This document contains a technical questions and response tracking sheet for a federal contract solicitation to replace a seismically deficient resident building at a Veterans Affairs facility. The solicitation number is 36C77621R0004 and involves providing all labor, project management, materials and equipment to complete seismic upgrades to Building 208 at the Southern Oregon Rehabilitation Center and Clinic. Key details include that the contract is set aside for Service-Disabled Veteran-Owned Small Businesses, questions from contractors were received and answered between January 4th and January 25th regarding specifications, drawings and requirements, and the government anticipates making an award some time after mid-February with mobilization to follow.

View the file

Other files

File Type Posted
S05 -Technical Question Tracking Sheet - 1.29.21.docx DOCX document
36C77621R0004 0006.docx DOCX document
36C77621R0004 0005.docx DOCX document
692-349 B208 replacement - Construction fencing and laydown area plan.pdf PDF
B208 Landscape plans.pdf PDF
Technical Question Tracking Sheet - 1.21.21.docx DOCX document
36C77621R0004 0004.docx DOCX document
36C77621R0004 0003.pdf PDF
Site Visit Sign-in Sheet - White City.pdf PDF
Technical Question Tracking Sheet - 1.15.21.docx DOCX document
Technical Question Tracking Sheet - 1.11.21.docx DOCX document
36C77621R0004 0002.docx DOCX document
Attachment 7 - Drawing Part 6.pdf PDF
36C77621R0004 0001.docx DOCX document
Attachment 8 - Drawing Part 7.pdf PDF
Attachment 9 - Drawing Part 8.pdf PDF
White City Solicitation and Attachments.zip ZIP file
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS

AND RESPONSE TRACKING SHEET

Replace Seismic Deficiency Resident Building 208 36C77621R0004

PROJECT TITLE

SOLICITATION #

QUESTION #
QUESTION RECEIVE

DATE

QUESTION ANSWERED

DATE

CONTRACTOR QUESTIONS
VA RESPONSES TO QUESTIONS
1
1.4.21
1.5.21
Proposal Volume I, Factor 3, Past Performance: Will the Government please consider allowing projects completed within the last seven (7) years of the date of issuance of this RFP?
We want offerors with more recent experience. Projects “completed within the past five years” essentially captures experience that is older than 5 years.
2
1.4.21
1.5.21
Proposal Volume I, Factor 3, Past Performance: Relevancy is defined as “New construction in an active campus or related environment involving all the work and progression of a multi-story building…”. Are projects submitted under this factor required to be multi-story
Single story buildings of $5M minimum might not have the same challenges that a multistory does unless the offeror could describe the complexity of their completed single story structure as being equally complex as the subject multi-story building B208.
3
1.5.21
1.11.21
Would the government amend the requirement for “new Construction” in the past performance to include “renovations”? Many VA projects include both renovation and addition (new construction) especially when discussing Seismic upgrades?
At this time we will not be amending past performance to reflect renovations.
4
1.5.21
1.11.21
In the solicitation, on page 10, the offeror is restricted to 3 emails, each of 5MB or less. This is restrictive to content including the schedule. Would the government allow for more than 3 emails with clear labeling if some of the volumes are more than 5MB?
The solicitation requirements will remain the same. 3 emails of 5 mb or less.
5
1.12.21
1.15.21
On Page 10 of 65 of the solicitation, Paragraph (2) Volume I, Sub-Paragraph (a) Format, says Volume I shall not exceed Twenty (20) pages. In Paragraph (5) Volume 1, Factor 3, Past Performance, it states to submit CPARS or PPQ's. Our CPARS and PPQ's could range up to (6) pages each, and could take up (18 pages total). Please confirm the CPARS and PPQ's don't count against the Twenty (20) page limit.
