM Eastern Daylight Time [EDT].
| R11: | QUESTION 11 – REFERENCE: E.1 52.212-1 INSTRUCTIONS TO OFFERORS – VOLUME I COMPLETED RFP |
| Q11: | Will the Government accept cryptographic Digital Signature [ECA] on RFP documents in lieu of printed, signed, and scanned documents? |
A11: Yes, the Government will accept electronic/digital signatures on RFP documents.
REFERENCE FOR QUESTIONS 12 – 18: SECTION 6.2 TASK TWO – COLLECTIONS FORECASTING AND MODELING OF/RO intends to develop a new version of the Integrated Collections Forecasting Model [ICFM]. Accordingly, the contractor shall explore, design, validate, and implement a model with any variables for enhancements.
Q12: Is the Offeror required to operate, maintain, and support the existing ICFM Model through delivery of the new Integrated Forecasting Model [deliverable 6.2.1] in May?
A12: Yes
Q13: Is the Offeror intended to provide “Implementation of Variables and Enhancements to the existing Financial Model [deliverable 6.2.2] until delivery of the new ICFM model [6.2.1] in May?
A13: Yes
Q14: Is the intent for the new ICFM model to be built from the ground up, or is the intent to provide iterative improvements on the existing model?
A14: Once the existing ICFM model is handed over to a new team, we can make adjustments to the model that can help improve it or start a new model from scratch assisting with newer modeling approaches that include AI integration or other relevant factors.
Q15: Does the Government intend for the Offeror to develop the model in Government-provided computing environments [Sandbox/Dev, Test, QA]?
A15: Yes
Q16: Does the Government intend that the Offeror use Government provided applications/tools for model development? Or is the Offeror expected to provide its own tools, application and licenses?
A16: The government will provide the applications and tools as needed.
Q17: What solutions/tools and infrastructure form the existing ICFM Model?
A17: Currently the ICFM model and associated files are stored in a NIST 800-171 AWS cloud environment of the following specifications:
Hardware:
· AMD64 server;
· 20 GB SAS home operating drive, 100 GB temp space, and ~520 GB archived data + ~100 GB of non-archived data; and
Software:
· SAS 9.4M5, WX64_SV operating system
Q18: Regarding “Potential deliverables include, but not limited to, the following”, how can Offeror bound this requirement to develop the required effort for Fixed Price submittal?
A18: On an annual basis we have ongoing and new requirements for Ad hoc requests. Many of those requests are tied to legislative activity that we cannot control or predict. Our best estimate for level of effort is historical workload volume.
| R19: | QUESTION 19 – REFERENCE: 6.3 TASK THREE – BUDGET & LEGISLATION SUPPORT AND 6.4 TASK FOUR – ANNUAL COLLECTIONS TARGET DEVELOPMENT AND ALLOCATION SUPPORT |
| Q19: | What analysis and reporting tools are currently being used [Examples: PowerBI, Angles for Oracle etc.] in addition to the MS Office products already identified in the RFP [SQL, Office, Excel, PowerPoint]? |
A19: In general, we use MS-SQL to conduct data analytics and use Word, Excel, and/or PowerPoint to display analysis and results.
REFERENCE FOR QUESTIONS 20 – 21: SECTION 6.5 TASK FIVE – AD-HOC AND ROUTINE DATA ANALYTICS The contractor must be familiar with VHA datasets [e.g., VDE and CDW] and VHA web-based reporting system currently available [e.g., mPower, POWER+, and VSSC]
Q20: What is the complete list of tools currently in use and expected to be included in the new Integrated Forecasting Model?
A20: Current, the following SAS packages are used:
· Base SAS;
· SAS/STAT;
· SAS/ETS;
· SAS Integration Technologies;
· SAS/Secure 168-bit;
· SAS/Secure Windows;
· SAS Enterprise Guide;
· SAS/ACCESS Interface to PC Files;
· SAS/ACCESS Interface to ODBC;
· SAS Workspace Server for Local Access;
· High Performance Suite;
· SAS Add-in for Microsoft Excel;
· SAS Add-in for Microsoft Outlook;
· SAS Add-in for Microsoft PowerPoint; and
· SAS Add-in for Microsoft Word Q21: Does the COR currently manage the Ad-Hoc report requests, or does the Offeror need to create a process to manage the 10 monthly Ad-Hoc report requests?
