QUESTIONS 1.docx
DOCX document 2 MB Posted
- Attached to
- FIRE PUMP SERVICES FOR IOWA CITY VAMC
- Solicitation number
- 36C26326Q0436
About this file
This file is a Questions and Answers document and inspection report related to a fire protection services solicitation for the Iowa City VA Medical Center (VAMC).
The Q&A addresses inquiries regarding the scope of work, which encompasses inspection, testing, maintenance, and flow procedures for standpipe, wet sprinkler, and dry sprinkler systems across nine buildings (numbered 1, 2, 7, 20, 40, 41, 42, 49, and 50) on the Iowa City campus. Respondents requested inventory counts of wet sprinkler systems, dry sprinkler systems, Fire Department Connections (FDCs), and standpipe systems, as well as access to previous annual inspection reports. The government confirmed that annual Fire Alarm Inspection and Annual Fire Pump Inspection reports are available, and noted the presence of two anti-freeze systems in Buildings 1 and 20, plus two dry systems in Building 1. The file includes a completed inspection report dated June 7, 2025, prepared by inspectors Mark Evans and Andy Bell from Vrban Fire Protection for the VAMC facility at 601 Highway 6 West, Iowa City, Iowa. The report documents a comprehensive inspection of dry pipe fire sprinkler systems, including evaluation of system components, FDC condition, piping integrity, sprinkler condition, and maintenance procedures such as alarm testing, low pressure alarm testing, air pressure testing, and backflow preventer validation. The inspection covers 90 inspection points addressing system functionality, safety device operability, and compliance with maintenance standards applicable to freezing weather conditions and annual maintenance requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26326Q0436.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The scope references inspection, testing, maintenance, and flow for standpipe, wet sprinkler, and dry sprinkler systems across buildings listed as 1, 2, 7, 20, 40, 41, 42, 49, and 50.
0. Can you confirm whether these correspond to separate building numbers?
Yes, these correspond to separate building numbers all contained on the same Iowa City campus.
1. Is there an available inventory or count of the following systems across these buildings:
1. Wet sprinkler systems
1. Dry sprinkler systems
1. Fire Department Connections (FDCs)
1. Standpipe systems See Question 3 answer.
1. Are previous annual inspection reports available for review? If so, could you please provide access or indicate how they may be obtained?
Annual Fire Alarm Inspection & Annual Fire Pump Inspection 2 Anti-Freeze Systems (Building 1 & 20) 2 Dry Systems in Building 1
1. Please confirm the number of sprinkler systems in the building? Also, if a copy of the most recent annual inspection report is available, it would be very helpful.
See question 3 answer.
image1.emf
VAMC 6-7-25 Annual Inspection.pdf
Date Of This Inspection: Inspector: Inspection Contract #:
Occupant Business Name:
Street Address:
City: State: Zip:
Phone: Email:
Contact Person Name:
Authority To Approve Work: yes no n/a
Name of Supervisory Alarm Company: Phone:
Date of Last Inspection:
Owner's Section Yes No
1. Is the building occupied?
2. Has the occupancy classification and hazard of contents remained the same since the last inspection?
3. Are all water based fire protection systems in service?
4. Has the system remained in service without modifications since the last inspection?
5. Was the system free of actuation of devices or alarms since the last inspection?
Serviceable FDC Check
Approximate year quick response sprinkler heads installed.
Approximate year standard response sprinkler heads installed.
Approximate year dry sprinkler heads installed.
Room Number or Areas Unable to Visually Inspect:
Comments:
Inspector's Signature:
Report Of Inspection Of Water Based Fire Protection Systems
The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed herein is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc. of the component parts is not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information .
Prior Inspection Company:
06/07/2025 07:00am CDT Mark Evans, Andy Bell 41005678
VAMC
601 Highway 6 West
Iowa City IA
(319) 688-3529 Stacy.Speas@va.gov
Stacy Speas
6-2025 Vrban Fire Protection
Date: Inspector Name:
Name of Inspected Property:
Address: City: State:
Location in Site:
Inspection Frequency: Monthly Quarterly Annually Other
Y N/A N 1 System in service on inspection 2 Supply (water) gauge pressure psi 3 System (air) gauge pressure psi 4 Quick opening device gauge pressure psi 5 Gauge near compressor psi 6 Gauge pressures are normal 7 Control valves in normal open or closed position 8 Control valves properly locked or supervised 9 Control valves accessible
10 Control valves provided with appropriate wrenches 11 Control valves free from external leaks 12 Control valves identification signs in place 13 System control valve sign indicates area served 14 Backflow prevention assembly valves are locked or electrically supervised in open position 15 Reduced pressure backflow prevention assembly not in continuous discharge 16 Dry pipe valve free of physical damage 17 Dry pipe valve trim valves are in appropriate open or closed position 18 Dry pipe valve intermediate chamber not leaking
19 System in service on inspection 20 Hydraulic nameplate attached and legible 21 Alarm device free from physical damage 22 FDC is visible 23 FDC is accessible 24 FDC swivels/couplings undamaged/rotate smoothly 25 FDC plugs/caps in place/undamaged 26 FDC gaskets in place and in good condition 27 FDC identification sign in place 28 FDC check valve not leaking 29 FDC automatic drain valve in place and operating properly 30 FDC clapper is in place and operating properly 31 FDC interior inspected where caps missing 32 FDC obstructions removed as necessary 33 Pressure reducing control valves (PRV) indicate open 34 PRV not leaking 35 PRV maintaining downstream pressure per design 36 PRV in good condition 37 PRV hand wheel installed and not broken 38 Alarm panel clear
Report Of Inspection, Testing & Maintenance Of Dry Pipe Fire Sprinkler Systems
INITIAL INSPECTION OF DRY SPRINKLER RISER ASSEMBLY
FIRE DEPARTMENT CONNECTION
06/07/2025 07:00am CDT Mark Evans, Andy Bell
601 Highway 6 West Iowa City IA
Front Entrance
NA
39 Water flow alarm tested and is operational 40 Test conducted with inspector's test connection 41 Test conducted with bypass connection (freezing weather) 42 Test conducted per manufacturer's instructions 43 Alarm devices appear free of physical damage
45 Signal restored only when valve returned to normal position (semi-annual) 48 Priming water level tested 49 Quick opening device(s) (QOD) tested 50 Low pressure alarm tested at psi 51 Three year air test conducted - date
