This document is an amendment to a solicitation (36C26325Q1107) for chiller maintenance and repair services at the Minneapolis Veterans Affairs Health Care System (MVAHCS). The amendment responds to vendor questions and clarifies details about the maintenance requirements for 14 chillers across multiple buildings, ranging from 15 to 1100 tons. Key service requirements include seasonal startup and shutdown, oil and refrigerant analysis, vibration analysis, eddy current testing, and calibration of sensors, to be performed annually or every three years.
The solicitation requires contractor technicians to have journeyman HVACR licensing, EPA 608 Certification, and Non-Destructive Electro Magnetic Testing certifications. Work will be performed Monday through Friday, 7:00 am - 5:00 pm, with potential emergency repair services outside these hours. Contractors must comply with extensive security requirements, including background checks, badge procurement, and web-based training. The offer deadline is 09/15/2025 at 12:00 Central Time, and the contract will be administered by the Department of Veterans Affairs, Veterans Integrated Service Network 23.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Offer Deadline Extension 36C26325Q1107 0004.docx | DOCX document | |
| S06 Chiller Response to Vendor Questions Mpls VAMC 36C26325Q1107 0002.docx | DOCX document | |
| S02 MVAHCS Pump List.xlsx | XLSX spreadsheet | |
| S02 Offer Deadline Extension 36C26325Q1107 0001.docx | DOCX document | |
| S02 Chiller Maintenance Mpls VAMC 36C26325Q1107.docx | DOCX document | |
| S02 DOL WD 2015-4945 R29 07082025.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
09-11-2025
36C263 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506 St. Paul MN 55101 To all Offerors/Bidders
36C26325Q1107 08-25-2025
X
See following pages.
Jeffrey Brown Contracting Officer
VA-VHA-RPOC-2024-0033
The purpose of this amendment is to respond to vendor questions.
Vendor Questions in bold/VA responses in red.
· Has the VA installed a system to safely check complete vibration analysis of the gearbox, or will a temporary catwalk have to be installed?
Currently there is not a catwalk available to perform these services. Ladders or scaffolding shall need to be erected to perform this service. The contractor is responsible for providing all tools and equipment to perform services outlined in the SOW.
· Please confirm eddy current Analysis on Chillers 1-7 only Eddy current testing shall be performed on all chillers. Section 8.c.vii. of the SOW has had a typo corrected to reflect this.
· Please confirm Oil Analysis on Chillers 1-7 only Oil analysis shall be performed on all chillers.
B.3 Statement of Work Minneapolis Veteran Affairs Health Care System (MVAHCS) Chiller Maintenance
1. Introduction:
a. The MVAHCS Chillers and associated equipment require scheduled preventative maintenance and emergency repair service quotes.
2. Objectives:
a. The purpose of this Statement of Work is to obtain chiller preventative maintenance services and emergency repair service quotes for the MVAHCS chiller makes and models and chiller system equipment listed below:
| Equipment |
| Brand |
| Size |
| Model # |
| Serial # |
| Location |
| Chiller 1 |
| York |
| 1100 ton |
| YKNQNRK1-CZGS |
| SMWM-774210 |
| Building 69 |
| Chiller 2 |
| York |
| 1100 ton |
| YKNQNRK1-CZG |
| SMWM-753090 |
| Building 69 |
| Chiller 3 |
| York |
| 1100 ton |
| YKNQNRK1-CZG |
| SMWM-481550 |
| Building 69 |
| Chiller 4 |
| York |
| 1100 ton |
| YKNQNRK2-CZG |
| SMWM-700880 |
| Building 69 |
| Chiller 5 |
| McQuay |
| 290 ton |
| WMC290DSC-ER10 |
| STNU081000119 |
| Room BJ101 of Building 70 |
| Chiller 6 |
| McQuay |
| 290 ton |
| WMC290DSC-ER10 |
| STNU0810001000 |
| Room BJ101 of Building 70 |
| Chiller 7 |
| Trane |
| 500 ton |
| CVHE500 |
| L99C01119M |
| Room A104 of Building 49 |
| Chiller 8 |
| Trane |
| 270 ton |
| RTAE 300F |
| U17B07263 |
| Building 70 |
| chiller 9 |
| Trane |
| 270 ton |
| RTAE 300F |
| U17B07264 |
| Building 70 |
| Chiller 10 |
| York |
| 60 ton |
| YCAL0060EB17X |
| RCNM007937 |
| Building 9 |
| Chiller 11 |
| McQuay |
| 50 ton |
| AGZ050CHHNN-ER10 |
| STNU090800034 |
| Outside of Building 70 (MRI) |
| Chiller 12 |
| Dimplex |
| 30 ton |
| W02-10000-2P-NF-L-M4-407C-M |
| W388456-001 |
| Outside of Building 70 (MRI) |
| Chiller 13 |
| Dimplex |
| 15 ton |
| W02-10000-2P-NF-L-M4-407C |
| W000055-001 |
| Outside of Building 70 (MRI) |
| Chiller 14 |
| Artic |
| 30 ton |
| TMACRPV0300D4-DS1 |
| A001040421 |
| Penthouse (CH-001) of Building 49 |
Refrigerant Monitoring Systems
| Manufacturer |
| Description |
| Model # |
| Serial # |
| Location |
| Bacharach |
| Halogen Gas Monitor |
| HGM 300 |
| UNK |
| Building 69 |
| Bacharach |
| Remote Display Module |
| RDM 800 |
| MY 117 |
| Building 69 |
| Bacharach |
| Halogen Gas monitor - Multizone |
| HGM-MZ4 |
| 190960171 |
| Bldg 70 BJ101 |
| Bacharach |
| Remote Module |
| HGM300J-12-1 |
| NY1025 |
| Bldg 70 BJ101 |
| Bacharach |
| Halogen Gas monitor - Multizone |
| Halogens |
| 23097393 |
| Bldg 49 |
b. See the attached S02 MVAHCS Pump List which contains a list of the pumps at the Minneapolis VAMC. The list of pumps is subject to change.
