This document includes a presolicitation notice for architect-engineer services and standard form 330 qualification packages for an EHRM infrastructure upgrades design project at the Salem VA Medical Center in Salem, Virginia.
The Veterans Health Administration Program Contracting Activity Central is seeking sources to award a firm-fixed price design contract with a period of performance of 262 calendar days after notice to proceed. The magnitude of construction is over $10 million. Responses are due by July 22, 2022. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses. Evaluation criteria include specialized experience in IT and network infrastructure projects, professional qualifications of staff, capacity to complete the work on schedule, and past performance history. The selected firm will provide design development, specifications, reports, and construction period services for network infrastructure installation, data center upgrades, electrical and mechanical system renovations, and security improvements.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X-MATRIX SUMMARY
| Station | Location | Name | Building | Room | Cabling | Patch Panels | Fiber | Power | Bonding | UPS | Dedicated Cooling | Temp | Humidity | Racks Sensors | Space | Notes | ||
| 658 | Salem | VAMC | 143 | BB-140A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | BG-120 | X | X | X | X | X | X | X | X | X | X | NO | Intermediate fiber switch in room | ||
| 658 | Salem | VAMC | 143 | BF-114 | X | X | X | X | X | X | X | X | X | X | X | X | added a room | |
| 658 | Salem | VAMC | 143 | BE-100 | X | X | X | X | X | X | X | X | X | X | X | NO | ||
| 658 | Salem | VAMC | 143 | BG-138 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | BF-110A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | BC-114 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1FG-148 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1B-122 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1D-118 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1C-137 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1EF-104 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 1C-121 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 2J-171 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 2J-106 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 3J-159 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 3J-105 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 4J-106 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 143 | 4H-101 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 1 | 3H | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 1 | 216 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 5 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 125A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 128 | X | X | X | X | X | X | X | X | X | X | NO | PBX/PRI eqipment in room and data center, Intermediate fiber switch, no data ports at this time | ||
| 658 | Salem | VAMC | 2 | 136-2 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 237A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 225B | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 325B | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2 | 337A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2A | G051 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2A | G056 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 2A | 1A-C1-9 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 4 | 19A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 4 | C1-11 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 4 | 208 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 5 | 3B | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 7 | 11 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 7 | 106 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 7 | 206 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 8 | 16i | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 8 | 107A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 8 | 208A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 9 | 11 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 9 | 128 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 9 | 218 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 10 | 9 | X | X | X | X | X | X | X | X | X | X | NO | |||
| 658 | Salem | VAMC | 10 | 102 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 10 | 220 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 11 | 8A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 11 | 114 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 11 | 202 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 12 | 5 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 12 | 134 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 12 | 238 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 13 | 2 | X | X | X | X | X | X | X | X | X | X | X | Boiler plant | ||
