36C77024R0009 0001.pdf
PDF 207 KB Posted
- Solicitation number
- 36C77024R0009
About this file
This document is a contract amendment for a federal contract opportunity with the Department of Veterans Affairs, Veterans Integrated Service Network 15, regarding construction services for physical security at the Tucson VA CMOP facility. The amendment extends the solicitation period, provides questions and answers, and includes site visit information. The contract opportunity is a Service-Disabled Veteran Owned Business (SDVOSB) set-aside with a NAICS code of 236220 - Commercial and Institutional Building Construction, estimated construction value between $2M to $5M. Key details include:
The solicitation number is 36C77024R0009 for project 762-22-101, and the amendment extends the due date for offers to September 11, 2024 at 3:00 pm local time. The amendment addresses topics such as tax exemption, staffing roles, performance factors, procurement timelines, access control and intrusion detection system integration, turnstile specifications, and other technical and administrative details. A site visit was conducted, and additional documents such as an asbestos abatement survey and wage determinations are provided.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
NCO 15 Contracting Ofc - CMOP
1 6
762-22-101
36C770
Department of Veterans Affairs NCO 15 Contracting Ofc - CMOP 3450 S. 4th St. Trafficway
Leavenworth KS 66048-5012
36C770
Department of Veterans Affairs NCO 15 Contracting Ofc - CMOP 3450 S. 4th St. Trafficway
Leavenworth KS 66048-5012
To all Offerors/Bidders
36C77024R0009
09-05-2024
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 9/11/2024 3:00 pm local time
X
The purpose of this amendment is to extend the solicitation period, so that offers are now due 11 September 2024, 3PM local time. Additionally, this amendment incorporates the vendor questions/answers, and site visit information.
See the attached documents to this amendment for all additional details.
Christina Smith Contracting Officer
QUESTIONS AND ANSWERS
1. Is this project tax-exempt? If yes, will a certificate be issued?
RESPONSE: Yes and yes.
2. Can the superintendent double hat as either SSHO or QC?
RESPONSE: Superintendent/SSHO/QCM can fill more than one role, if qualified.
3. Can the superintendent triple hat as SSHO and QC?
RESPONSE: Superintendent/SSHO/QCM can fill more than one role, if qualified.
4. The proposal review states two factors.
a. Factor 1: Relevant Past Performance of the Prime Contractor. (Factor requirements are detailed on page 39).
b. Factor 2: Technical Qualifications of Proposed Staffing. (Page 40 has Factor 2 as
Technical Construction Experience of Prime Contractor).
c. Can you clarify Factor 1 and Factor 2 requirements?
RESPONSE: The same projects can be utilized with either factor. Please note the different information requested for each.
5. Will the VA issue a Limited Notice to Proceed depending on long lead item procurement?
RESPONSE: Yes.
6. Will the doors marked for access control require an integration with the Intrusion detection system (BOSCH-D9412GV4) RESPONSE: Yes. The Door position switch needs to report to the IDS. Note that the IDS for both sets of double doors for the Entry Vestibule 101 are to be programmed with anti-prop alarm to the C-Cure program/monitoring.
7. The turnstiles model(ALVARADO SU5000) comes in various sizes please specify the following characteristics for the turnstiles, panel height (glass doors) 35", 46" or 69" RESPONSE: Drawings call out full height glass optical turnstiles, Specification call out Aeroturn with 72” high barriers panels as basis of design. Provide tallest panel per selected manufacturer for all turnstiles.
8. Please provide the specific model Standard 28" passageway or ADA 36" passageway for the turnstiles width.
RESPONSE: Drawings show 36” wide turnstiles, Provide ADA 36” passageway for all turnstiles.
9. The intrusion panel (BOSCH-D9412GV4), on the plans is referred to as an ACS control panel? TY100, Note 5. Please specify which system is the actual ACS system?
RESPONSE: C-CURE is the current ACS system.
10. Please verify the current system the customer has on site? Is it a CCURE 9000 Rev 3.+?
RESPONSE: Yes, C-CURE 9000 Rev 3.
11. Will the IDEMIA MPH-AC006A also require onsite storage?
RESPONSE: Re: TY-600. C-03 on the SSTV Schedule.
12. The BOD: BOSCH-D9412GV4 is discontinued please specify an alternative replacement.
RESPONSE: Newer Bosch equivalent.
13. There is KP symbol shown on legend and at least one will come with the intrusion panel.
Where is it to be installed? There is no symbol located.
RESPONSE: Reception at the SCC workstation.
14. The customer is requesting a Genetec VMS solution however, ADVC-VEFR, ADVC-
CENTLIC
RESPONSE: TN-series drawing sheets and narrative address two separate systems to be implemented: A Video Management System (VMS) and a Physical Security Information Management System (PSIM).
The Basis of Design (BOD) for the VMS is American Dynamics’ Victor, complete with VideoEdge NVRs. The VMS will also incorporate behavior, facial, and license plate reader analytics. A.D. Victor is an integration partner with Genetec.
The BOD for the PSIM is Synergis IX, in which devices are designed to work with the Genetec Security Center platform to unify access control, intrusion detection, video surveillance, communications, and BMS monitoring together under one management system. An alternate BOD for PSIM is Network Harbor’s “Lighthouse”.
However, these are only BODs. Contractor to present VMS and PSIM submittals compatible with Genetec Security Center, v5.11 and C-CURE 9000, v3.00, as well as all video analytics upgrades.