We have reviewed the required and will add and additional 5 pages which move the page limit to 25 pages max which will included cpars and ppq. Anything past the 25 page limit will not be considered.
6
1.12.21
1.15.21
In Paragraph (5) Volume 1, Factor 3, Past Performance, it states to submit CPARS or PPQ's. In addition to the CPARS and PPQ's, is the contractor to submit any additional project write ups/narratives, or will submitting the CPARS and PPQ's meet this Past Performance requirement?
Please refer to 2.7 proposal requiements (B)(4) of the solicitation. This section states what will need to be submitted.
7
1.14.21
1.15.21
If submitting an offer as a Joint Venture Mentor Protégé, will it be acceptable for one member of the Joint Venture to provide all three projects to satisfy the requirements under Factor 3, Past Performance?
If the Offeror is a Joint Venture (JV), relevant past performance shall be submitted for each JV partner and if applicable, the JV itself. Offerors who fail to submit past performance for each JV partner may be rated unacceptable.
8
1.14.21
1.15.21
Are you interesting in allowing other lighting manufactures with equals to bid on your project?
It is the responsibility of all bidders to meet the requirements in the specs. If there is a brand name or equal, it must meet the requirements and will be reviewed by the VA during the submittal phase after award of the project.
9
1.14.21
1.15.21
Do you have a specific substitution request form that you would like me to fill out? I am not seeing this on the Dodge Pipeline or is there a spec and AE should provide for this.
There is no specific form for substitution requests. Bidders may use their own form for substitution requests, which must show equivalency to all characteristics of the specified items. The official solicitation is on beta.sam.gov. We do not intend to verify what is or is not on other websites.
10
1.14.21
1.15.21
Please confirm interior make-up of the windows. On sheet A3.3 of the window details & schedule show a wood interior. Please define wood species and interior finish.
The information is contained in the drawings attached to the solicitation.
11
1.19.21
1.21.21
Is this project sales tax exempt?
No
12
1.19.21
1.21.21
Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project?
Procore is not on the VA’s VIP list for software, but Contractors/Designers have thus far been able to use it without it being stopped.
13
1.19.21
1.21.21
As a result of the effect of COVID-19 throughout the U.S., and the resulting Federal, State and local governments’ responses / requirements of safe distancing and potential advocations of working remotely and/or complete organization closures, please advise how the Government intends to address delays resulting there as it pertains to the current solicitation schedule for this and all future projects.
COVID-19 has provided both hindrances and opportunities for various projects throughout the VISN. The situation of COVID-19 and it’s impacts on supply chain are broadly known at this time. The askers “all future projects” is not applicable to this solicitation.
14
1.19.21
1.21.21
Please confirm that the Commissioning scope is appointed by the VA
The statement is vague. Refer to specifications. VA provides a commissioning agent for the project.
15
1.19.21
1.21.21
The brick specified for this project is a 470-479 Medium Range Smooth brick by Belden. All of the currently and recently replaced buildings on the campus: Bldgs 203, 204, 205, 206, 207, 220, 225/226 and more have used a custom blend of 3 bricks from Mutual Materials. Is building 208 using a different brick than the other new buildings?
Use Mutual Materials, blend thus: (25% Autumn Blend Cross Set, 57% Columbia Red, 15% Ruby, 3% Burnt).
16
1.19.21
1.21.21
HARDWARE GROUP 4

