36C77621R0001 0001.docx
DOCX document 22 KB Posted
- Attached to
- R405--Terminology Standards Support IDIQ Federal contract opportunity
- Solicitation number
- 36C77621R0001
About this file
This document contains questions and answers regarding a solicitation for terminology standards support services. The solicitation seeks proposals for a single-award IDIQ contract to support the Department of Veterans Affairs' terminology standardization work. Key details include that the incumbent is JP Systems, Inc. and proposals are due on December 16, 2020. The work involves maintaining VA's terminology release schedule and supporting tools, engaging with terminology workgroups, and coordinating with the VA's external partners on interoperability initiatives. Clinical models and content will be transferred to the new contractor for continued maintenance and development.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 10 - Sample BOE.xlsx | XLSX spreadsheet | |
| ATTACHMENT 9 - Sample TBOE.xlsx | XLSX spreadsheet | |
| ATTACHMENT 1 - Terminology PWS_.docx | DOCX document | |
| 36C77621R0001.docx | DOCX document | |
| ATTACHMENT 11 - Business Associate Agreement.doc | DOC document | |
| ATTACHMENT 5 - Contractor Personnel Change Form.doc | DOC document | |
| ATTACHMENT 12 - Past Performance.docx | DOCX document | |
| ATTACHMENT 8 - IDIQ PRICE SCHEDULE.xlsx | XLSX spreadsheet | |
| ATTACHMENT 4 - TMS User Request.doc | DOC document | |
| ATTACHMENT 3 - Travel Authorization Request.doc | DOC document | |
| ATTACHMENT 2 - Quality Assurance Surveillance Plan.doc | DOC document | |
| ATTACHMENT 7 - Labor Categories and Descriptions.xlsx | XLSX spreadsheet | |
| ATTACHMENT 6 - Contractor Staff Roster.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
HI20-62
36C776 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 00076 Department of Veterans Affairs Department of Veterans Affairs 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 To all Offerors/Bidders
36C77621R0001
X X X
X
The purpose of this amendment is to provide answers to questions during the solicitation.
CONTINUATION PAGE
| # |
| Document |
| Section |
| Question |
| Response |
| 1 |
| N/A |
| N/A |
| Who, if any, is the incumbent on the current contract? |
| JP Systems, Inc. |
| 2 |
| 36C77621R0001.docx |
| E.1.2.c Content Requirements Table Row Volume II Past Performance Page 60 |
| Will the Government permit a one-page introduction to Volume II of the Past Performance? |
| Yes |
| 3 |
| 36C77621R0001.docx |
| E.1.2(a)(3) ii(A) and (C) Page 61 |
| Solicitation Document: These paragraphs contain instructions for Past Performance, yet they are in the Resumes section of the RFP. Will the government please confirm that the referenced paragraphs are to be addressed in Volume II Past Performance and not within each resume? |
| The information listed for the resume section provides what, at a minimum each contractor is responsible for submitting in the resumes of each of the key personnel proposed. |
| 4 |
| 36C77621R0001.docx |
| E.1.2(a)(3) ii(A) Page 61, (b)(1) Page 62 Past Performance |
| Paragraph (A) on page 61 states "No more than five (5) contracts", whereas paragraph (1) on page 62 states "Offerors shall submit a list of all contracts". Please clarify the number the number of contracts required in this section. |
| Offerors shall provide no more than five (5) contracts. |
| 5 |
| 36C77621R0001.docx |
| E.1.2(e)(5) i.(A) Solicitation Provisions Page 65 |
| FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) is not included in the RFP yet required by the RFP. Shall offerors use the current version of the FAR to this requirement? |
| The clause is located at E.4 of the solicitation. |
| 6 |
| 36C77621R0001.docx |
| E.4 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) Page 70 |
| The RFP includes the referenced representation but does not direct offerors to complete it. Shall offerors complete 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020) and include it in Vol V? |
| Offers should read the clause and if applicable, complete per the clause. |
| 7 |
| 36C77621R0001.docx |
| E.9.C.1 Technical Evaluation Approach Page 76 |
| Will the Government give credit to offerors for providing a response to PWS 5.0 SPECIFIC REQUIREMENTS? |
| The basis of award and evaluation factors are outlined in the RFP. |
| 8 |
| ATTACHMENT+12+-+Past+Performance.docx |
| N/A |
| There is no reference to "ATTACHMENT 12 - Past Performance" in the RFP. As the Government is assessing CPARs, will the Government please confirm that Past Performance Questionnaires are not required to be sent to be processed by the contacts? |
| Past Performance Questionnaires are required to be submitted by the point of contact completing the questionnaire and are due by the solicitation closing date. |
| 9 |
| Attachment 1, PWS |
| Section 5.6 MED-RT Monthly Maintenance, 5.6.2©, page 44 - 45 |
| Please clarify the intended schedule and composition for MED-RT releases? Historically MED-RT has been published 10 times per year; this PWS calls for monthly “automated pre-releases” and bi-yearly “automated final releases.” Which should be included in this section of the PWS? |
| As noted in section 5.6.3.1 of the PWS, the contractor is required to prepare updates of MED-RT on a monthly basis, even though the number of releases per year is 10. For months when MED-RT is not released, the update will be held and rolled into the next month's update for the subsequent release. |
| 10 |
| 36C77621R0001.docx |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS, page 59, 61 |
| The submission table states there is no page limit for key personnel, however, on page 61 the solicitation states a page limit for each key personnel resume. Please clarify if there is or is not a page limit for key personnel resumes. |
| The page limit for resumes is 4 pages per resume. The total page limit would depend on how many resumes are provided. |
| 11 |
