36C77623B0010 0003.pdf

PDF 179 KB Posted

Attached to
Y1DA--657A4-21-702 EHRM Training and Admin Space Support 657-22-4-3978-0641 (VA-22-00092331)
Solicitation number
36C77623B0010
Issued by

View the file

Other files

File Type Posted
36C77623B0010 0006.pdf PDF
Updated EHRM Poplar Bluff Tech Questions Final 15 Mar 2023.pdf PDF
1984 Seismic Photos_Reference Only.pdf PDF
36C77623B0010 0005.pdf PDF
EHRM Poplar Bluff Tech Questions Final 13 Mar 2023.pdf PDF
36C77623B0010 0004.pdf PDF
Reference Only Plans 647-90-1010 Sun Roof Garden 1990-06-14.pdf PDF
Wage Determination - Butler County 1-20-2023.pdf PDF
Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part2.pdf PDF
Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part3.pdf PDF
EHRM Poplar Bluff Tech Questions Final 2023-03-02.pdf PDF
Reference Only Plans 1948 Original.pdf PDF
Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part1.pdf PDF
36C77623B0010 0002.pdf PDF
2nd Site Visit Sign In Sheet - PB TASS - 2023-02-14.pdf PDF
IFB - 36C77623B0010 - PB EHRM TASS -Updated - 2-6-2023.pdf PDF
Attachment 13 - Site Visit Instructions.pdf PDF
36C77623B0010 0001.pdf PDF
Attachment 11 - Wage Determination - Butler County 1-20-2023.pdf PDF
Site Visit Sign-in Sheet - PB TASS - 2023-02-03.pdf PDF
Attachment 14 - Site Visit Map.pdf PDF
IFB - 36C77623B0010 - PB EHRM TASS - 1-19-2023.pdf PDF
Attachment 14 - Site Visit Map.pdf PDF
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 2 - CD Specifications_Revised.pdf PDF
Attachment 3 - CD Combined Drawings.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 12 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 6 - Submittal Register.xlsx XLSX spreadsheet
Attachment 4 - Asbestos and Lead Inspection Report - Building 1 - Part 1 of 2.pdf PDF
Attachment 8 - RECORDS MANAGEMENT OBLIGATIONS.pdf PDF
Attachment 1 - Project Synopsis.pdf PDF
Attachment 7 - OIT for SOW VA Handbook 6500.6 Appendix C POP_PrivacyOnly.pdf PDF
Attachment 13 - Site Visit Instructions.docx DOCX document
Attachment 11 - Wage Determination - Butler County 1-13-2023.pdf PDF
Attachment 5 - Asbestos and Lead Inspection Report - Building 1 - Part 2 of 2.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(Such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

03-03-2023

657A4-21-702

36C776

Amos L. Jackson Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

00076

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77623B0010

03-03-2023

X

X X

March 15, 2023 @ 1:00 PM (EST)

X 1

The purpose of this amendment is to:

1. Extend the bid closing date from March 9, 2023 to March 15, 2023 at 1:00 PM (EST).

2. Provide the EHRM Poplar Bluff Tech Questions Final Response.

3. Updated Wage Determination - Butler County 1-20-2023

4. The following documents are Reference Only Documents:

* Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part1

* Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part2

* Reference Only Plans 647-018 Seismic Corrections 1982-02-10_Part3

* Reference Only Plans 647-90-1010 Sun-Roof Garden 1990-06-14

* Reference Only Plans 1948 Original

Donald A. Marsh III Contracting Officer

PCAC15L3-1697

Amendment 0003

See attached document: EHRM Poplar Bluff Tech Questions Final Response 3-2-2023.

See attached document: Wage Determination - Butler County 1-20-2023.

See attached document: Reference Only Plans 647-018 Seismic Corrections 1982-02- 10_Part1.

See attached document: Reference Only Plans 647-018 Seismic Corrections 1982-02- 10_Part2.

See attached document: Reference Only Plans 647-018 Seismic Corrections 1982-02- 10_Part3.

See attached document: Reference Only Plans 647-90-1010 Sun-Roof Garden 1990-06-14.

See attached document: Reference Only Plans 1948 Original.

End of Document

File details come from the government source that posted it. Updated .