This document contains questions and answers from a pre-proposal conference for an expansion project at the Mid-South CMOP. The project involves expanding Meds by Mail operations and is identified as number 764-21-101 with solicitation 36C77023R0003 from the Department of Veterans Affairs VHA VISN 15. Space will be made available near loading docks and on the mezzanine for contractor use, including temporary offices furnished by contractors. Parking and forklift access will be provided. The VA will clear the work area prior to construction. Contractors must use VA PIV badges or visitor badges for site access. Modular offices are not acceptable due to security and privacy preferences. The deadline for submitting additional questions is February 21.

View the file

Other files

File Type Posted
36C77023R0003 0003.docx DOCX document
Pre-Bid_Sign-In.pdf PDF
36C77023R0003 0002.docx DOCX document
36C77023R0003 0001.docx DOCX document
Attachment_3_Past_Performance_Questionnaire.pdf PDF
Floor_Plan.pdf PDF
36C77023R0003_1.docx DOCX document
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Meds by Mail Expansion at Mid-South CMOP Project Number: 764-21-101 Solicitation Number: 36C77023R0003

PRE-PROPOSAL CONFERENCE QUESTIONS

February 8, 2023

1. Question – What is the City of Murfreesboro fee for the construction permit?

Answer – Per the City of Murfreesboro, the fee is in accordance with the below schedule.

2. Question – Will a lay-down area be available?

Answer – Yes, space near the dock and/or on the mezzanine will be available for temporary storage. The VA is not responsible for the security of the storage.

3. Question – Will parking spaces be provided?

Answer – Yes, parking spaces will be available on-site. There will no specially dedicated spaces for Contractors.

4. Question – How can materials and equipment be transported to the job site?

Answer – Docks can be utilized. A forklift can be used for larger materials and lifted through the mezzanine railing. The forklift and its operation are the responsibility of the contractor. There is also a passenger elevator that is very limited in capacity.

5. Question – How will contractors access the building?

Answer – The plan is for the Contractor to utilize VA PIV badges if they already possess them, or to acquire badges for specific individuals that will be on the job long term through the background check process. The VA PIV badges will be activated to allow for access to the job site. Additional Contractors will be issued visitor badges or escorted by those possessing VA PIV badges. The access point to the building will likely be the northside production floor entrance.

6. Question – Is office area available?

Answer – No existing offices are available. However, Contractors can bring furnishings to establish a temporary workspace on the mezzanine.

7. Question – Is there public Wifi available for use?

Answer – No, the only Wifi is the VA network, which is restricted to VA equipment.

8. Question – Will contractors be permitted to use the second-floor restrooms?

Answer – Yes, but they must be utilized respectfully, or access will be removed.

9. Question – Is the VA or Contractor responsible for clearing the job-site prior to construction?

Answer – VA will remove the existing material storage and clear the job-site prior to construction.

10. Photos – Below are photos of the work area, existing electrical, and existing plumbing.

Received February 13, 2023

Question: Is a bid for modular offices acceptable? Modulars offer quicker, cleaner, and less cost over conventional methods of installation, ability to move or modify them if/as required and long lasting.

Answer: Negative, the VA prefers the design for security and privacy reasons.

If you had a question that is not noted or have additional questions, please submit by the due date of February 21 @ 12:00 PM CDT to Angel Waalkes, angela.waalkes@va.gov.

Mezzanine

Existing Electrical on Mezzanine

Room 208

Room 110

File details come from the government source that posted it. Updated .