A21: Ad-Hoc report requests come from the COR.
R22: QUESTION 22 – REFERENCE: 6.7 TASK SEVEN – BUSINESS ANALYSES IMPACTED BY VA’S EHR TRANSITION To date a limited number of VAMCs are operating on the new EHR platform. VA will continue to maintain and support its legacy EHR systems until every VA medical facility has the new EHR solution.
Q22: What are the five VA “Go-Live” sites using the new EHRM program? Which VA Networks are these sites located in?
| A22: | VA “GO-LIVE” SITES USING THE NEW EHRM PROGRAM: | |
| # | ||
| Station # | ||
| Facility | ||
| VISN | ||
| CPAC | ||
| Cerner Transition Date | ||
| FY |
| 1 |
| 668 |
| Spokane |
| 20 |
| WCPAC |
| 10/1/2020 |
| 2021 |
| 2 |
| 687 |
| Walla Walla |
| 20 |
| WCPAC |
| 3/26/2022 |
| 2022 |
| 3 |
| 757 |
| Columbus |
| 10 |
| NCCPAC |
| 4/30/2022 |
| 2022 |
| 4 |
| 653 |
| Roseburg |
| 20 |
| WCPAC |
| 6/11/2022 |
| 2022 |
| 5 |
| 692 |
| White City |
| 20 |
| WCPAC |
| 6/11/2022 |
| 2022 |
R23: QUESTION 23 – REFERENCE: 6.7 TASK SEVEN – BUSINESS ANALYSES IMPACTED BY VA’S EHR TRANSITION The contractor shall provide data analytical support for selected sites as appropriate to their transition phase.
Q23: Will the Government provide some estimate of the number of deliverables or expected level of effort? As this statement is rather open ended for firm fixed price contract.
A23: VA’s EHR transition deployments are currently paused across the nation. There isn’t an updated schedule available now. We’re anticipating at least one EHR transition occurring in CY2024, with details on other transitions forthcoming.
R24: QUESTION 24 – REFERENCE: PLACE OF PERFORMANCE
The contractor shall support this effort via virtual meetings or at approved contractor facilities as directed by the COR and mutually agreed to by the contractor.
Q24: Offeror needs work locations in order to accurately provide FFP costs. Will COR specify work locations in advance of submittal, or will COR accept FFP changes when final work locations are approved?
A24: 100% remote work.
R25: QUESTION 25 – REFERENCE: 15.2.b ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information.
Q25: What is the level of sensitivity or investigation requirement for each of the roles and Key Personnel? [This is also reflected in 15.12. Confidentiality and Non-Disclosure, 9.3]
A25: The level of sensitivity / investigation for each of the roles and Key Personnel is Tier 1 – Low Risk.
| R26: | QUESTION 26 – REFERENCE: 15.12.9.4 CONFIDENTIALITY AND NON-DISCLOSURE – e-AP |
| Q26: | Is the Offeror expected to have and maintain DISS/NBIS account to manage the e-QIP requirement? |
A26: A background investigation will be initiated in a secure Electronic Questionnaires for Investigations Processing [e-QIP] system. e-QIP is where one completes his/her security questionnaire and begin his/her background investigation. He/She has 7 calendar days to complete the online e-QIP questionnaire otherwise the background investigation is subject to cancellation.
R27: QUESTION 27 – REFERENCE: C.4 52.237-3 CONTINUITY OF SERVICES [JAN 1991]
Contractor also shall disclose necessary personnel records and allow the successor to conduct on-site interviews with these employees.
Q27: Is the incumbent obligated to support this knowledge transfer and training clause under their existing contract?