c. Contractor technicians performing maintenance on chillers shall possess at least journeyman Heating, Ventilation, Air Conditioning, and Refrigeration (HVACR) licensing and possess Environmental Protection Agency (EPA) 608 Certification and shall present evidence to demonstrate these licenses or certification upon request from a MVAHCS representative or Contracting Officer (CO).
d. Contactor shall provide Non-Destructive Electro Magnetic Testing training certifications for technicians performing Eddy Current Testing.
3. Services:
a. Contractor will provide all labor, tools, equipment and preventative maintenance materials (parts/supplies) to perform Preventative Maintenance, Seasonal Maintenance and Periodic Services on the equipment listed above as per manufacture’s service manual, technical bulletins and other documentation. All repair parts will meet manufacture specifications. Preventative maintenance includes maintaining York Variable Speed drive with Original Equipment Manufacturers (OEM) York Inhibitor annually.
b. Preventative Maintenance Program includes (see appendix A for details):
i. Seasonal Start Up
ii. Seasonal Shut down / End of season preventative maintenance.
iii. Oil Analysis.
iv. Oil and filter changes.
v. Vibration Analysis on Circulating Pumps (Annually).
vi. Vibration Analysis on Cooling towers (Annually).
vii. Calibrate differential pressure sensors (Annually).
viii. Calibrate Flow Sensors (Annually).
ix. Eddy current testing (every 3 years) Due FY 28 chiller (Seasonal shut down).
c. Seasonal startup and shut down dates vary year to year depending on the weather conditions in Minneapolis, Minnesota. Typically, startup is in May and shut down is done in September. Exact dates will be coordinated with contractor each season in advance.
d. Provide a service report to the Energy Plant Supervisor and the HVAC Shop Supervisor for each service completed. Provide any recommendations for necessary repairs or enhancements to maintain capacity, reliability, and efficiency. The written reports shall be submitted to the VAHCS Energy Center and HVAC Shop Supervisor within 10 calendar days after service is complete.
e. The Contractor must be able to properly troubleshoot and diagnose all aspects of chiller system failures.
f. When chiller systems fail, the technician’s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the chiller system failure and that they have verified the chiller system has been properly diagnosed and concur with the technician’s assessment.
g. The VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert’s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert’s points that contradict the Contractor’s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert’s opinion.
h. The Contractor shall be responsible for replacing any insulation removed while performing services under this contract.
4. Working hours:
a. Anticipated hours of work will be Monday through Friday from 7:00 am – 5:00 pm. Emergency repair service quotes may be required after hours, weekends and/or federal holidays.
Observed Federal Holidays:
| New Year’s Day | Martin Luther King Birthday | ||
| Washington’s Birthday | Memorial Day | ||
| Juneteenth | Independence Day | ||
| Labor Day | Columbus Day | ||
| Veteran’s Day | Thanksgiving Day |
Christmas Day
5. Safety:
a. The Contractor is responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.
b. Appropriate Personnel Protective Equipment (PPE) will be worn while performing work on the VA Campus. Contact COR for additional requirements. This may include PPE mandated by the facility.
c. Contractors and Sub-Contractors are responsible for making sure equipment is LOTO (Locked Out Tagged Out) when applicable.