52 System in service on inspection 53 Hangers and seismic bracing appears undamaged and tightly attached 54 Piping appears free of mechanical damage 55 Piping appears free of leakage 56 Piping appears free of corrosion 57 Piping appears properly aligned 58 Piping appears free of external loading 59 Sprinklers appear free of leakage 60 Sprinklers appear free of corrosion 61 Sprinklers appear free of foreign materials 63 Sprinklers appear free of physical damage 64 Sprinklers appear properly oriented 65 Sprinkler spray patterns appear free of unacceptable obstructions 66 Glass bulbs appear full of liquid 67 Spare sprinklers are of proper number (at least 6), type and temperature rating
71 Building is secure such as not to expose piping to freezing conditions 72 Adequate heat is provided maintaining temperature at 40° F or higher - Vrban Fire Protection, Inc. not responsible
73 System in service before conducting maintenance 74 Pertinent parties notified before conducting maintenance 75 Valve completely closed and reopened 76 Leaks resulting in air pressure losses greater than 10 psi/week located and repaired 77 Dry pipe valve interior thoroughly cleaned and parts replaced/repaired as necessary 78 Grease or other sealing materials not applied to seating surfaces of dry pipe valve 79 Known dry pipe system low points drained after operation and before onset of freezing weather conditions one-fifth from normal position (semi-annual)
SPRINKLERS - PIPING - HANGERS
Sprinklers appear free of paint
Spare sprinklers stored where temperature maximum is 100° F
One main drain test conducted downstream from backflow preventer One main drain test conducted downstream from pressure reducing valve
Wrench available for each type of sprinkler
PRIOR TO FREEZING WEATHER
ANNUAL MAINTENANCE FOR DRY PIPE SPRINKLER SYSTEM
Dry pipe valve in good condition internally (check at trip test)
ANNUAL - ALARM, LOW AIR, DRAIN & TRIP TESTS
Supervisory switch initiates distinct signal during 1st two hand wheel revolutions or before valve stem moved
Report of Inspection, Testing & Maintenance of Dry Pipe Fire Sprinkler Systems…continued
6-2025
80 Adequate drainage provided before flow testing or draining 81 Dry pipe valve trip tested with control valve partially open (required at full flow every 3 years) 82 Dry pipe valve protecting freezers trip tested in manner not introducing moisture into piping in freezer 83 Tag or card showing trip test date and name of person and organization conducting test attached to DPV
Separate records of initial air and water pressure, tripping air pressure and dry pipe valve operating conditions maintained on premises for comparison
85 Records of tripping time maintained for full flow trip tests 86 Automatic air pressure maintenance devices tested in accordance with manufacturers instructions 87 Backflow preventer assembly forward flow test conducted 88 System demand flow was achieved through the device 89 Forward flow test conducted at maximum rate possible (only where connections do not permit full flow test) 90 Forward flow test conducted without measuring flow (device </= 2" and outlet sized to flow system demand)
Backflow prevention assembly internal inspection conducted (where shortages last more than 1 year and rationing enforced by AHJ)
92 Forward flow test satisfied by annual fire pump flow test 93 Backflow preventer performance test conducted as required by the AHJ 94 PRV control valves partial flow test conducted and adequate to unseat valve 95 Low temperature alarm tested at beginning of heating season (where provided for valve enclosure) 96 Pertinent parties notified of test conclusion 97 Alarm panel clear 98 System returned to service 99 Comments
ANNUAL TESTING FOR DRY PIPE SPRINKLER SYSTEMS
Report of Inspection, Testing & Maintenance of Dry Pipe Fire Sprinkler Systems…continued
TRIP TEST TABLE
Dry System # Serving Drain Test Static Residual Dry Valve Size Year QOD Year
Make Model Serial # Make Model Serial #
Dry Pipe Operating Test Time to Trip
Thru Test Pipe
Water Pressure
Air
Trip Point Air Pressure
Time Water Reached Test
Outlet
Alarm Operated
Min Sec PSI PSI PSI Min Sec Yes No Without QOD With QOD
Main Front Entrence 165 145
Tyco DPV-1 0017
:02 165 41 29 :05 Yes
Inspector Name: Date:
1 System in service on inspection 2 Hangers & seismic bracing appear undamaged & tightly attached 3 Piping appears free of mechanical damage 4 Piping appears free of leakage 5 Piping appears free of corrosion 6 Piping appears properly aligned 7 Piping appears free of external loading 8 Building is secure such as not to expose piping to freezing conditions (prior to freezing weather) 9 Adequate heat is provided maintaining temperatures at 40° F or higher (prior to freezing weather)
10 *Pump shaft end play within specified tolerances 11 *Pressure gauge and sensor accuracy verified to be within 5% 12 *Pump coupling alignment within specified tolerance 13 *Electrical connections tightened as necessary 14 *Mechanical moving parts lubrication verified (excluding starters & relays) 15 *Pressure switch setting calibration verified 16 *Fuel tank vents & overflow piping free from obstructions 17 *Fuel piping in good condition 18 * Combustion air ductwork and louvers in good condition 19 *Exhaust system hangers and supports in place and in good condition 20 *Electrical control and power wiring connections checked for tightness 21 Fire pump assembly maintenance performed in accordance with mfg. recommendations 22 Alarm panel clear
23 System in service before conducting maintenance 24 Pertinent parties notified before conducting maintenance 25 Operating stems of OS&Y (including backflow) valves lubricated 26 All valves including butterfly, PIV & OS&Y completely closed and reopened 27 Adequate drainage provided before flow testing 28 Main drain test conducted 29 Supply water gauge reading before flow (static) psi 30 Gauge reading during stable flow (residual) psi 31 Time for supply pressure to return to normal sec 32 Fire pump assembly maintenance performed in accordance with mfg. recommendations 33 *Pump bearing lubricated 34 *Gauges recalibrated or changed (when 5% or more out of calibration) 35 *Wet pit suction screens checked (cleaned as necessary) after every operation 36 *Mechanical transmission coupling lubricated 37 *Mechanical transmission right-angle gear drive lubricated 38 *Electric drive motor bearings lubricated 39 All diesel maintenance performed by certified personnel 40 Jockey pump on psi 41 Jockey pump off psi 42 Fire pump on psi 43 Pertinent parties notified after conclusion of maintenance 44 Alarm panel clear 45 System returned to service 46 Comments:
Report Of Inspection, Testing & Maintenance of Fire Pump Assemblies
ANNUAL INSPECTION FOR FIRE PUMP ASSEMBLIES
ANNUAL MAINTENANCE FOR FIRE PUMP ASSEMBLIES
Report of Inspection, Testing & Maintenance of Fire Pump Assemblies…continued
VAMC 601 Highway 6 West Mark Evans, Andy Bell 06/07/2025 07:00am CDT
:05
47 System in service before testing 48 Forward flow test satisfied by annual fire pump flow test 49 Backflow prevention assembly performance test conducted as required by the AHJ
