This document contains responses to questions from vendors regarding a solicitation for construction renovation work at the EHRM Training Room in Topeka, Kansas for the Department of Veterans Affairs Technology Acquisition Center Austin. Key details include that the work includes replacing light fixtures and devices in room B214A while keeping the existing ceiling, furnishing and installing CAT6a for communication cabling and routing it to various IT rooms, coordinating the location of access control panels, and evaluating whether to repair or replace an existing movable partition.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI RESPONSE

PROJECT NUMBER 36C77622B0058 (1794.14)

PROJECT NAME EHRM Topeka DATE October 28, 2022 SUBJECT RFI Responses

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

NO. QUESTION RESPONSE

1 Detail 3/AE405 room B214A is not indicating demo of acoustical ceiling, yet, room finish schedule AF702 shows room B214A gets new ACT-1 ceiling. Does room B214A get a new ceiling ACT- 1?

The existing ceiling can remain in place. Light fixtures and other devices are being replaced.

2 Is the project taxable? Will the VA provide a tax exempt form?

VA cannot provide a tax exempt form.

3 Detail 2/AE404, please indicate wall type at south end of room?

The walls on the south end of the HAWLEY WEST CLASSROOM #C114A are to be Type B2.

4 Furniture fixture equipment schedule, E-7 smart board is listed as contractor furnished contractor installed please provide specification?

Please reference Wall Type B2 Sheet AF-702

5 Are we responsible for any repairs on operable wall?

No point of reference for this question – is the term ‘we’ in reference to the contractor installing the operable wall? I thought these were usually installed by the manufacturer, and all repairs were handled by the manufacturer per warranty requirements

6 Please provide specifications that are missing for Hardware Set 7 in the Specifications 08 71 00 Door Hardware.

Provide each PR door(s) with the following:

2 EA CONT. HINGE 224HD

628 IVE

1 EA PANIC HARDWARE 9949/50-L-06-LBL-

SNB 626 VON

1 EA PANIC HARDWARE 9949/50-L-DT-06-

LBL-SNB 626 VON

1 EA CYLINDER W/ KEYED CONSTRUCTION CORE TYPE AS

REQ''D 626 UNK

1 EA PERMANENT CYLINDER/CORE TYPE AS REQ'D TO

MATCH EXISTING KEY SYSTEM - KEYED AS DIRECTED 626

UNK

2 EA SURFACE CLOSER 4040XP SCUSH

TBSRT 689 LCN

PROJECT NAME EHRM Topeka DATE October 28, 2022 SUBJECT RFI Responses

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

2 EA KICK PLATE 8400 10" X 1" LDW

B-CS 630 IVE

2 EA MOP PLATE 8400 4" X 1" LDW

B-CS 630 IVE

1 EA GASKETING 188SBK PSA (USE

SILENCERS AT NON-RATED OPENINGS)

7 The Bid Form in the Solicitation shows on one bid item 0001. In the Specifications Alternate No. 1 is shown but looks like it is a placeholder that has not been filed out. Please clarify.

There is only one bid item, item 0001, which includes all the required work.

8 Plan details in T-501 call for Cat 5e, is this correct? Provide CAT 6a for communication cabling.

9 Where are the TR locations for each building that we are to run our Cat 5e and Coax cabling back to? The only area that has a TR shown is for Building 1 Rm C114, the others don’t show the TR locations.

Provide CAT 6a for communication cabling. Refer to Key Notes 31, 32 and 33 in the next page.

10 Where is the location for the Access Control Panels for each building?

Coordinate with VA for exact location of Access Control panels.

11 Sheets T-401 has a Key Note #32 on the sheet but no information for it.

Print error. Key Note #32 shall be:

ROUTE CATEGORY CABLING FROM DATA DROP

TO PATCH PANELS IN IT ROOM A101D IN

ACCORDANCE WITH SPECIFICATIONS. PROVIDE

ADDITIONAL PATCH PANELS AS REQUIRED FOR

A FULLY OPERATIONAL SYSTEM.

12 Sheets T-403 has a Key Note #33 on the sheet but no information for it.

Print error. Key Note #33 shall be:

“ROUTE CATEGORY CABLING FROM DATA DROP

TO PATCH PANELS IN IT ROOM C254 IN

ACCORDANCE WITH SPECIFICATIONS. PROVIDE

ADDITIONAL PATCH PANELS AS REQUIRED FOR

A FULLY OPERATIONAL SYSTEM.”

13 Sheets T-404 has a Key Note #31 on the sheet but no information for it.

Print error. Key Note #31 shall be:

ROUTE CATEGORY CABLING FROM DATA DROP

TO PATCH PANELS IN IT ROOM 108 IN

ACCORDANCE WITH SPECIFICATIONS. PROVIDE

PROJECT NAME EHRM Topeka DATE October 28, 2022 SUBJECT RFI Responses

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

ADDITIONAL PATCH PANELS AS REQUIRED FOR

A FULLY OPERATIONAL SYSTEM.

14 Note 2.19 AE404, existing moveable partition to receive new façade material- repair track assembly upon reinstall and endure the panel system operates appropriately. Can you tell me who the manufacturer is on this operable wall? Can you tell me the model number on this wall? Are the core panel surfaces steel or drywall? Depending on the answers to these questions, it may be best to furnish and install a new operable wall.

Spur to look at cost savings by fixing or replacing moveable partition

15 Is there verbiage indicating where the cable shall be pulled back to for each TR?

Refer to missing Key Notes 31, 32 and 33 above.