762-22-101-Submittal Log.pdf

PDF 399 KB Posted

Attached to
Y1AZ--762-22-101: Construction for Physical Security Lunchroom/Foyer
Solicitation number
36C77024R0009
Issued by

About this file

This document is a Submittal Log related to a federal contract opportunity for Building Access & Lunchroom Renovations project 762-22-101 at the VA Consolidated Mail-Order Pharmacy System facility in Tucson, Arizona.

The key details are:

  • The project has an estimated construction magnitude between $2M to $5M and is being solicited as a Service-Disabled Veteran Owned Business (SDVOSB) set aside.
  • Proposals will be evaluated per the Proposal Submittal Instructions for solicitation number 36C77024R0009.
  • The NAICS code is 236220 - Commercial and Institutional Building Construction, with a $45M size standard.
  • All questions are due by 21 August 2024 and must be emailed to robert.gochenour@va.gov.
  • The document provides a comprehensive Submittal Log identifying required submittals across various specification sections, including product data, shop drawings, samples, certificates, test reports, and other documentation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Access & Lunchroom Renovations

762-22-101 (2091.03)

VA Consolidated Mail-Order Pharmacy System

Bid Documents Preliminary Submittal Log

TO DATE SENT

DATE

RETURNED

N O

E X

C E

P T

IO

N T

A K

E N

M A

K E

C O

R R

E C

T

IO

N S

A S

N O

T E

D

R E

V

IS

E A

N D

R E

S U

B M

IT

R E

J E

C T E

D

S U

B M

IT

S

P E

C

IF

IE

D

I T E

M

N O

T R

E V

IE

W

E D

00 01 10 Table of Contents

N/A

00 01 15 List of Drawing Sheets

N/A

01 00 00 General Requirements

N/A

01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build)

Interim Schedule

01 33 23 Shop Drawings, Product Data, and Samples

Preconstruction Submittals

Shop Drawings

Product Data

Samples

Design Data

Test Reports

Certificates

Manufacturer's Instructions

Manufacturer's Field Reports

Operation and Maintenance Data

Closeout Submittals

01 35 26 Safety Requirements

N/A

01 42 19 Reference Standards

N/A

01 45 35 Special Inspections

CONSULTANT ACTION

DATE

RETURNED REMARKSS

P

E C

IF

IC

A T

IO

N S

E C

T

IO

N

S U

B M

IT

T A

L N

U M

B E

R

R E

S U

B M

IT

ITEM DESCRIPTION

DATE

RECEIVED

TBD

PROJECT NAME:

SUBMITTAL LOG

PROJECT NO.:

OWNER:

CONTRACTOR:

10/30/2023

1. SD-01 Preconstruction Submittals;

2. SIOR Letter of Acceptance;

3. Special Inspections Project Manual;

4. Special Inspections Agency's Written Practices

5. NDT Procedures and Equipment’ Calibration Records;

6. SD-06 Test Reports;

7. Special Inspections

8. Daily Reports;

9. Special Inspections; Biweekly Reports;

10. SD-07 Certificates;

11. Fabrication Plant

12. Steel Truss Plant;

13. Wood Truss Plant;

14. AC472 Accreditation;

15. Steel Joist Institute Membership;

16. Precast Concrete Institute (PCI) Certified Plant;

17. Certificate of Compliance;

18. Special Inspector of Record Qualifications;

19. Special Inspector Qualifications;

20. Qualification Records for NDT technicians;

21. SD-11 Closeout Submittals;

22. Interim Final Report of Special Inspections;

01 74 19 Construction Waste Management

In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, and SAMPLES, furnish the following

Demolition Debris Management Plan

Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste

Management Plan

Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling

Target waste diversion rate by material and an overall diversion rate

Final report documenting the results of implementation of the preconstruction waste management plan

01 91 00 General Commissioning Requirements

Preliminary Commissioning Plan

Final Commissioning Plan

Systems Functional Performance Test Procedure

Pre-Functional Checklists

Test and Inspection Reports

Corrective Action Documents

Preliminary Commissioning Report

Final Commissioning Report

Data for Commissioning

07 21 13 Thermal Insulation

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

07 84 00 Firestopping

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Installer Qualifications

Inspector Qualifications

Manufacturer's literature, data, and installation instructions for types of firestopping and smoke stopping used

List of FM, UL, or WH classification number of systems installed

Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use

Submit certificates from manufacturer attesting that firestopping materials comply with the specified requirements