51 Flow test conducted under minimum, rated, and peak fire pump flows.
52 Flow test conducted by controlling quantity of water discharged through test devices
60 At churn, circulation relief valve checked for operation and water discharge 61 At churn, pressure relief valve checked for proper operation 62 At churn, pressure control valve check for proper operation 63 At churn, test continued for minimum of 1/2 hour 64 At each flow condition, electric motor voltage and current in all lines recorded 65 At each flow condition, pump speed recorded
67 Pressure relief valve closely observed during each flow condition 68 Pressure control valve closely observed during each flow condition
70 Pressure control valve functioning properly (system not exposed to pressures higher than rating) 71 Pressure relief valve observed closing at proper pressure 72 Pressure control valve observed closing at proper pressure (suction or discharge)
74 Pressure relief valve reset to normal position at pump test conclusion
ANNUAL TESTING FOR FIRE PUMP ASSEMBLIES
Fire pump operated at maximum allowable discharge (where available suction supplies do not allow flowing of 150% of rated pump capacity) Fire pump suction supply provided required flow at 0 psi or higher gauge pressure at pump suction flange (except installations where NFPA 20 permitted negative suction gauge pressures) Electric fire pump driver did not overload beyond rating (including service factor allowance) while delivering necessary brake horsepower
Pump suction and discharge pressures and flow meter measurements used to determine total pump output where flowmeter used in testing (not to exceed 2 consecutive annual tests)
Test results using flow meter consistent with previous annual test results (if "no" complete flow test using hose streams or calibrate flow meter
Flow meter adjusted immediately prior to testing in accordance with mfg. inst.
Pump suction and discharge pressures and flow measurements at each hose stream used to determine total pump output where hose streams used in testing (must be conducted every 3 years at minimum)
Care taken to prevent water damage by verifying adequate drainage Flow Test
While Pump is Running
At each flow condition, simultaneous readings of pump suction and discharge pressures and pump discharge flow recorded
Pressure relief valve functioning properly (pump discharge pressure did not exceed normal operation pressure rating of system components)
Pressure relief valve closed by pilot adjustment during flow conditions (as necessary to achieve minimum rated pump characteristics)
75 Power failure conditions simulated while pump operating at peak load 76 Transfer switch transfer of power to alternate power source verified 77 Pump maintenance of peak load performance verified 78 Power failure condition removed 79 Pump reconnected to normal power source after a time delay 80 Alarm conditions simulated 81 Local or remote alarm indicating devices (visual & audible) observed for operation 82 Legally required safety precautions taken during inspecting, testing and maintaining electric controllers
Fire pump assembly considered acceptable because test performance matches performance characteristics on nameplate Investigation initiated where degradation in excess of 5% of initial acceptance test pressure or nameplate
Report of Inspection, Testing & Maintenance of Fire Pump Assemblies…continued
Fire pump assembly considered acceptable because test matches initial unadjusted field acceptance test curve
Comments
*Operate emergency manual starting means (without primary power) *Exhaust system tested for excessive back pressure Pertinent parties notified of test conclusion
Parallel and angular misalignment corrected
Theoretical rated speed correction factors not applied to determine pump compliance per testing Engine speed not increased beyond pump speed rating at rated condition to achieve rated pump performance
Alarm panel clear System returned to service
Voltage readings at motor within 5% below or 10% above rated voltage Abnormalities observed during inspection, testing, and maintenance promptly reported to responsible party Circulation relief valve verified to close in accordance with mfg. spec.