15. Are licenses for American Dynamics systems? Are you needing the equivalent solution these licenses offer but a genetec alternative?
RESPONSE: Licenses to be provided for all new/updated/modified hardware and/or software.
16. The Metrasense weapons detection system will this system be tied to both the CCURE and Genetec systems? Or just the Genetec system?
RESPONSE: This needs to be fully integrated into the PACS as well as the PSIM for the SCC. The operational process is that whenever a positive read is made by the Metrasens screener, it sends an alarm signal to the PSIM, as well as disables the interior double door PACS use via C-cure, until an “all clear” is authorized by the Security Control Center (reception desk).
17. The drawings show Alvarado Turnstiles, while the specs show Aeroturn. Can we get clarification?
Will the turnstiles need baseplates to assist in providing pathways and/or covering any conduit or core drilling?
RESPONSE: Coordinate with Turnstile Manufacturer.
18. On TN100, may we get clarification on:
Note 2 – are we providing a workstation with these listed licenses as a standalone item, or integrated with existing systems? Provide licensing and integrate into SCC via
PSIM.
Note 3 – what is meant by existing VMS to be upgraded?
RESPONSE: The existing VMS should be upgraded to allow for video analytics capabilities as listed in contract documents.
19. Will the Site Supt., if duly qualified, also be allowed to serve in the roles of SSHO &CQC, or will a separate individual be required for either of those roles?
RESPONSE: See response to questions #2 & #3.
20. Specification Section 01 00 00, Part 1.6-I – Will the VA clarify the number of days required for the VA CMOP to re-occupy space already completed in previous phases?
RESPONSE: The phasing will require good communication between the VA and contractor, and VA acceptance of the space. If VA accepts the phase, then the contractor will have immediate access to the next phase.
21. Specification Section 01 32 16.15, Part 1.6-D mentions Asbestos Abatement. Does the VA expect the Contractor to encounter any ACM during the course of this project? If so, will the VA provide a current HAZMAT Survey?
RESPONSE: See attached report.
22. Specification Section 01 35 26, Part 1.13 requires all workers to have pre-placement TB tests. Will the VA clarify if this will be required for this project?
RESPONSE: Not required for the project.
23. Specification Section 01 45 29, Part 1.1 states that the Testing Laboratory will be retained by the VA. Will the VA clarify whether the Testing Laboratory will be hired by the Contractor or by the VA?
RESPONSE: Contractor.
24. Specification Section 01 91 00, Part 1.9 states that the VA will hire the Commissioning Agent. Will the VA confirm that they will hire the CxA by separate contract and that this will not be a cost to the Contractor?
RESPONSE: Not a cost to the contractor. VA has a commissioning agent contracted.
25. What is the prevailing wage for Carpenters? It is not showing on the Prevailing wage sheet.
Thank You RESPONSE: See attached.
26. The existing locker are scheduled to be removed and reinstall. Is there a place inside the building where the lockers can be stored during construction?
RESPONSE: Negative, would have to be within the construction area or exterior laydown area (protected from damage by weather, etc.).
27. Where on the site will the construction laydown area be located?
28. In the lady’s restroom there are (2) breast feeding closets. Are they to be relocated or stored for future use?
RESPONSE: Disposed of.
29. How will the existing cameras in the lunch room be taken offline? Are they to be protected and stay in place or removed and reinstalled?
RESPONSE: Re: keynote 15 on sheet TY100.
30. How is the access through the turn stile to be address during construction? Is an alternate access route needed?
RESPONSE: If you are referring to staff accessing the turnstiles through the lunchroom, VA will provide an alternative route through the foyer and administrative hallway.
31. What should the contractor anticipate doing in preparing to remove the demolition debris for disposal? Will a dumpster be allowed inside the compound or is it stage offsite?
RESPONSE: See attached laydown area and temp space that will be available to the contractor.
32. What doors are to be used to remove debris and bring in materials?
RESPONSE: It depends on the phase and contractor’s work plan, but doors will be available within the work area.
33. Due to the area being secured, once the construction begins - how is the contractor to maintain the secured areas?
RESPONSE: Contractor is responsible for securing the construction area from the exterior and from the construction work area to the VA space.
34. How is the is inspection of the contracted work conducted? Who performs it?
RESPONSE: Conducted and performed by VA staff or VA contractors.
35. What are the requirements for badging for project access
RESPONSE: Temporary badges or PIV badges will be provided to key personnel.
36. Is there an Abatement survey.
37. Does the Facility have an onsite location for recycling ORM.
RESPONSE: Negative.
38. Page 1 of the solicitation box 8 does not list the complete address.
RESPONSE: 3675 Britannia Drive, Tuscon AZ 85706-5041.
39. Can a teaming partner post the bid bond in their name for the prime contractor to meet the bonding requirements.
RESPONSE: No, bonds must be in the name of the prime contractor.
See attached document: 23115- VHA CMOP ACM Inspection Report.
See attached document: Laydown areas and lunch area.
See attached document: Wage Determination AZ20240040.
See attached document: 762-22-101_Tucson_CMOP_Pre-Bid_Photos_08162024.
See attached document: 762-22-101_Tucson_CMOP_Pre-Bid_Attendance_08162024.
See attached document: 762-22-101_Tucson_CMOP_Pre-Bid_Agenda_08162024.