Attachment 1 - 659-22-700 Questions and Answers.pdf

PDF 655 KB Posted

Attached to
C1BG--EHRM Infrastructure Upgrades – Salisbury, NC 659-22-700 (VA-22-00010153) Design
Solicitation number
36C77622R0027
Issued by

About this file

This document contains questions and answers related to a federal contract opportunity for EHRM infrastructure upgrades at the Salisbury VA Medical Center in North Carolina. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses and involves designing upgrades to network infrastructure, structured cabling, electrical systems, HVAC, telecommunications rooms, the data center and security systems across multiple buildings. Firms are required to submit SF330s by February 21, 2022 to be considered, and will be evaluated on their experience with similar healthcare IT and facility upgrade projects, technical qualifications, past performance, and ability to complete the work within one year of award. The selection process will include discussions with the most highly qualified firms prior to awarding a fixed price design contract.

View the file

Other files

File Type Posted
Attachment 2 -Entire site map Salisbury VA.pdf PDF
Attachment 4 - STS 3.1.pdf PDF
Attachment 3 - Salisbury VAMC Design and Construction Manual.pdf PDF
Attachment 5 HEFP SEP Design Alert 7.pdf PDF
36C77622R0027_2.docx DOCX document
36C77622R0027_1.docx DOCX document
Attachment 09 - Station Floor Plans_10-13-2021.zip ZIP file
Attachment 01 - VHA Required Div 01 Spec Sections - Copy.docx DOCX document
Attachment 13 - 659-22-700_SOW EHRM Infrastructure Upgrades-Salisbury_V5_ 11-16-2021.docx DOCX document
Attachment 07 - Seasonal Influenza with Vaccines.pdf PDF
Attachment 14 - Wage Determinations SCA 2015 4423 10.20.2021.gov.pdf PDF
36C77622R0027.docx DOCX document
Attachment 06 - PG 18-15 AE Submission Reqts Vol C - Copy.doc DOC document
Attachment 02 - VA OEHRM Site Infrastructure Reqs 1.9 - Copy.pdf PDF
Attachment 12 - Training and Admin Support Planning Guide.pdf PDF
Attachment 04 - Sensitive Infrastructure Data Classification Memo - Copy.pdf PDF
Attachment 15 - Past Performance Questionnaire.docx DOCX document
Attachment 11 - VHA Sup Contract Reqs for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 10 - SBYVAMC-Site Plan.pdf PDF
Attachment 05 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec - Copy.docx DOCX document
Attachment 03 - HEFP SEP Design Alert 1-6.zip ZIP file
Attachment 08 - VHA Directive 1061 .pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

659-22-700_Questions & Answers -001 Date 09 Feb 2022

1. The document states “Annual influenza shot is required for all staff performing work on Tomah

VA campus”. Is this intended to be required for the Salisbury VAMC?

Response:

Yes the intent is to be for the Salisbury VAMC This is a misdescribe note; it should read as follows;

“Annual influenza shot is required for all staff performing work on Salisbury VA campus”

2. NEPA assessment: Where is the VA in this process?

Response:

VA has environmental personnel who are knowledgeable about the types of environmental issues that are often associated with different types of projects. This institutional knowledge will allow a project team to develop a list of evaluations, surveys, or other data re quired to identify and assess potential environmental impacts.

https://www.cfm.va.gov/til/etc/NEPAGuidance.pdf

3. Will a ROM cost estimate be acceptable for the Basis of Design 10% submittal?

Requirement is initial cost estimate or “First Cost”.

Please reference https://www.wbdg.org/resources/cost-estimating for more clarification if needed.

4. Are there existing Revit models for all of the scoped buildings?

No

5. Can we utilize BIM360 for this project?

To be complaint to VA BIM guide utilize the site below:

https://www.cfm.va.gov/til/bim/VA-BIM-Guide.pdf

6. Is there a file sharing platform that the VAMC will require?

Please find Attachment 3 in this amendment for the Salisbury VAMC Design and Construction Manual

7. The SOW states ISTS 3.0, since 3.1 has been issued which reference will be used for this project?

Version 3.1 is attached to this amendment.

See Attachment 4.

Attachment 1

8. SOW does not specifically state that a renovation/addition of Training Space is required, but Attachment 12 is the Training and Support Space Planning Guide. Will the VAMC define the intent?

Response:

See SOW Attachment 09-Station Floor Plans in the Pre-Solicitation notice.

And see Attachment 3 to this amendment, pdf Salisbury VAMC Design and Construction Manual

9. Is there existing survey data for the site?

There is existing survey data.

Please find attached cad file.

“2016-entire site Salisbury VA - 02-21-16”

Note; this CAD file is only for general reference should be verify with additional utilities investigation and survey works if require, due to the age of this information.