Fire pump assembly maintenance performed in accordance with mfg. recommendations *Circuit breaker tripped (if provided)
* Items necessary only in the absence of manufacturer's recommendations
Systems Equipped with Automatic Transfer Switch
Test Results & Evaluation
After water-flow portions of annual testing or fire protection system activations, suction screens inspected and cleared of debris or obstructions Automatic transfer switches tested in accordance with NFPA 110 Pump room environmental heating equipment automatic operation verified Pump room environmental illumination equipment manual operation verified Pump room environmental ventilation equipment automatic operation verified Parallel and angular alignment of pump and driver checked
Fire Pump Component Details
Fire Pump Pump ID: VA diesel
Pump Type (check one):
Horizontal Vertical In-Line Vertical Turbine End-Suction
Manufacturer: Pentair Fairbanks Nijhuis Model: 5" 1823 CF Serial: 16-2472419
Listed (check all that apply):
FM
UL
ULC
Rated Capacity (GPM): 750.0 Total Dynamic Head (ft): 0.0 Head at Churn 0% (PSI): 79.0 Head at Rated 100%
(PSI): 70.0
Head at Overload 150%
(PSI): 59.0
Rated Speed (RPM): 1750
Pump Rotation: Clockwise Counterclockwise
Suction From: City Impeller Diameter (In): 0.0
Fire Pump Controller Manufacturer: Eaton Cutler-Hammer
Model: FD-100-12L-N-A-L1-
C6,C8,S1,R3,E1,LO+
Serial: 16BG675D
Rated HP: 0.0 Rated RPM:
On (PSI): 135.0 Off (PSI): 140.0 Type of Start: Automatic Run Timer Setting (min): 0
Fire Pump Driver
Type:
Diesel Engine Electric Motor Other __________________
Manufacturer: John Deere Co Model: JU4H-UF20 Serial: PE4045D761669 Rated Speed (RPM): 1750 Frame Size:
Motor Enclosure Type:
Oil Pressure (PSI):
Temperature: 0
Jockey Pump Manufacturer: Grundfos Model: CR-10-6 Serial:
Rated Flow (GPM): 0.0 Rated Pressure (PSI): 0.0 Rated HP: 0.0
Jockey Pump Controller Manufacturer:
Model:
Serial:
Phase:
Cycles (Hz):
Rated Voltage:
On (PSI): 145.0 Off (PSI): 170.0
June 07, 2025 1 of 3
Flow Test D ata Pum p O verview
Rated (G
PM
RPM
N et Pressures:
100%
(PSI)
150%
Churn (PSI)
750.0
70.0 59.0
79.0
Stream s For Peak Flow
: 3 Length O f H oses:
Stream s Total Flow
Corrected
RPM
D isch.
Suct et
Capacity
Tem p
O il
Press
1894.0
162.0 82.0
80.0 evice
PN1.75
- HM
L
0.0
95.0
68.3
1820.0
136.0 66.0
70.0
13.0
377.5
755.0
100.7
96.79
64.72
1808.0
108.0 49.0
59.0
1132.5
151.0
146.16
55.28
June 07, 2025 2 of 3
June 07, 2025 3 of 3
Sheet1
Sheet1
Sheet1
1.pdf
Fire Pump Component Details
Flow Test Data
Pump Overview
Streams For Peak Flow: 3
Length Of Hoses:
image2.emf
Veterans Affair Medical Center Iowa City - Joint Commission - TJC - 2026-03-27.pdf
Johnson Controls is committed to serving our customers with the best-in-class services and technologies. Xaap is an advanced inspection reporting application that has been used by Johnson Controls on your inspections.
Xaap is a software-as-a-service (SaaS) solution that provides a streamlined and digitized approach for performing fire and life safety inspections and managing compliance reports in a single, centralized platform.
The application allows inspectors to capture data for fire and life safety systems and devices while generating the required compliance reports directly from their phones. It also provides facility managers, building managers and key stakeholders with a centralized view of all building systems and deficiency data. Users can easily access, download and share historical inspection reports through Xaap.
See how your organization can leverage this smart technology for your internal inspections Visit info.jci.com/xaap-tjc To Learn More
This report is powered by Xaap, the Building Compliance Reporting Platform used by Johnson Controls.
This page is informational only and not part of The Joint Commission Report
This report is powered by https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc https://info.jci.com/xaap-tjc
[This Page Intentionally Left Blank]
Inspection Summary
Customer Information
Name Veterans Affair Medical Center Iowa City
Building Information
Name Veterans Affair Medical Center Iowa City
Address 601 HWY 6 W , Iowa City , IA 52246
Contact Information
Name Eric Anderson
Role Electronics
E-Mail eric.anderson6@va.gov
Phone 3193380581
Account Information
Service Provider Johnson Controls North America
Office Address 50 Technology Drive, Westminster, MA, US, Office Phone 515-508-9584
Office License
Inspector Name Hunter Tierney
Inspector License
Inspection Information
Start Date 03/23/2026
Date 03/27/2026
Inspection Type Joint Commission
Work Order# 60830020
Timezone GMT-05:00
Inspection Summary
The following Tests and Inspections have been covered in this inspection
EP 2-1 - Supervisory Signals (except for valve tampers switches)
EP 2-2 - Valve Tamper Switches and Water Flow devices
NFPA 25 - 2011
NFPA 72 - 2010
Building Notes
1. Water Flows and Tampers, Fire alarm Signal test only. Not tested in accordance with NFPA25.
www.xaapbuildings.com
DEVICE DEFICIENCIES
TEST TO PERFORM LOCATION DESCRIPTION ADDRESS DEVICE MAKE MODEL BARCODE INSPECTOR / DATE IMAGES
EP2
December , June, March and
September , Quarterly
BLDG 2 PIV VALVE 2:M2-1-0 Tamper Switch — — — Hunter Tierney
03/24/2026
DEFICIENCY
IMAGES APPENDIX
1.1
FAILURE TYPE: Functional Failure FAILURE REASON: Device does not alarm when functionally tested. Only will alarm if electronically tested.