DOES THIS GROUP REQUIRE AN ELECTRIFIED PANIC DEVICE AND IF SO THIS WILL REQUIRE AN EPT – A ELECTRIC HINGE WILL NOT WORK. WHO IS RESPONSIBLE FOR THE POWER SUPPLY – NOT NOTED IN HARDWARE GROUP?

THESE DOORS DO NOT REQUIRE ELECTRIFCATION

17
1.19.21
1.21.21
HARDWARE GROUP 8

a.WHAT TYPE OF LOCK IS REQUIRED?

None Required

18
1.19.21
1.21.21
HARDWARE GROUP 9

a.WHO IS RESPONSIBLE FOR MAGNETIC DOOR HOLDERS?

b. THESE DOORS ARE IN A 1 HOUR RATED WALL – SHOULD THIS GROUP AND ASSOCIATED OPENINGS BE RATED?

The General Contractor is responsible for all work indicated throughout the Construction Documents and it is his responsibility to coordinate work.

YES – 1 HOUR RATED

19
1.19.21
1.21.21
HARDWARE GROUP 10
a.WHAT TYPE OF LOCK IS REQUIRED?
None Required
20
1.19.21
1.21.21
HARDWARE GROUP 14
a.NO EXIT DEVICE NOTED
None Required
21
1.19.21
1.21.21
HARDWARE GROUP 17
a.WHO IS RESPONSIBLE FOR THE POWER SUPPLY – NOT NOTED IN HARDWARE GROUP?
The General Contractor is responsible for all work indicated throughout the Construction Documents and it is his responsibility to coordinate work.
22
1.19.21
1.21.21
1 HOUR FULL GLASS WOOD DOOR WILL NEED A METAL VISION KIT (ANEMOSTAT) AND CAN ONLY HAVE 960 SQUARE INCHES OF GLASS (16 X 60)
a.DOORS ST1NA, ST1SA, ST2N, ST2S
CHANGE TO DOOR TYPE G (1/2 LITE)
23
1.19.21
1.21.21
NO WOOD DOOR SPECIES GIVEN. SHOULD WE MATCH WHAT WAS SUPPLIED AT BUILDING 207? ROTARY WHITE BIRCH – PREFINISHED CLEAR
Yes
24
1.19.21
1.21.21
PLEASE CONFIRM THAT THE VA WILL SUPPLY CYLINDER CORES.
Confirmed, but Contractor shall provide the temporary plastic turners that come with locksets to prevent damage to pins during the time that the cylinders are without cores.
24
1.19.21
1.21.21
What is the projected mobilization date on this project?
The Government anticipates an award date some time after mid-February, 2021. Mobilization would follow some time after award.
24
1.19.21
1.21.21
Will the sign sheet be released?
This has already been posted to beta.sam.
24
1.19.21
1.21.21
Hardware Group HWF-4F does not have an allowance to transfer power from the frame to the door. Would recommend an Electrified Hinge or Power Transfer. Please advise.
PLEASE CLARIFY WHAT HARDWARE GROUP IS BEING REFERED TO. SPECIFICTIONS LIST HARDWARE SETS (GROUPS) 1.0-19.0
25
1.19.21
1.21.21
Can the area to the north (where a building was demolished) be used for additional laydown area?
Yes. Please see attached 692-349 B208 "Construction fencing and laydown area plan" which defines the additional area followed by some minor site work for this Contract.
26
1.19.21
1.21.21
The plans show a B220, but that building is gone now. Can that space be used as laydown area?
Any instance of B220 shown in the construction drawings (example L1.0, L3.0, L4.1) should be marked from such sheets, as this building has been demolished. See response to question above regarding laydown area.
27
1.19.21
1.21.21
During the walk through, the VA said it would provide a drawing showing construction area fencing.
Please see 692-349 B208 replacement - "Construction fencing and laydown area plan".
28
1.19.21
1.21.21
The COR in pre-bid walk-thru said that other piping replacement work would be happening around B208 during that project. How are we supposed to know the extents of that work and the approximate time frame?
See 692-349 B208 replacement - "Construction fencing and laydown area plan". Unfortunately, VA SORCC cannot give exact dates, but we have given the amount of time that the B208 contractor can expect other Contractor work adjacent to the building. B208 Contractor shall move fencing inboard to keep the other Contractor “out of B208 site” during these times. VA SORCC will keep the B208 Contractor informed, but as a minimum, give the notice indicated in 692-349 B208 replacement - "Construction fencing and laydown area plan
29
1.19.21
1.21.21
Does the “piping project” discussed in pre-bid mean that some of the B208 piping work is not needed?
That is correct. For sewer piping, delete the following work from Sheet C1.2: Keyed Note 1 which removes existing manhole, Keyed Note 3 which adds a new manhole, and Keyed note 2, that which installs new sewer line between Keyed Notes 1 and 3. Never-the-less, all utility laterals on C1.2 shall be installed, either to the existing or the new (by others) depending on timing.
30
1.19.21
1.21.21
Will there be an alternate fiber route for B208?
Fiber B208 will not come directly from the demark in B210, but rather it will splice to existing multi-144 count fiber in CC236 data room. From there, it will use existing ductbank only, until it reaches the manhole to the south of B207. From there, it goes north in the ductbank until it reaches the corridor between CC200 and B207, then it goes into innerduct in corridor(s) to the east to reach B208.
31
1.21.21
1.21.21
I apologize, but I do have another question about the asphalt shingles. Is there a particular reason they are calling out for the cool series? The only reason I ask is because we have done a couple buildings at the VA in White City and they were a.) not the cool series and b.) not the color weathered wood. The price difference between the the cool series and GAF Timberline HDZ will be a pretty big difference. Would you like me to just bid it both ways?
Use IKO Cambridge – Color: Vintage Green.
32
1.21.21
1.21.21
I am reviewing these plans for this project and I have a couple questions. In the spec book it calls out for PVC roofing in section 07 54 19 but then when you refer to the Schedule for Finishes 09 06 00 it is calling out for Built -up Bituminous Roofing. Can you please clarify what PVC Roofing manufacture is accepted
Use PVC per 07 54 19
33
1.25.21
1.25.21
We have received a substitution request for the chiller from the mechanical contractors?
A substitution request will not be reviewed at this time, please follow the specifications associated with the solicitation. This request will be part of the submittal review after the project is awarded. Thank you.