A27: Yes, the FAR Clause 52.237-3 Continuity of Services is included in the incumbent’s current contract.
| R28: | QUESTION 28 – REFERENCE: SECTION E - SOLICITATION PROVISIONS; SUBMISSION OF PROPOSALS; TEAMING [P.110 OF 148] |
| Q28: | Will the Government please confirm in which volume applicable Teaming Agreements should be included and that the agreement will not count against page limitations? |
A28: Teaming Agreements should be provided as a separate attachment of no more than 03 pages. Please see updated TABLE in Government response to Question 32.
| R29: | QUESTION 29 – REFERENCE: PERFORMANCE WORK STATEMENT 9. KEY PERSONNEL [P.21 OF 148] |
| Q29: | Will the Government please confirm that resumes may be submitted as an appendix to Volume II Technical Experience and will not count against page limitations? |
A29: There is no proposal requirement for the submission of resumes. Please see Government response to Question 04.
| R30: | QUESTION 30 – REFERENCE: SECTION E - SOLICITATION PROVISIONS; SUBMISSION OF PROPOSALS; FORMAT [P.111 OF 148] |
| Q30: | Will the Government please allow 01 page for each past performance reference for a total of 03 pages narrative for the volume? |
A30: No
| R31: | QUESTION 31 – REFERENCE: SECTION E - SOLICITATION PROVISIONS; SUBMISSION OF PROPOSALS; FORMAT [P.111 OF 148] |
| Q31: | The instructions state that font size shall be no smaller than 11-point. Will the Government please allow 9-point font for tables and 8-point font for graphics? |
A31: Yes, the Government will allow 9-point font for information included within tables and 8-point font for information contained in graphics.
| R32: | QUESTION 32 – REFERENCE: SECTION E - SOLICITATION PROVISIONS; SUBMISSION OF PROPOSALS; FORMAT [P.111 OF 148] |
| Q32: | The instructions above the "Volume, Title and Page Limitations" table state that "proposals will be separated into four [4] volumes” and includes the Cover Page as part of Volume I [Volume I Cover Page and Completed RFP]. However, the table includes the Cover Page as a separate document with separate file name from Volumes I – IV. Please confirm whether the Cover Page is a separate 2-page document or if it is part of Volume I. |
A32: The Cover Page is not a separate 02 page document; it is part of Volume I. Please see updated TABLE below:
Volume, Title and Page Limitations
| Volume Number |
| Factor |
| File Name |
| Page Limitations |
| Volume I |
| Cover Page |
| Contractor Name_Cover.pdf |
| 02 Pages |
| Completed RFP |
| Contractor Name_CompRFP.pdf |
None
| Volume II |
| Technical Experience |
| Contractor Name_Tech.pdf |
| 36 Pages |
| Volume III |
| Past Performance |
| Contractor Name_PastPerf.pdf |
| 01 Page Narrative |
Note: References will be complete and provide the Past Performance Questionnaire [PPQ], Solicitation Attachment C, to the Government. Provide no more than three [03] PPQs. PPQs will not be included in the page count limitation.
| Volume IV |
| Price |
| Contractor Name_PriceCostSchedule.xls |
OR
Contractor Name_PriceCostSchedule.xlsx None
Attachment A: ICFM Price/Cost Schedule
| N/A |
| Teaming Arrangement |
| Contractor Name_Teaming.pdf |
| 03 Pages |
| R33: | QUESTION 33 – REFERENCE: E.1 52.212-1.B SUBMISSION OF OFFERS [P.105 OF 148] AND SECTION E - SOLICITATION PROVISIONS |
| Q33: | Please confirm that the components listed under "Submission of Offerors" do not require a specific response to each item, but rather are addressed by virtue of an Offeror's proposal [i.e., Cover Page and Volumes I – IV]. |
A33: Correct
| R34: | QUESTION 34 – REFERENCE: SECTION 6.2, TASK 2 [P.11 OF 148] |
| Q34: | Will the Government provide the necessary server, modeling packages and required server space to hold the large amount of data [1TB of historical data]? |
A34: Yes
| R35: | QUESTION 35 – REFERENCE: SECTION 6.2, TASK 2 [P.11 OF 148] |
| Q35: | The RFP PWS requirements state all models and data sources must be housed within the VA firewall. Will the Government please specify what secure file transfer protocol [SFTP] will be required? |
A35: Use SFTP [PuTTY] and/or Microsoft One Drive to move data between local machines and VA data system.