CANNOT INSPECT REPORT
LOCATION DESCRIPTION ADDRESS DEVICE MAKE MODEL BARCODE DATE OF TEST TYPE IMAGES
September
BLDG 1 SUB
BASEMENT SB06B
1:M1-2-0 Water Flow Switch — — — 03/27/2026 Cannot Inspect —
Reason cannot inspect: Disconnected due to construction
BLDG 50-3RD FLR-
TOP OF SE STAIR
50:M1-90-0 Water Flow Switch — — — 03/27/2026 Cannot Inspect —
50:M1-91-0 Tamper Switch — — — 03/27/2026 Cannot Inspect —
INSPECTION RESULTS SUMMARY
CURRENT INSPECTION RESULTS
PREVIOUS INSPECTION
RESULTS
TEST PERFORMED DEVICE TYPE TOTAL PASSED FAILED
CANNOT
INSPECT
INSPECTED
TOTAL
EP 2-1 - Supervisory Signals (except for valve tampers switches)
Supervisory Device 11 5 0 0 45 11
EP 2-2 - Valve Tamper Switches and Water Flow devices Tamper Switch 135 133 1 1 99 135
EP 2-2 - Valve Tamper Switches and Water Flow devices Water Flow Switch 100 94 0 2 94 100
Alternate Elevator
Recall 11 0 0 0 0 11
NFPA 72 - 2010 Battery 39 0 0 0 0 39
NFPA 72 - 2010 Elevator Shunt Trip 10 0 0 0 0 10
NFPA 72 - 2010 Firefighter Phone 9 0 0 0 0 9
NFPA 72 - 2010 Monitor Device 8 0 0 0 0 8
NFPA 72 - 2010 Phone Jack 39 0 0 0 0 39
NFPA 72 - 2010 Primary Elevator Recall 11 0 0 0 0 11
NFPA 72 - 2010 Relay Module 79 0 0 0 0 79
NFPA 72 - 2010 Remote Power Supply 14 0 0 0 0 14
EP 2-2 - Valve Tamper Switches and Water Flow devices
Panel 6 0 0 0 0 6
TOTAL 472 232 1 3 49 472
SUPERVISORY SIGNALS (EXCEPT FOR VALVE TAMPERS SWITCHES)
CUSTOMER NAME: Veterans Affair Medical Center Iowa City
BUILDING NAME: Veterans Affair Medical Center Iowa City
BUILDING ADDRESS: 601 HWY 6 W , Iowa City , IA 52246
CONTACT NAME: Eric Anderson
CONTACT E-MAIL: eric.anderson6@va.gov
CONTACT ROLE: Electronics
CONTACT PHONE: 3193380581
SERVICE PROVIDER: Johnson Controls North America
OFFICE PHONE: 515-508-9584
INSPECTOR: Hunter Tierney
INSPECTION START DATE: 03/23/2026
INSPECTION END DATE: 03/27/2026
WORK ORDER: 60830020
TIMEZONE: GMT-05:00
CURRENT INSPECTION RESULTS PREVIOUS INSPECTION RESULTS
DEVICE TYPE INVENTORY COUNT PASSED FAILED CANNOT INSPECT % INSPECTED INVENTORY COUNT
Supervisory Device 11 5 0 0 45 11
No device deficiencies in this inspection.
RETIRED DEVICES
No retired devices in this inspection.
Element of Performance - EP-2-1 NFPA 72-2010: Table 14.4.5
Joint Commission Standard PE.04.01.01 EP2-1 (Formerly EC.02.03.05 EP1) EP 2-f45bfb05-d053-4840-963a-d4ab003d68fb | Supervisory Signals (except for valve tampers switches) | 03/27/2026
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
PE.04.01.01 EP2-1 (Formerly EC.02.03.05 EP1)
At least quarterly, the facility will test all supervisory devices (except valve tamper switches) The completion date of the test is documented.
Supervisory Signals (except for valve tampers switches)
Note: For additional guidance on performing tests, see NFPA 72-2010: Table 14.4.5
Device Test Method
(1) Pressure Supervisory indicating devices (High and Low)
Switch shall be operated. Receipt of signal obtained where the required pressure is increased or decreased a maximum 10 psi (70kpa) from the required pressure level shall be verified.
(2) Water Level Supervisory Indicating Devices
Switch shall be operated. Receipt of signal indicating the water level raised or lowered a maximum 3
in. (70 mm) from the required level within a pressure tank, or a maximum 12 in. (300 mm) from the required level of a non-pressure tank, shall be verified, as shall its restoral to required level.
(3) Water Temperature
Switch shall be operated. Receipt of signal to indicate the decrease in room temperature to 40°F (4.4"C) and its restoration to above 40°F (4.4"C) shall be verified.
(4) Room Temperature
Switch shall be operated. Receipt of signal to indicate the decrease in room temperature to 40°F (4.4"C) and its restoration to above 40°F (4.4"C) shall be verified.
(5) Other suppression systems supervisory initiating devices
Suppression system supervisory initiating devices shall be tested in accordance with manufacturer's instructions.
(6) Other supervisory initiating devices
Other supervisory initiating devices shall be tested in accordance with manufacturer's instructions.
A.1.1.1.2 There are times when a single inspection or test can meet the requirements of both NFPA 25 and NFPA 72 (e.g., operation of a tamper switch). This standard does not necessarily require that two separate inspections or tests be conducted on the same component, provided the inspection or test meets the requirements of both standards and the individual performing the inspection or test is qualified to perform the inspection or test required by both standards.
f45bfb05-d053-4840-963a-d4ab003d68fb | Supervisory Signals (except for valve tampers switches) | 03/27/2026
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
SUPERVISORY DEVICE
# LOCATION DESCRIPTION ADDRESS DEVICE TYPE BARCODE INSPECTOR DATE OF TEST RESULT
BLDG 1 BSMT FIRE
PUMP LOW FUEL
LEVEL
1:M12-10-0 Supervisory Device — — — Not Inspected
2 Tested by others
PUMP POWER LOSS
- SUPERVISORY
MONITOR
1:M12-12-0 Supervisory Device — — — Not Inspected
PUMP SWITCH OFF
1:M12-18-0 Supervisory Device — Hunter Tierney 03/23/2026 Passed
4 Tested by others
PUMP TROUBLE -
SUPERVISORY
1:M12-13-0 Supervisory Device — — — Not Inspected
BLDG 1 BSMT
JOCKEY PUMP AC
POWER LOSS
1:M12-22-0 Supervisory Device — Hunter Tierney 03/24/2026 Passed
BLDG1 BSMT
JOCKEY PUMP NOT
IN AUTO
1:M12-21-0 Supervisory Device — Hunter Tierney 03/24/2026 Passed
BLDG 1 FLR 1
ENTRANCE PREACT
LOW AIR
1:M11-144-0 Supervisory Device — Hunter Tierney 03/23/2026 Passed
BLDG 40 BASEMENT
MECHANICAL RM
B107 40:M1-250-0 Supervisory Device — Hunter Tierney 03/24/2026 Passed
9 —
SHUNT POWER
MONITOR -
40:M1-240-0 Supervisory Device — — — Not Inspected
10 —
BLDG 41 BASEMENT
ELEV RM B21
SHUNT POWER -
40:M1-45-0 Supervisory Device — — — Not Inspected
11 —
BLDG 42 BASEMENT
ELEV RM B41A
SHUNT PWR -
40:M2-7-0 Supervisory Device — — — Not Inspected
Signature
Name Hunter Tierney Date 03/27/2026 f45bfb05-d053-4840-963a-d4ab003d68fb | Supervisory Signals (except for valve tampers switches) | 03/27/2026
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
VALVE TAMPER SWITCHES AND WATER FLOW DEVICES
Tamper Switch 135 133 1 1 99 135
Water Flow Switch 100 94 0 2 94 100
LOCATION DESCRIPTION ADDRESS DEVICE MAKE MODEL BARCODE DATE OF TEST TYPE IMAGES
BLDG 2 PIV VALVE 2:M2-1-0 Tamper Switch — — — 03/24/2026
FUNCTIONAL
FAILURE
DEFICIENCY
IMAGES APPENDIX
1.1
FAILURE REASON: Device does not alarm when functionally tested. Only will alarm if electronically tested.