| 658 | Salem | VAMC | 14 | 104 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 15 | 113 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 16 | 7 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 74 | 10 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 74 | 127A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 74 | 101A | X | X | X | X | X | X | X | X | X | X | NO | |||
| 658 | Salem | VAMC | 74 | 220 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 74 | 209 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 75 | 14 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 75 | 116 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 75 | 144 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 75 | 246 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 76 | 21 | X | X | X | X | X | X | X | X | X | X | X | changed from out of scope | ||
| 658 | Salem | VAMC | 76 | 118A | X | X | X | X | X | X | X | X | X | X | X | want to duplicate the fiber run in two diffeerent pathway to add a 2nd floor room | ||
| 658 | Salem | VAMC | 77 | 4A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 77 | 117A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 77 | 206A | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 145 | 1 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 168 | 125 | X | X | X | X | X | X | X | X | X | X | X | |||
| 658 | Salem | VAMC | 170 | 117 | X | X | X | X | X | X | X | X | X | X | NO | |||
| 658 | Salem | VAMC | 17 | New TR | X | X | X | X | X | X | X | X | X | X | X | New addition to the sheet, Variance required | ||
| 658 | Salem | VAMC | 17 | New TR | X | X | X | X | X | X | X | X | X | X | X | New addition to the sheet, Variance required | ||
| 658 | Salem | VAMC | 144 | New TR | X | X | X | X | X | X | X | X | X | X | X | New addition to the sheetVariance required, possibly coming from BLDG 12 | ||
| 658 | Salem | VAMC | 175 | New TR | X | X | X | X | X | X | X | X | X | X | X | New addition to the sheet, Variance required | ||
| Downtown TOTALS | 79 | 79 | 79 | 80 | 79 | 79 | 79 | 79 | 79 | 79 | 79 | 74 |
| Station | Location | Name | Building | Room | Cabling | Patch Panels | Fiber | Power | Bonding | UPS | Dedicated Cooling | Temp | Humidity | Racks Sensors | Space | Notes |
| 658GB | Salem | DANVILLE CBOC | 143 | X | X | NO | NO | NO | X | X | X | X | X | X | Contracted Facility | |
| 658GA | Salem | TAZEWELL CBOC | 1-TCBOC | 658GA | X | X | NO | NO | NO | X | X | X | X | X | NO | Contracted Facility, Site Engineer advised that space is adequate |
| 658GE | Salem | WYTHEVILLE CBOC | SP132 | X | X | NO | NO | NO | X | X | X | X | X | X | Lease Termination12/31/2030 | |
| 658GD | Salem | STAUNTON CBOC | 132 | X | X | NO | NO | NO | X | X | X | X | X | NO | Lease Termination 7/31/2021, renewal under review | |
| 658GC | Salem | LYNCHBURG CBOC | 20A | X | X | NO | NO | NO | X | X | X | X | X | X | Lease Termination 8/20/2030 | |
| 658 | Salem | Roanoke Veteran Center | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | Out of Scope | |
| 658 | Salem | Consolidated Accounting Unit | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | NO | Out of Scope | |
| CBOC TOTALS | 6 | 5 | 5 | 0 | 0 | 0 | 5 | 5 | 5 | 5 | 5 | 3 |
| Station | Data Center | Building | Room | Space | HVAC | Cable Distro | WAN | UPS | NOTES |
| 658 | Salem | 74 | 227E | X | X | X | NO | X | Funding will be provided to make adjustments to accommodate Space, HVAC, Cabling and UPS. This includes the reorg to do a hot/cold aisle setup, min 4ft in front of cabinets needed. Additional overhead cable tray parts and supplies. CRAC's are good but funding for ductwork and air distribution will be supplied. Included in scope is UPS frame replacement for the 2 UPS's to PX80, and to build out additional battery modules to support the room. |
| General Notes | |
| X | ~included in scope of NRM project |
| NO | ~not included in scope |
| TR Notes |
| Cabling: |
| Fiber: | Additional run to Bldg 76 (Room 118A) to supply second floor use. |
| Power: |
| Data Center Notes | |
| Verizon and Comcast DMARKs come in from opposite sides of the campus. Funded is not needed for WAN diversity. | |
| Please refer to notes in the X matrix |
*CRACs: 3 CRACS listed are adequate for space. HVAC adequate but funding being provided for ductwork and air distribution.
*Power: Replace both UPS frames only (modules already refreshed, add additional) - APC PX 40 Frame 208V
| Is the Data Center able to accept the JSA and FDSS at the time of scoping? | |
| JSA - Readiness | space is good, cooling is good, power is available but total capacity is marginal, and WAN circuits are perfect. |
| FDS -Readiness | space is good, cooling is good, power is available but total capacity is marginal, and WAN circuits are perfect. |
DropDown Values
| Space Use | UPS | HVAC | SPACE | DISTRICT | TERRITORY | |
| ADMIN | Installed - Adequate | Installed - Adequate | YES | Adequate - Room for expansion | 1 | T1 |
| CLINICAL | Installed - Inadequate | Installed - Indequate | NO | Adequate - No room for expansion | 2 | T2 |
| Other | Not Installed | Not Installed | Inadequate - makeshift installations | 3 | T3 | |
| Exclude | Missing data | Missing data | 4 | T4 | ||
| 5 | T5 |