This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 23, located in Sioux Falls, South Dakota. Amendment Number 0001 extends the solicitation deadline to March 17, 2026, at 5:00 PM CDT for solicitation number 36C26326Q0427. The amendment publishes Technical Questions and Government Answers, provides an updated Statement of Work, and extends the solicitation period. All quotes must be submitted via email to amanda.patterson-elliott@va.gov by the extended deadline. The contracting officer is John Milroy (VA-VHA-RPOC-2023-0067).
The project involves a C-CURE 9000 and TLS Encryption Upgrade for the VA Nebraska-Western Iowa Health Care System, with performance at two locations: the Omaha Division Medical Center (4101 Woolworth Avenue, Omaha, NE 68105) and Grand Island VAMC (2201 N Broadwell Ave, Grand Island, NE 68803). The performance period runs from March 30, 2026, to June 30, 2026. The scope includes upgrading the Physical Access Control System infrastructure from TLS 1.2 to TLS 1.3 encryption standards by replacing and updating approximately 91 Software House control panels, with 52 first-generation iSTAR Edge panels being replaced with second-generation units. Major deliverables include furnishing and installing iSTAR Ultra G2 ACM and GCM boards, 52 iSTAR Edge G2 controller motherboards, associated power supplies and batteries, firmware upgrades on all controllers, TLS 1.3 configuration, system programming and configuration, comprehensive testing and commissioning, and operator training. Work shall be performed during normal business hours (Monday-Friday, 7:00 AM to 5:00 PM), excluding federal holidays, with approximately 295 hours of labor required. All installed equipment and workmanship are warranted for one year following completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26326Q0427 0001.docx | DOCX document | |
| S02 Solicitation 36C26326Q0427.pdf | ||
| Wage Determination 2015-5771.pdf | ||
| 36C26326Q0427_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 7
636-26-2-5067-0047
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
2501 W. 22ND STREET
SIOUX FALLS SD 57105
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
2501 W. 22ND STREET
SIOUX FALLS SD 57105
36C26326Q0427
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-17-2026 5:00PM CDT
See CONTINUATION Page 636-3660152-5067-840700 2625 010040700 636-26-2-5067-0047
X one
C•CURE 9000 and TLS Encryption Upgrade for the VA Nebraska Western Iowa Health Care System for a period of Performance 03/30/2026 to 06/30/2026.
The purpose of this amendment is to:
1. Publish Technical Questions and Govenment Answers
2. Publish an updated Statement of Work
3. Extend the solicitation period. All quotes are due by Tuesday, 3-17-2026 at 5:00 PM. Quotes shall be sent via email to amanda.patterson-elliott@va.gov.
John Milroy
VA-VHA-RPOC-2023-0067
Technical Questions and Answers
36C26326Q0427
Question # 1.
a. The SAM.GOV Bid Description lists 2 locations
i. “C CURE 9000 and TLS Encryption Upgrade for the VA Nebraska-
Western Iowa Health Care System, 4101 Woolworth Avenue, Omaha, NE 68105
ii. AND for the Department of Veterans Affairs, Grand Island VA Medical Center, 2201 N Broadwell Ave, Grand Island, NE 68803.”
b. While the SOW only lists 1 location
i. “2. PERFORMANCE LOCATION:
ii. 2.1. Department of Veterans Affairs Nebraska-Western Iowa Health Care
System, Omaha Division Medical Center, 4101 Woolworth Avenue, Omaha, NE 68105”
c. Could you please confirm which location(s) are included in the scope of work?
Government Answer: The place of performance is VA Nebraska-Western Iowa Health Care System, 4101 Woolworth Avenue, Omaha, NE 68105 AND for the Department of Veterans Affairs, Grand Island VA Medical Center, 2201 N Broadwell Ave, Grand Island, NE 68803.
Question # 2.
Additionally, if both locations are included, are the two C-CURE systems linked or managed separately?
Government Answer: The systems are linked.
Question # 3.
Question on the Period of Performance:
d. SAM.GOV Bid Description: “The period of performance is 03/30/2026 to 06/30/2026 for the base year period of performance.”
e. SOW: “PERFORMANCE PERIOD: 04-01-2026 to 07-31-2026”
f. Could you please confirm which period of performance should be used for proposal planning?
Government Answer: The period of performance is 03/30/2026 to 06/30/2026.
Question # 4.
To accurately scope the work, could the Government please provide the following information regarding the existing Software House C-CURE 9000 system? (If the Omaha and Grand Island locations are both being addressed, there will/may be 2 SSNs and SSAs – please provide information on both, if relevant.)
g. The system serial number(s)
h. The current Software Support Agreement (SSA) level and status
i. Is the SSA currently active or expired?
ii. If the SSA is expired, should the contractor include renewal and update costs in the proposal?
i. The number of doors currently monitored by each system
Government Answer:
1. There is only 1 SSA for the two campuses.
a. The SSN is 9-21400
b. Status is active. Level is known.
i. Active. License will expire on 04/30/2026
ii. N/A
c. 779 doors are monitored by the software
A.1 PERFORMANCE WORK STATEMENT Amended 03-11-2026
1. Project: VAMC Access Control TLS 1.3 Upgrade and Controller Replacement
2. PERFORMANCE LOCATION:
2.1. Department of Veterans Affairs Nebraska-Western Iowa Health Care System, Omaha Division Medical Center, 4101 Woolworth Avenue, Omaha, NE 68105
2.2. Grand Island VAMC, 2201 N Broadwell Ave, Grand Island, NE 68803
3. PERFORMANCE PERIOD: 03-30-2026 to 06-30-2026
4. Project Overview
4.1. This project consists of upgrading the existing Software House C•CURE 9000 Physical Access
Control System (PACS) infrastructure from Transport Layer Security (TLS) 1.2 to TLS 1.3 encryption standards through replacement and firmware updates of affected iSTAR controllers and associated hardware.