07 92 00 Joint Sealants

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Installer Qualifications

Contractor Certification

Manufacturer's installation instructions for each product used

Cured samples of exposed sealants for each color

Manufacturer's Literature & Data

Manufacturer Warranty

08 11 13 Hollow Metal Doors and Frames

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

Test Reports

Qualifications

Blast Design Calculations

08 14 00 Interior Wood Doors

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

Test Reports

Operation and Maintenance Data

08 31 13 Access Doors and Frames

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

08 34 53 Security Doors and Frames

Shop Drawings

Product Data

Samples

Manufacturer's Standard Color Chart

Certificates

08 35 13.23 Accordian-Folding Fire Access-Control Doors

Shop Drawings

Product Data

Operation and Maintenance Data

08 56 59 Service and Teller Window Units

Shop Drawings

Product Data

Samples

Submittal Drawings

Manufacturer's Literature and Data: Service Windows

Sustainable Construction Submittals

Test Reports

Certificates

08 71 00 Door Hardware

Shop Drawings

Product Data

Samples

Hardware Schedule

Ligature Resistant Door Alarm Riser Diagram

Samples and Manufacturer's Literature

Certificate of Compliance and Test Reports

08 80 00 Glazing

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Manufacturer's Certificates

Manufacturer Warranty

Manufacturer's Literature and Data

Preconstruction Adhesion and Compatibility Test Report

09 05 16 Subsurface Preparation for Floor Finishes

Shop Drawings

Product Data

Test Data

Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer

09 22 16 Non-Structural Metal Framing

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Test Results

09 29 00 Gypsum Board

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Test Results

Certificates

09 30 13 Ceramic/Porcelain Tiling

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Certification

Installer Qualifications

09 51 00 Acoustical Ceilings

Shop Drawings

Product Data

Samples

Submittal Drawings

Manufacturer's Literature & Data

Sustainable Construction Submittals

Certificates

Qualifications

Operation and Maintenance Data

09 65 13 Resilient Base and Accessories

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Sustainable Construction Submittals

Operation and Maintenance Data

09 65 19 Resilient Tile Flooring

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Manufacturer's Literature & Data

Test Reports

09 91 00 Painting

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Painter qualifications

Manufacturer's Literature & Data

Sample Panels

Sample of Identity Markers if used

Manufacturers' Certificates indicating compliance with specified requirements

10 14 00 Signage

Shop Drawings

Product Data

Samples

Manufacturer's Literature

Sign Location Plan

Full Size Layout Patterns

Manufacturer's Qualifications

Installer's Qualifications

Structural Calculations

10 26 00 Wall and Door Protection

Shop Drawings

Product Data

Samples

Sustainable Design Submittals

Manufacturer's Literature & Data

Test Report

Manufacturer's Qualifications

Installer's Qualifications

Manufacturer's Warranty

10 44 13 Fire Extinguisher Cabinets

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

11 14 13.19 Turnstiles

Shop Drawings

Product Data

Selection Samples

Verification Samples

12 24 00 Window Shades

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Fire Testing

Manufacturer's Warranty

12 32 00 Manufactured Wood Casework

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Certification

12 32 00 Countertops

Shop Drawings

Product Data

Samples

13 05 41 Seismic Restraint Requirements for Non-Structural Components

Bracing and Signed and Sealed Anchorage Drawings and Calculations for all Non-Structural Elements Requiring Seismic Restraint

Seismic Protection of Piping Data

Seismic Protection of Suspended Ductwork and Suspended Electrical and

Communication Cables Data

21 13 13 Wet-Pipe Sprinkler Systems

Shop Drawings (Signed by NICET Level III or Level IV Sprinkler

Technician or Stamped by Registered Fire Protection Engineer)

Product Data

Samples

Qualifications

Manufacturer's Data Sheets

Calculation Sheets

Valve Charts

Final Document Submittals (As-built Drawings & Testing and Maintenance

Instructions)

Material and Testing Certificate

Operations & Maintenance Manuals

22 05 11 Common Work Results for Plumbing

Shop Drawings

Product Data

Samples

Phasing Plan/Schedule

Documentation Proving Equivalent Performance, Design Standards and

Drawings

Certification that all Manufacturers have Reviewed Drawings &

Specifications

Manufacturer's Literature & Data

Coordination/Shop Drawings

Rigging Plan

Plumbing Maintenance Data & Operating Instructions

System Readiness Checklist

Training Plans, Trainer Qualifications and Instructor Qualifications

22 07 11 Plumbing Insulation

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Complete Operating & Maintenance Manuals

System Readiness Checklist

22 11 00 Facility Water Distribution

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Complete Operating & Maintenance Manuals