Element of Performance - EP-2-2 NFPA 72-2010: Table 14.4.5 and NFPA 25-2011: Table 5.1.1.2
Joint Commission Standard PE.04.01.01 EP2-2 (Formerly EC.02.03.05 EP2) EP f45bfb05-d053-4840-963a-d4ab003d68fb | Valve Tamper Switches and Water Flow Devices | 03/27/2026
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
PE.04.01.01 EP2-2 (Formerly EC.02.03.05 EP2)
At least semi-annually, the facility tests water-flow devices and at least semi-annually the facility tests supervisory valve tamper switches. The completion date of the tests is documented.
Valve Tamper Switches and Water Flow devices
For additional guidance on performing tests, see NFPA 72-2010: Table 14.4.5 and NFPA 25-2011: Table 5.1.1.2
Device Test Method
Control Valve Tamper Switch:
14.4.2.2-14.(i).(1)
Valve shall be operated and signal receipt shall be verified to be within the first two revolutions of the hand wheel or within one-fifth of the travel distance, or per the manufacture's specifications
Mechanical, Electro-sonic, or Pressure-Type Water flow Device:
14.4.2.2-14.(j)
Water shall be flowed through an inspector's test connection indicating the flow of water equal to that from a single sprinkler of the smallest orifice size in the system for wet-pipe systems, or an alarm test bypass connection for dry-pipe, pre-action, or deluge systems in accordance with NFPA 25.
Note 1: For additional guidance on performing tests, see NFPA 72-2010: Table 14.4.5.
Note 2: Mechanical water-flow devices (including, but not limited to, water motor gongs) should be tested quarterly.
The results and completion dates are documented. (For full text, refer to NFPA 25-2011: Table 5.1.1.2)
A.1.1.1.2 There are times when a single inspection or test can meet the requirements of both NFPA 25 and NFPA 72 (e.g., operation of a tamper switch). This standard does not necessarily require that two separate inspections or tests be conducted on the same component, provided the inspection or test meets the requirements of both standards and the individual performing the inspection or test is qualified to perform the inspection or test required by both standards.
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
WATER FLOW SWITCH
BLD1 2FL SOUTH
SPRINKLER
CARDIOLOGY
ABOVE SCALE
1:M13-50-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SPRINKLER ZONE 2
1:M13-52-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SPRINKLER ZONE 3
1:M13-54-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 BASEMENT
CORR BC05 BY
BW116
1:M1-52-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
CORR BCS03
1:M1-71-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
EAST STAIR 2
1:M1-13-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
ELEVATOR LOBBY A
1:M1-26-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
RM BE13 LINEN
CHUTE
1:M1-84-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
RM BW06 LINEN
1:M1-86-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
ROOM BW101
CENTER
1:M1-64-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
SE OUTSIDE WATER
SIGNAL -
WATERFLOW
SIGNAL
1:M1-104-0 Water Flow Switch — — — Not Inspected
WEST STAIR 4
1:M1-45-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 BSMNT
MAIN WF BW02
FIRE PUMP ROOM
1:M12-1-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 BSMNT
PACT
1:M11-164-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SOUTH EXIT
OUTSIDE WATER
SIG - WATERFLOW
1:M1-105-0 Water Flow Switch — — — Not Inspected
BLDG 1 FL 4 W COR
4CW03 BY STAIR 04
1:M4-46-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 FL 6 WEST
CORR 6CW02 STAIR
1:M6-30-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FL 8 CTR
ELEV LOBBY A VLVE
1:M16-36-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 1
CTR ELEV LOBBY A
1:M11-20-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
EAST CORR EAST
1:M11-4-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
NORTH OUTSIDE
WATER SIG -
1:M11-15-0 Water Flow Switch — — — Not Inspected
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
BLDG1 FLOOR 1
1:M11-162-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 1 SC
STAIR 7
1:M11-65-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 FLOOR 1 SE
KITCHEN
1:M11-72-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
OUTPATIENT
1:M11-73-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SW STAIR 6
1:M11-43-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
1:M11-29-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2
CTR CORR STAIR 01
1:M2-10-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 E
STAIR 02
1:M2-3-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 SC
STAIR 07
1:M2-45-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SW STAIR 06
1:M2-30-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 W
STAIR 04
1:M2-20-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 3
CNT ELEVATOR
LOBBY A
1:M3-15-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
EAST STAIR 02
1:M3-4-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 3 SC
AT ELEVATOR B
1:M3-54-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 3 SE
STAIR 05
1:M3-67-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
SW ROOM 3W103
1:M3-57-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
1:M3-43-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
WEST CORR STAIR
04 ZONE 7
1:M3-32-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
04 ZONE 8
1:M3-27-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 4
CENTER STAIR 01
1:M4-20-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 4E
CEILING BY EAST
1:M4-7-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
ELEVATOR C
PENTHOUSE
1:M3-85-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
1:M15-32-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 6
CTR ELEV A LOBBY
STAIR 01
1:M6-23-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
1:M6-6-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 7
1:M7-86-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
EAST CORR BY
STAIR 2
1:M7-74-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
WEST BY WEST
STAIRS
1:M7-12-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 8
1:M14-6-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 9
CENTER IN STAIR 01
1:M9-79-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
EAST BY STAIR 2
1:M9-68-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
WEST STAIRS
1:M9-64-0 Water Flow Switch — Peter R Nilles 03/23/2026 Passed
BLDG 1 FLOOR 10
CORRIDOR WEST
1:M10-34-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
CTR ELEVATOR
1:M10-18-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
1:M10-5-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
WEST PENTHOUSE
1:M10-29-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 11
EAST PENTHOUSE