| RFQ |
| General |
| The RFQ states that the proposal is due on Monday, December 16, 2020. However, December 16, 2020 is on Wednesday, can the Government please confirm that the proposal is due on Wednesday, Dec 16, 2020? |
| Confirmed Wednesday, December 16th, 2020 proposals are due. |
| 12 |
| RFQ |
| General |
| Can the government please clarify the minimum and maximum number of past performances that are required in volume 2. |
| See response to question 4. |
| 13 |
| Attachment 9 |
| General |
| If Attachment 9 is the TBOE template, what is the purpose of Attachment 10? |
| Attachment 9 is the Technical Basis of Estimate (TBOE) template, which includes the labor categories and hours and does not contain the labor rates or any buildup of prices. Attachment 10 is the Basis of Estimate (BOE) to include the hourly rates and total price to complete each task. |
| 14 |
| Attachment 7 |
| General |
| The Attachment 7 table headers do not match the RFP requirements in Section. Will the government confirm that the only requirement is to fill out Attachment 7 as provided? |
| All offerors shall provide information in accordance with (a) Volume I Technical Requirements, (1) Labor Categories and Labor Category Description. |
| 15 |
| PWS |
| Section 5.1.2 |
| 5.1.2 What are the tools in use? Is there transition planned for knowledge content transfer to the new awardee. |
| For VA-specific tools and knowledge content, orientation will be provided to the contractor. |
| 16 |
| PWS |
| Section 5.1.3 |
| 5.1.3 Is this a complete tool Listset? Is there SNOMED Refset capability in this list? |
| In addition to the tools listed, there are VA-specific tools that the contractor will use. Orientation to these tools will be provided to the contractor. |
| 17 |
| PWS |
| Section 5.2.2 |
| 5.2.2 What is the methodology and tooling used for this task. |
| In addition to the tools listed, there are VA-specific tools that the contractor will use. Orientation to these tools will be provided to the contractor. |
| 18 |
| PWS |
| Section 5.2.2 |
| 5.2.2 Does it already exist, and will the existing models and tools be transferred? |
| Existing models will be transferred, and new models that do not exist will have to be created. As described in 5.2.2, these models will be based on review of needs motivated by VA needs, such as those demonstrated through analysis of VA Health Factor use and representations. |
These models are representable in a SNOMED compatible format, and will also be represented in the TINKAR format based on the HL7 Terminology Knowledge Architecture effort we are participating in (https://confluence.hl7.org/display/VOC/Standardized+Terminology+Knowledgebase+Project+Calls+and+Meetings).
Tooling for representing these models is currently using the TermSpace application as part of VA’s participation in Solar efforts at Logica Health, and may transition to the Tinkar reference implementation that is part of the HL7 Knowledge Architecture/TINKAR project.
Any SNOMED compatible editing environment that supports Owl Description Logic classification can be used for representing these models.
| 19 |
| PWS |
| Section 5.2.3 (5) |
| 5.2.3 (5) Can the government list the formats expected? |
| RF2 is an acceptable format, as will be the TINKAR format being developed at HL7. |
| 20 |
| PWS |
| Section 5.2.3 (9) |
| 5.2.3 (9) This makes an XML constraint on the tooling which includes XMI as the XML rendering of UML models. What is the precise rendering of existing models? |
| Clinical Assertion Models are also known as Clinical Statement Models, are based on HL7 FHIR observations guided by the HL7 Analysis Normal Form informational ballot document. |
The assertion model can be represented in XML per HL7 FHIR guidelines, and this is different than the SNOMED like concepts that may populate the topic of the Clinical Statement Model.
So, terminology that populates the statement models will be represented in SNOMED RF2 or HL7 TINKAR format, and statements that are represented using FHIR Observation resources can be represented using XML.
| 21 |
| PWS |
| Section 5.4.1 |
| 5.4.1 Will the work of this contract also applies to DoD/Cerner Millennium, in addition to OIT STS? |
| The work on this contract is to support KBS Terminology Services customer. |
| 22 |
| PWS |
| Section 5.4.1 |
| 5.4.1 Is there a working group for which the contract must engage to facilitate coordination of work with DoD? |
| The work on this contract is to support KBS Terminology Services customer. The contractor will be required to engage with any workgroups KBS Terminology has to engage with. |
| 23 |
| PWS |
| Section 5.5.2 (8 |
| 5.5.2 (8) In the example, how will coordination with DoD be achieved? |
| The work on this contract is to support KBS Terminology Services customer. The contractor will be required to engage with any workgroups KBS Terminology has to engage with. |
| 24 |
| PWS |
| General |
| This project has a dependency on patches PX*2*214 being released and installed at sites. Can the government describe what's in these patches? |
| Details on this and other technical dependencies will be discussed with the awardee. |
| 25 |
| PWS |
| Section 5.9 |
| Section 5.9 discusses Health Factors but does not mention Clinical Reminders. Was this an oversight? |
| Health Factors are a component of the Clinical Reminders infrastructure in VistA. |
| 26 |
| PWS |
| Section 5.9 |
| Section 5.9 There is no mention of the interoperability work that is going on within the FEHRM, of which CIDMO has been intimately involved. How is the existing work of KBS being integrated and harmonized with the interoperability work within the FEHRM as well as the configuration work that is being accomplished as part of the existing EHRM efforts? |
| See page 54, Section 5.9.1 Background provides general information describing VA's interoperability needs for collaboration with external partners including DoD. |
End of Document