System Readiness Checklist

Training Plans and Instructor Qualifications

22 13 00 Facility Sanitary and Vent Piping

Shop Drawings

Samples

Manufacturer's Literature & Data

Detailed Shop Drawing of Clamping Device and Extensions

Complete Operating & Maintenance Manuals

System Readiness Checklist

Training Plans and Instructor Qualifications

22 40 00 Plumbing Fixtures

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Operating Instructions

System Readiness Checklist

Training Plans and Instructor Qualifications

23 05 11 Common Work Results for HVAC

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Phasing Plan/Schedule

If equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems

Prior to submitting shop drawings for approval, Contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed contract documents, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation

Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together

Mock-ups

Coordination/Shop Drawings

Manufacturer's Literature & Data

Rigging Plan

HVAC Maintenance Data & Operating Instructions

Copies of Approved HVAC Equipment Submittals to the TAB & Cx

Subcontractor

System Readiness Checklist

Training Plans and Instructor Qualifications

23 05 41 Noise and Vibration Control for HVAC Piping & Equipment

Shop Drawings

Product Data

Samples

Manufacturer's Literature & Data

Seismic Restraint Provisions and Bolting

Isolator manufacturer shall furnish with submittal load calculations for selection of isolators, including supplemental bases, based on lowest operating speed of equipment supported

Seismic Requirements: Submittals are required for all equipment an-chors, supports and seismic restraint

23 05 51 Noise and Vibration Control for Boiler Plant

Shop Drawings

Product Data

Samples

Include Noise and Vibration Control Devices with the Equipment Submittal

Certification, Training, and Project Experience Resume of Field Shaft

Alignment and or Dynamic Machine Balancing Technician

Manufacturer's Literature & Data

Complete Operating & Maintenance Manuals

System Readiness Checklist

23 05 93 Testing, Adjusting,and Balacing for HVAC

Shop Drawings

Product Data

Samples

Submit Names and Qualifications of TAB Agency and TAB Specialists within 60 Days after the Notice to Proceed

For use by the Resident Engineer staff, submit one complete set of applicable AABC,NEBB or TABB publications that will be the basis of TAB work

Design Review Report

Systems Inspection Report on Equipment and Installation

Duct Air Leakage Test Report

Systems Readiness Report

Intermediate & Final TAB Reports Covering Flow Balance and

Adjustments, Performance Tests, Vibration Tests & Sound Tests

Include in final reports uncorrected installation deficiencies noted during

TAB and applicable explanatory comments on test results that differ from design requirements

Include in each report the critical path for each balanced branch (air and hydronic). Every branch shall have at least one terminal device damper

100% open.

Prior to Request for Final or Partial Final Inspection, Submit Completed

Test & Balance Report for the Area with Noted Critical Paths

23 07 11 HVAC and Boiler Plant Insulation

Shop Drawings

Product Data

Samples

23 09 23 Direct-Digital Control System for HVAC

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Product Certificates

Licenses

As Built Control Drawings

Operation and Maintenance Manuals

Performance Report

23 36 00 Air Terminal Units

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Certificates

Operation and Maintenance Manuals

23 37 00 Air Outlets and Inlets

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Coordination Drawings

26 05 11 Requirements for Electrical Installations

Shop Drawings

Samples

Maintenance and Operation Manuals

26 05 19 Low-Voltage Electrical Power Conductors and Cables

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Certifications

26 05 26 Grounding and Bonding for Electrical Systems

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Test Reports

Certifications

26 05 33 Raceway and Boxes for Electrical Systems

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Certifications

26 09 23 Lighting Controls

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 24 16 Panelboards

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 27 26 Wiring Devices

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 29 21 Enclosed Switches and Circuit Breakers

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Manuals

Certifications

26 51 00 Interior Lighting

SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS

Shop Drawings

Manuals

Certifications

27 05 11 Requirements for Communications Installations

Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Provide parts list including quantity of spare part

Manufacturer Product Information

Source Quality Control Submittal

Installer Qualifications

Provide delegated design submittals (e.g. seismic support design)

Submittals are required for all equipment anchors and supports. Include weights, dimensions, center of gravity, standard connections, manufacturer's recommendations and behavior problems (e.g., vibration, thermal expansion,) associated with equipment or conduit. Anchors and supports to resist seismic load based on seismic design categories per section 4.0 of VA seismic design requirements H-18-8 dated August, Test Equipment List

Submittal Drawings

Provide sustainable design submittals

Furnish electronic certified test reports to COR prior to final inspection and not more than 90 days after completion of tests

27 05 26 Grounding and Bonding for Communications Systems

Submit in accordance with Section 27 05 11, REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS

Provide plan indicating location of system grounding electrode connections and routing of aboveground and underground grounding electrode conductors

Closeout Submittals

27 05 33 Raceways and Boxes for Communications Systems

Submit in accordance with Section 27 05 11, REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS

Size and location of cabinets, splice boxes and pull boxes

Layout of required conduit penetrations through structural elements

Catalog cuts marked with specific item proposed and area of application identified

Certification

27 11 00 Communications Equipment Room Fittings

Submit in accordance with Section 27 05 11, REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS

Separate submittal into sections for each subsystem containing the following:

1. Pictorial layouts of each Telecommunications Room and Cross

Connection Space (VCCS, and HCCS termination cabinets), each distribution cabinet layout, and TCO as each is expected to be installed and configured.

2. Equipment technical literature detailing electrical and technical characteristics of each item of equipment to be furnished.

Environmental Requirements: Identify environmental specifications for housing system as initial and expanded system configurations.

1. Floor loading for batteries and cabinets.

2. Minimum floor space and ceiling height.

3. Minimum door size for equipment passage.

27 15 00 Communications Structured Cabling

Submit in accordance with Section 27 05 11, REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS

1. Pictorial layout drawing of each // main computer room, // voice

(telephone) equipment room, // network operations room, // antenna headend equipment room, // Demarc room, // telecommunications room, // voice (telephone) operators room // showing termination cabinets, each distribution cabinet and rack, as each is expected to be installed and configured.

2. List of test equipment as per 27 05 11, REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS.

Certifications

Closeout Submittal: Provide document from OEM certifying that each item of equipment installed conforms to OEM published specifications

28 05 00 Common Work Results for Electronic Safety and Security

Shop Drawings

Product Data

Samples

28 05 13 Conductors and Cables for Electronic Safety and Security

Shop Drawings

Product Data

Samples

Manufacturer's Literature and Data

Certificates

Shop Drawings

Wiring Diagrams

Cable Administration Drawings

Project planning documents

Maintenance Data

28 05 26 Grounding and Bonding for Electronic Safety and Security

Submit in accordance with Section 28 05 00, COMMON WORK RESULTS

FOR ELECTRONIC SAFETY AND SECURITY

Shop Drawings

Test Reports

Certifications

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

Submit in accordance with Section 28 05 00, COMMON WORK RESULTS

FOR ELECTRONIC SAFETY AND SECURITY and Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES

Shop Drawings

Certifications

Completed System Readiness Checklists

Coordination Drawings

Manufacturer Seismic Qualification Certification

Source quality-control test reports

28 08 00 Commissioning of Electronic Safety and Security Systems

The commissioning process requires review of selected Submittals that pertain to the systems to be commissioned. The Commissioning Agent will provide a list of submittals that will be reviewed by the

Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP

DRAWINGS, PRODUCT DATA, and SAMPLES for further details.

The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL

COMMISSIONING REQUIREMENTS.

28 13 00 Physical Access Control System

Provide certificates of compliance with Section 1.3, Quality Assurance

Pre-installation and as-built design package

Manufacturer security system product cut-sheets

Manufacturer's certification of Underwriters Laboratories, Inc.

Completed System Readiness Checklists

Group 1 Technical Data Package

Group II Technical Data Package

Group III Technical Data Package

Group IV Technical Data Package

Group V Technical Data Package

FIPS 201 Compliance Certificates

Completed System Readiness Checklists provided by the Commissioning

Agent

28 13 16 Physical Access Control System and Database Management

Certificates of Compliance

Pre-Installation and As-Built Design Package

Manufacturer security system product cut-sheets

Manufacturer's Certification of Underwriters Laboratories, Inc.

28 16 00 Intrusion Detection System

Certificates of Compliance

Shop Drawing and As-Built Design Package

Manufacturer security system product cut-sheets

Manufacturer's Certification of Underwriters Laboratories, Inc.

Completed System Readiness Checklists

28 23 00 Video Surveillance

Certificates of Compliance

Pre-Installation and As-Built Design Package

Manufacturer security system product cut-sheets

Manufacturer's Certification of Underwriters Laboratories, Inc.

Completed System Readiness Checklists

28 26 00 Electronic Personal Protection System

Certificates of Compliance

Pre-Installation and As-Built Design Package

Manufacturer security system product cut-sheets

Manufacturer's Certification of Underwriters Laboratories, Inc.

28 31 00 Fire Detection and Alarm

Drawings

Manuals

Maintenance and Operating Manual

Certifications

File details come from the government source that posted it. Updated .