This document contains questions and answers from a site visit for a federal construction project to renovate an EHRM Training Room and administrative support space at a Veterans Affairs facility in Leavenworth, Kansas. The project number is 589A6-21-702. Questions addressed curtain wall specifications, whether the site superintendent and competent persons could fulfill certain safety roles, the use of a full-time site safety and health officer, staging and storage areas, and which party would bear the cost of submittal exchanges using a file transfer protocol system. Answers indicated that a curtain wall specification section was omitted but the number was provided, that the site superintendent could fulfill certain roles according to specifications, that the site safety and health officer must be full time, that staging would be near specified garages and materials stored inside must be in designated construction areas, and that the general contractor would bear the cost of submittal exchanges.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Questions Project Number 589A6-21-702 EHRM Training Room Leavenworth, KS
Q1: There is new curtain wall/aluminum storefront on this project on pages A105, A301, A302 but there is not a curtain wall specification section. Can you provide spec or clarify what is required for curtain wall?
A1: Curtain wall specification section is 08 44 13 which is not in the specification package.
Q2: Please advise if the designated SSHO and Competent Person role can be fulfilled by the site superintendent?
A2: Specification section 01 35 26 states that the designated SSHO will be from the prime contractor and can be the site superintendent and the CP’s will be from the subcontractors.
Q3: Will the SSHO be full time separate person?
A3: Specification section 01 35 26 states that the SSHO will be a full-time person from the prime contractor.
Q4: Is this project tax exempt?
A4: Yes, this project is tax exempt.
Q5: Please indicate staging area or laydown and material storage locations.
A5: Staging area for trailers and connex type boxes will be near the garages behind building 71. Any materials stored inside the building must be in your designated construction area. Dumper’s locations will be discussed between the COR and the contractor as needed.
Q6: Will the cost for submittal exchange be by VA or GC?
A6: Specification section 01 33 23 calls out that a file transfer protocol file sharing system that can be accessed from the VA computer network. The cost for this will be by the GC.