1:M10-94-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
ELEVATOR B
1:M10-61-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
ROOM 1100
1:M10-49-0 Water Flow Switch — Peter R Nilles 03/23/2026 Passed
1:M10-44-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 12
ROOM 1200
1:M10-77-0 Water Flow Switch — Peter R Nilles 03/23/2026 Passed
BLDG 1 FLOOR 13
ROOM 1300
1:M10-89-0 Water Flow Switch — Peter R Nilles 03/23/2026 Passed
BLDG1 FLR1 AMB
GARAGE
1:M11-190-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
FRONT ENTRANCE
PREACT ALARM
1:M11-142-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
Notes:
• Static test
BLDG 1 FLR 2 SW
STAIR 2ST06 PACT
1:M13-18-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 3 SW
STAIR 3ST06 PACT
1:M3-72-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 4 IN
STAIR 4ST07
1:M15-8-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 4 STAIR
4ST05
1:M15-153-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 CTR
STAIRWELL 01
1:M5-44-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 EAST
STAIRWELL 02
1:M5-7-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
BLDG1 FLR5 SOUTH
EQUIPMENT ROOM
1:M5-60-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
STAIRWELL 05
1:M5-53-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 WEST
STAIRWELL 04
1:M5-86-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR6 SOUTH
1:M5-64-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 8 WEST
STAIR 8ST04
1:M16-34-0 Water Flow Switch — Hunter Tierney 03/23/2026 Passed
BASEMENT SB05
1:M1-103-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
1:M1-2-0 Water Flow Switch — Hunter Tierney 03/27/2026 Cannot Inspect
Notes:
• Disconnected due to construction
BASEMENT
TELEPHONE ROOM
1:M1-9-0 Water Flow Switch — Peter R Nilles 03/23/2026 Passed
BLDG 2 EAST-
BOTTOM OF SOUTH
STAIR
2:M1-69-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 2 EAST TOP
OF SOUTH STAIR
2:M1-68-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 2 OUTSIDE
WATER SIGNAL -
2:M2-22-0 Water Flow Switch — — — Not Inspected
BLDG 2 ROOM 103
SW
2:M2-14-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 7 PRESSURE
SWITCH
1:M1-93-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 20 40:M1-24-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 40 1ST FLOOR
STAIRWELL RM 105
40:M1-8-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 40 2ND
FLOOR STAIRWELL
RM 205
40:M1-12-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 40 3RD
RM 307
40:M1-18-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
CUSTODIAL RM
B103 40:M1-4-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
TUNNEL RISER FOR
BLDG42
40:M1-30-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
TUNNEL RM B108
40:M1-241-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
STAIR BST01
40:M2-13-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 42 FIRST
FLOOR STAIR 1ST01
40:M2-21-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 42 SECOND
FLOOR STAIR 2ST01
40:M2-27-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
BLDG 42 THIRD
FLOOR STAIR 3ST01
40:M2-36-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 50-1ST FLR-SE
50:M1-43-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 50-2ND FLR
SE STAIR
50:M1-46-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
50:M1-90-0 Water Flow Switch — Hunter Tierney 03/27/2026 Cannot Inspect
BLDG 50-LL-SOUTH
EAST STAIR
50:M1-12-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
BLDG 50-LL-
TUNNEL
50:M1-51-0 Water Flow Switch — Hunter Tierney 03/24/2026 Passed
TAMPER SWITCH
SPRINKLER
CARDIOLOGY
ABOVE SCALE
1:M13-49-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
SPRINKLER ZONE 2
1:M13-51-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
SPRINKLER ZONE 3
1:M13-53-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CNT STAIR 1
1:M1-101-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR BC05 @
BW116
1:M1-53-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR BCS03
1:M1-70-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR BS07 S FIRE
BOX RSR
1:M1-58-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CORR STAIR 1
NORTH RISER
1:M1-49-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR STAIR 02
EAST RISER
1:M1-42-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR STAIR 4 WEST
RISER
1:M1-50-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CORR STAIR 5 SE
RISER
1:M1-59-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
EAST STAIR 2
1:M1-14-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
1:M1-25-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
RM BE13 LINEN
1:M1-83-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
RM BW10 LINEN
1:M1-85-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
RM BW101 B BANK
STS
1:M1-62-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
RM BW101 CENTER
1:M1-63-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
ROOM BW03
1:M1-37-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
1:M1-46-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BW02C FIRE PUMP
RM
1:M12-23-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
1:M11-163-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
PUMP BACKFLOW
1:M12-7-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG SIDE
1:M12-20-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
CITY SIDE
1:M12-19-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
PUMP DISCHARGE
1:M12-3-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
PUMP EAST BYPASS
1:M12-8-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
PUMP TEST HEADER
1:M12-2-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
PUMP WEST BYPASS
1:M12-9-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
JOCKEY PUMP
DISCHARGE
1:M12-4-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
JOCKEY PUMP
SUCTION
1:M12-6-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 BSMT STAIR
6 RISER
1:M1-54-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 BSMT STAIR
BC07 SOUTH RISER
1:M1-65-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 FL 4
1:M3-84-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 FL 4 W
4CW03 BY STAIR 04
1:M4-45-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 1 FL 10
CORRIDOR WEST
1:M10-35-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FL 10 CTR
ELEVATOR LOBBY A
1:M10-19-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FL 11
1:M10-60-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 1 A
BANK STAIRWELL
1:M11-128-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M11-19-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
EAST CORR EAST
1:M11-5-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
1:M11-161-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
STAIR 7