| R36: | QUESTION 36 – REFERENCE: SECTION 6.2, TASK 2 [P.11 OF 148] |
| Q36: | Outputs from EHCPM and ICFM may be used in other program office projects. Will the Government please clarify what limitations will be placed on information sharing? |
A36: The program office will determine how to share information by the requestors of that information.
| R37: | QUESTION 37 – REFERENCE: SECTION 6.2, TASK 2 [P.9 OF 148] |
| Q37: | If the Government intends to develop a new version of ICFM, will the Government run current version of ICFM while a new version of the model is developed? |
A37: Yes
| R38: | QUESTION 38 – REFERENCE: GENERAL |
| Q38: | With nearly $3.9B in MCCF collections, a new version of ICFM will require significant data gathering. Will the Government provide a group of Subject Matter Experts to facilitate internal data gathering and mining? |
A38: Yes
| R39: | QUESTION 39 – REFERENCE: SECTION 6.2, TASK 2 [P.9 OF 148] |
| Q39: | Can the Government provide three years of historical data delineated by service volume, priority status, demographics, economic conditions, insurance coverage, and claims [as defined in the RFP] to incorporate into a new version of a collections forecasting model? |
A39: Once awarded, this program office will share relevant historical data/reports.
| R40: | QUESTION 40 – REFERENCE: SECTION 6.2, TASK 2 [P.9 AND P.10 OF 148] |
| Q40: | Does the Government anticipate incorporating new data sources that are not currently utilized in ICFM? [Task 2, page 9-10] |
A40: If deemed relevant to improve efficiency and effectiveness of current forecasting model.
| R41: | QUESTION 41 – REFERENCE: SECTION 6.2, TASK 2 [P.10 OF 148] |
| Q41: | Is sufficient data available on miscellaneous collections [i.e., parking, leases, etc.] to generate a collections forecast? |
A41: Currently, we don’t have sufficient inputs for ICFM to forecast/allocate miscellaneous collections target [i.e., parking, leases, etc.]. We are using historic collection results to estimate/extrapolate future target to each VAMCs.
| R42: | QUESTION 42 – REFERENCE: SECTION 6.2, TASK 2 [P.9 AND P.10 OF 148] |
| Q42: | What is the expected timeline for having a new validated version of ICFM? |
A42: Last day of May during each year of the contract.
| R43: | QUESTION 43 – REFERENCE: SECTION 6.2, TASK 2 [P.10 AND P.11 OF 148] |
| Q43: | Is there a centralized program office that would provide the required data to generate the new forecasting models? |
A43: Revenue Operation’s Business Information Office will provide or facilitate provision of requested data.
| R44: | QUESTION 44 – REFERENCE: SECTION 6.2, TASK 2 [P.11 OF 148] |
| Q44: | How often does the Government anticipate the requirement of ad hoc estimates from Enrollment and Forecasting? |
A44: No more than 10 ad-hoc requests per month.
| R45: | QUESTION 45 – REFERENCE: SECTION 6.2, TASK 2 [P.10 AND P.11 OF 148] |
| Q45: | Is there a requirement that the new model incorporate projected relative value unit from EHCPM? |
A45: Yes
| R46: | QUESTION 46 – REFERENCE: SECTION 6.3, TASK 2 [P.12 OF 148] |
| Q46: | Is there a requirement that the new model generate non-MCCF collection for budget formulation? If so, is there a data source with a monthly update frequency? |
A46: No. The ICFM model is only for MCCF collections.
| R47: | QUESTION 47 – REFERENCE: SECTION 6.3, TASK 2 [P.12 OF 148] |
| Q47: | Is there a budget formulation requirement to delineate community care from in-house care across all funds? |
A47: Yes. Community care funds include the Third party fund [528713] and the First party fund [528714].
| R48: | QUESTION 48 – REFERENCE: SECTION 6.7, TASK 7 [P.18 OF 148] |
| Q48: | Will the Government require separate forecasting models for sites transitioned to Cerner? |
A48: We are uncertain when/if a separate forecasting model will be required for sites that have transitioned to Cerner. Once the EHR transitions resume and the data flows are understood, we will reengage on this issue.