M-002 RO SYSTEMS ONE LINE FLOW DIAGRAMS.pdf
PDF 183 KB Posted
- Attached to
- REVERSE OSMOSIS MAINTENANCE SERVICE BASE PLUS 4
- Solicitation number
- 36C26326Q0709
About this file
This document is a record drawing for a reverse osmosis (RO) system replacement project at ICVA Health Care System. The one-line flow diagram, dated January 3, 2023 and revised February 1, 2024, was prepared by Fourfront Design, Inc. for the Office of Construction and Facilities Management. The drawing illustrates a fully sprinklered new RO system configuration with multiple treatment stages including particulate filters, UV disinfection, water softening, carbon filtration, endotoxin filtration, deionization, and a blending valve system.
The system design incorporates various components specified for isolation and removal from the piping system, including stainless steel shutoff valves (SOV), check valves, pressure gauges, thermometers, and flow meters ranging from 0-100 GPM (Hydronix) to 0-80 GPM (Blue-White). Water enters through copper piping, transitions to Schedule 80 PVC RO piping, and routes through RO storage tanks and distribution systems. The diagram includes sanitary sample ports, vacuum breakers, and provisions for ozone injection via Colder fittings. The contractor is required to add unions on both sides of each equipment unit for isolation and removal purposes. This drawing represents 100% construction documents classified as record documents conforming to marked-up prints and field changes made during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26326Q0709 0003.pdf | ||
| M-120 NEW RO DISTRIBUTION ISOMETRIC VIEW.pdf | ||
| M-003 MECHANICAL SCHEDULES AND DETAILS.pdf | ||
| M-110 BASEMENT NEW RO PLAN AREA B.pdf | ||
| QUESTIONS AND ANSWERS.docx | DOCX document | |
| Wage Determination.pdf | ||
| 36C26326Q0709 _.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FM
DISTRIBUTION PUMP
FLOW METER
(VISUAL)
STAYED 3 GPM
FLOATS TIED BACK TO RO UNIT
FOR ON/OFF OPERATION
TANK AREA
FLOATS ARE FLOAT
AND TRANSDUCER
SS PRV
RO PUMP
PARTICULATE
FILTER
SOV
DRAIN
SOV
CHECK
VALVE
RO UNIT
CARBON
FILTER
SOV RPZ BFP
SOV
CHECK
VALVE
CHECK
VALVE
T-MIXING
VALVE
RO RETURN
3/4" PLASTIC
3/4" DCW 3/4" DHW
SOV
SOV
DRAIN
ALL PIPING SHOWN 3/4" EXCEPT THE
RETURN LINE FROM SYSTEM IS 1"
PLASTIC PIPE
INLINE
PARTICULATE
FILTERS
UV DISINFECTSOV
3/4" TO 2"
INCREASER
SOV
2" RO TO
SYSTEM
RO STORAGE TANK RO STORAGE TANK
RO STORAGE TANK
2" ROS TO
SYSTEM
ENDOTOXIN
FILTER
RO PUMP
PARTICULATE
FILTER
SOV
DRAIN
SOV
RO UNIT
CARBON
BACKWASH
FILTER
SOV RPZ BFP
CHECK
VALVE
CHECK
VALVE
RO-1
BLENDING
VALVE
1" DCW 1" DHW
SOV
DEIONIZER
2" ROR
FROM
SYSTEM
FM
SOV
PRESSURE GAUGE (TYP)
THERMOMETER (TYP)
P
P
UV
DISINFECT
WATER
SOFTENER
BYPASS
EQUIPMENT SHOWN WITHIN
DASHED OUTLINE INCLUDED IN
RO EQUIPMENT PACKAGE
1" VALVE W/ PARK QC FITTING,
CAPPED
FM
HYDRONIX 0-100 GPM FLOW
METER (VISUAL)
BLUE-WHITE
0-80 GPM FLOW
METER (VISUAL)
END OF COPPER
WATER PIPING
SOVSOV
START OF SCH 80
PVC RO PIPING
SOV
SOV
STAINLESS
STEEL SOV
SOV
SOV
CHECK
VALVE
STAINLESS
STEEL SOV
STAINLESS
STEEL SOV
GENERAL PLUMBING NOTE:
CONTRACTOR TO ADD UNIONS ON BOTH
SIDES OF EACH EQUIPMENT UNIT FOR
ISOLATION AND REMOVAL FROM PIPING
SYSTEM. UNIONS NOT SHOWN ON THIS
PLAN FOR CLARITY.
SOV
SOV
VACUUM
BREAKER
VACUUM
BREAKER
STAINLESS STEEL SANITARY
SAMPLE PORT
COLDER FITTING
FOR OZONE
INJECTION
EXISTING RO SYSTEM ONE LINE FLOW DIAGRAM
SCALE: NTS
M002
Drawing Title
COR Project Engineer
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.Revisions: Date
CONSULTANTS: ARCHITECT 636A8-22-004
01 / 03 / 2023
Office of Construction and Facilities Management of
REPLACE RO SYSTEMS
RECORD DOCUMENTS
ICVA HEALTH CARE SYSTEM
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOUR FRON T
D E S I G N I N C .
Phase
FULLY SPRINKLERED
15RD PM/JB
RECORD DOCUMENTS 02/01/2024
THESE RECORD DOCUMENTS CONFORMING TO THE
MARKED-UP PRINTS, DRAWINGS AND OTHER DATA
FURNISHED TO THE DESIGN PROFESSIONAL BY THE
CONTRACTOR. THIS SET OF RECORD DOCUMENTS WILL
SHOW THE REPORTED LOCATION OF THE WORK AND
SIGNIFICANT CHANGES MADE DURING THE
CONSTRUCTION PROCESS. THESE RECORD
DOCUMENTS ARE BASED ON THE INFORMATION
PROVIDED BY OTHER PARTIES WHICH WILL BE
ASSUMED RELIABLE. THE DESIGN PROFESSIONAL HAS
NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS
OF THIS INFORMATION AND SHALL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
MAY BE INCORPORATED HEREIN AS A RESULT.
M-002
RO SYSTEMS ONE LINE FLOW
DIAGRAMS
MICHAEL WILCOX
100% CONSTRUCTION
DOCUMENTS
NEW RO SYSTEM ONE LINE FLOW DIAGRAM
SCALE: NTS
M002
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
File details come from the government source that posted it. Updated .