1:M11-66-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
KITCHEN
1:M11-77-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M11-79-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
SW STAIR 6
1:M11-44-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M11-30-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CTR STAIR 1
1:M2-7-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 E
CORR STAIR 02
1:M2-2-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 SC
STAIR 07
1:M2-44-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M2-32-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 2 W
1:M2-19-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CNT ELEV LOBBY A
1:M3-16-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M3-5-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
MECH RM 3S08A
1:M3-41-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 3 SC
AT ELEVATOR B
1:M3-55-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 3 SE
STAIR 05
1:M3-68-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
SW ROOM 3W103
1:M3-56-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M3-42-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
04 ZONE 7
1:M3-31-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
04 ZONE 8
1:M3-20-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CENTER STAIR 01
1:M4-32-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLOOR 4E
CEILING BY EAST
1:M4-6-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M15-31-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CNT ELEV A LOBBY
1:M6-21-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M6-7-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M7-87-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
EAST CORR BY
STAIR 2
1:M7-75-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M16-35-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M14-5-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
CENTER IN STAIR 01
1:M9-80-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
EAST BY STAIR 2
1:M9-69-0 Tamper Switch — Peter R Nilles 03/23/2026 Passed
WEST STAIRS
1:M9-63-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M10-4-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLOOR 10
STAIR 10ST03
ANTIFREEZE
1:M10-102-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M10-28-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
EAST PENTHOUSE
1:M10-93-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
ROOM 1100
1:M10-48-0 Tamper Switch — Peter R Nilles 03/23/2026 Passed
1:M10-43-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
ROOM 1200
1:M10-74-0 Tamper Switch — Peter R Nilles 03/23/2026 Passed
BLDG 1 FLOOR 13
ROOM 1300
1:M10-90-0 Tamper Switch — Peter R Nilles 03/23/2026 Passed
BLDG1 FLR1 AMB
GARAGE
1:M11-191-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR1 AMBUL
SPRKLR LOW AIR
1:M11-196-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
FRONT ENTRANCE
PREACT
1:M11-143-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR 1 SW
STAIRWELL
1:M11-145-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 2
ROOM 2W214D
1:M13-30-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 2 SW
STAIR 2ST06 PACT
1:M13-17-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR 3 SW
STAIR 3ST06 PACT
1:M3-71-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 4 IN
STAIR 4ST07
1:M15-7-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR4 PACT
ELEV "D" SHAFT
1:M15-16-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 4 STAIR
4ST05
1:M15-152-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 CTR
STAIRWELL 01
1:M5-45-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 EAST
STAIRWELL 02
1:M5-6-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
EQUIPMENT ROOM
1:M5-61-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
STAIRWELL 05
1:M5-52-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR5 WEST
STAIRWELL 04
1:M5-87-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG1 FLR6 SOUTH
1:M5-63-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 7 WEST
BY WEST STAIRS
1:M7-11-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FLR 8 WEST
STAIR 8ST04
1:M16-33-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 FL WEST
CORR 6CW02 STAIR
1:M6-37-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 1 PIV VALVE
ENTRANCE
1:M11-88-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BASEMENT SB05
1:M1-102-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
1:M1-3-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BASEMENT
TELEPHONE RM
1:M1-22-0 Tamper Switch — Hunter Tierney 03/23/2026 Passed
BLDG 2 EAST-
BOTTOM OF SOUTH
2:M1-70-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 2 EAST TOP
OF SOUTH STAIR
2:M1-67-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 2 PIV VALVE 2:M2-1-0 Tamper Switch — Hunter Tierney 03/24/2026 Failed
Reason for failure: (Functional Failure) Device does not alarm when functionally tested. Only will alarm if electronically tested.
SW BLDG
2:M2-3-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
SW CITY SIDE
2:M2-2-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 2 ROOM
WAREHOUSE
MAILROOM
2:M2-6-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 7 TAMPER
SWITCH
1:M1-94-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 20 40:M1-25-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 20
ANTIFREEZE LOOP
40:M1-29-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 20 PIV VALVE 40:M1-26-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 40 2ND
RM 205
40:m1-12 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 40 3RD
RM 307
40:m1-18 Tamper Switch — Hunter Tierney 03/24/2026 Passed
Customer: Veterans Affair Medical Center Iowa City | Building: Veterans Affair Medical Center Iowa City
Bldg 40 basement custodial rm B103
40:M1-4 Tamper Switch — Hunter Tierney 03/24/2026 Passed custodial rm B103
40:M1-4 Tamper Switch — Hunter Tierney 03/24/2026 Passed mechanical rm
B107 40:M1-250 Tamper Switch — Hunter Tierney 03/24/2026 Passed
TUNNEL RISER FOR
BLDG42
40:M1-31-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed tunnel rm 108
40:M1-241 Tamper Switch — Hunter Tierney 03/24/2026 Passed
RM B41 ELEV PIT
40:M2-10-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
STAIR BST01
40:M2-14-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 42 FIRST
FLOOR STAIR 1ST01
40:M2-22-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 42 SECOND
FLOOR STAIR 2ST01
40:M2-28-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 42 THIRD
FLOOR STAIR 3ST01
40:M2-37-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 50-1ST FL-NW
STAIR HOSE VALVE
50:M1-45-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed
BLDG 50-1ST FLR-SE
50:M1-44-0 Tamper Switch — Hunter Tierney 03/24/2026 Passed