4.2. The upgrade is required to maintain system operability, manufacturer supportability, and cybersecurity compliance due to the expiration of the default TLS 1.2 host certificate on February 18, 2026. Failure to complete this upgrade may result in loss of communication between the C•CURE server and field controllers following any system interruption or controller disconnect event.
5. Objectives
5.1. The primary objectives of this project are:
5.2. Ensure continued operation of the VA Physical Access Control System.
5.3. Upgrade system encryption to TLS 1.3 to meet manufacturer security requirements.
5.4. Replace unsupported first-generation iSTAR Edge controllers with second-generation hardware.
5.5. Update firmware on all applicable controllers to the latest supported versions.
5.6. Maintain secure connectivity between controllers and the C•CURE 9000 server environment.
5.7. Reduce cybersecurity risk exposure associated with unsupported encryption protocols.
6. Systems Covered Under This Scope
6.1. This scope includes all access control panels connected to the existing C•CURE system environment that currently operate using TLS 1.2 encryption, including:
6.2. Approximately 91 Software House control panels
6.3. 23 panels identified as directly impacted by TLS certificate expiration risk
6.4. Replacement of 52 first-generation iSTAR Edge panels
6.5. Integration with existing or EHRM-provided Ultra control panels where applicable
7. Scope of Work Tasks
7.1. Hardware Replacement and Installation
7.1.1. The contractor shall:
7.1.1.1. Furnish and install:
7.1.1.1.1. iSTAR Ultra G2 ACM and GCM boards
7.1.1.1.2. 52 iSTAR Edge G2 controller motherboards
7.1.1.1.3. Associated power supplies and batteries
7.1.2. Replace existing first-generation Edge controllers with second-generation units.
7.2. Install Ultra control panels at designated facility locations.
7.3. Connect designated Edge panels to Ultra panels provided under separate projects where identified.
7.4. Firmware and Cybersecurity Upgrades
7.5. The contractor shall:
7.5.1. Upgrade firmware on all new and applicable existing controllers to the latest supported release.
7.5.2. Configure controllers to operate using TLS 1.3 encryption.
7.5.3. Implement host-based certificates where required.
7.5.4. Reconnect all controllers to the C•CURE server following upgrade.
8. Programming and Configuration
8.1. The contractor shall:
8.1.1. Perform controller-level programming updates.
8.1.2. Configure system schedules, alarms, and operational parameters.
8.1.3. Deploy updated system graphics and configuration settings as required.
8.1.4. Utilize a VA-provided laptop with C•CURE software for initial controller provisioning where required.
9. Testing and Commissioning
9.1. The contractor shall perform:
9.1.1. Point-to-point verification testing.
9.1.2. System communications validation.
9.1.3. Functional testing of access control devices.
9.1.4. System startup and commissioning.
9.1.5. Verification of TLS 1.3 secure communications.
10. Training
10.1. The contractor shall provide operator training covering:
10.1.1. System operation following upgrades.
10.1.2. Controller management and monitoring.
10.1.3. Alarm and event response procedures.
11. Labor and Work Hours
11.1. Work will be performed during normal business hours:
Monday through Friday
11.1.1. 7:00 AM to 5:00 PM
11.1.2. Excluding federal holidays
11.1.3. After-hours work is not included unless separately authorized.
12. Equipment Summary
12.1. Major equipment included:
12.2. 1 — iSTAR Ultra G2 ACM Board
12.3. 1 — iSTAR Ultra G2 GCM Board
12.4. 52 — iSTAR Edge G2 Controllers
12.5. 1 — Ultra Power Supply System
12.6. Batteries and associated hardware
12.7. Programming and installation labor (approximately 295 hours)
13. Deliverables
13.1. The contractor shall provide:
13.1.1. Fully installed and operational TLS 1.3 compliant PACS controllers
13.1.2. Updated firmware across all affected devices
13.1.3. System configuration documentation
13.1.4. Test and commissioning verification
13.1.5. Operator training completion
14. Assumptions and Dependencies
14.1. Existing infrastructure wiring remains serviceable.
14.2. VA will provide necessary network access and credentials.
14.3. VA will provide a laptop with C•CURE software for controller provisioning where required.
14.4. Work areas will be accessible during scheduled installation periods.
15. Warranty
15.1. All installed equipment and workmanship shall be warranted for a period of one (1) year following installation completion in accordance with manufacturer and contractor warranty terms.
16. Risks of Non-Execution
16.1. Failure to execute this project prior to TLS certificate expiration may result in:
16.2. Loss of PACS controller communications after system interruption
16.3. Inability to manage facility access control electronically
16.4. Increased cybersecurity vulnerability
16.5. Operational disruption impacting patient care areas and secure zones
16.6. Emergency replacement costs exceeding planned project funding
17. Acceptance Criteria
17.1. Project completion will be considered successful when:
17.2. All controllers communicate securely using TLS 1.3.
17.3. Access control functionality is fully operational.
17.4. Testing and commissioning documentation is approved.
17.5. Training has been delivered to designated personnel.