6. Security:
a. The Contractor’s personnel will utilize a temporary vendor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.
b. The Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Contractors employees must complete web-based Rules of Behavior training.
c. All employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.
d. The Contractor will submit all required security badging documents for each employee that will be on site to perform work. Signatures on documents must be wet signatures. The following documents must be completed .and returned within 5 business days from the award date of contract:
i. OF 306- Must be Typed. Handwritten document will not be accepted.
ii. Self Certification
iii. VA 10-2417
iv. Employee Fingerprint Resource Form
e. The Contractors are required to check in with the Energy Center Supervisor, HVAC Supervisor or the designated representative upon arrival at facility to obtain instructions, work orders and project location information.
7. Parking/Storage:
a. Parking is available by Bldg 69 (Energy Center) and at the main hospital in parking lots 11, 43A and 43B for vehicles (automobiles and Pickup trucks). Larger vehicles, equipment, job site trailers or storage containers must utilize parking lot 43A only. Contractor’s contact information (name and phone number) is required to be displayed on all vehicles, equipment, trailers or containers that are stored overnight at the MVAHCS. Dropping off tools and materials at the loading dock is permitted but no parking is allowed in the loading dock area. Unattended vehicles in unauthorized parking areas will be ticketed by MVAHCS Police.
8. Appendix A
a. The contractor shall use each manufacturer’s specifications and guidelines, as a final determination to keep the chiller system operating as designed. The following list emphasizes the required tasks required to keep the chillers in good operating condition.
b. Seasonal Start up:
i. Refer to manufacturer's service manuals for startup.
ii. Start chiller and monitor system for proper operation and performance.
iii. Leak-test chiller for refrigerant system leaks with an electronic leak detector.
iv. Check for any Oil leaks.
v. Log all operating conditions after unit stabilizes.
vi. Review Owners logs and log all operating conditions.
vii. Review operating procedures and owners log with chiller operator.
viii. Retrieve oil samples after startup and send to test lab analysis.
ix. Check refrigerant levels (Annually).
x. Check oil levels (Annually).
xi. Calibrate Flow sensors (25 each - Flow sensors) annually between seasonal cooling tower startup and prior seasonal cooling tower shutdown.
xii. Calibrate Differential Sensors (35 each- Differential pressure sensors).
xiii. Perform Vibration Analysis for Pumps and motor assemblies (Approximately 45 each - Pumps) annually between seasonal cooling tower startup and prior seasonal cooling tower shutdown.
xiv. Perform Vibration Analysis for Cooling Tower motor and gear boxes (8 each) annually between seasonal cooling tower startup and prior seasonal cooling tower shutdown.
xv. Check oil sump heater and purge pump oil heater where applicable.
xvi. All electric wiring integral to each chiller.
xvii. All refrigerant piping associated with the chiller systems.
xviii. Check and test all operating and safety controls.
xix. Inspect and test all pressure and temperature controls, thermometers, and manual valves located on the equipment.
xx. Inspect and test three (3) Refrigerant Leak Monitoring/Leak detection systems in Chiller Mechanical Rooms.
c. Seasonal Shut down / End of season preventative maintenance:
i. Refer to manufacturer's serviced manuals for seasonal shut down procedures.
ii. Perform Spectro-chemical oil Analysis.
iii. Oil and filter change per manufactures service manual for each chiller.
iv. Refrigerant analysis performed annually.
v. Leak test chiller for refrigerant and oil systems leaks using an electronic leak detector.
vi. Vibration Analysis.
vii. Eddy current testing every 3 years for all chillers. Due Feb 2028.
viii. Test electrical wiring insulation using the Megohmmeter method for compressor motor and oil pump motor.
ix. Inspect main starter and control panel.
x. Check oil sump heater operation.
xi. Service York Variable Speed drive including OEM York Inhibitor annually.
d. Reports:
i. The following reports must contain the following information, at the very least:
ii. Spectrochemical oil analysis:
| Parameters tested: | Results: | ||
| Metals | Diagnosis | ||
| Moisture | Trends | ||
| Acid Number | Recommendations |
1-oil analysis shall be performed annually.
· Provide a detailed report for each sample.
iii. Refrigerant analysis:
| Parameters tested: | Results: | |
| High boiling residue | Diagnosis | |
| Acid Number | Trends | |
| Moisture Content | Recommendations |
· Refrigerant analysis shall be performed annually
iv. Triaxle Vibration Analysis (x, y and z):
| Parameters tested: | Results: | ||
| Measure horizontal deflections | Report | ||
| Measure vertical deflections | Trends | ||
| Measure axial deflections | Establish baseline |
Level of concern Recommendations/Probable cause/ID potential failure Vibration analysis shall be performed annually.
· Provide detailed vibration analysis reports. Reports shall include information about the condition of pumps and cooling towers. Report shall include information about the probable cause of the vibration. Reports shall provide solutions to repair each item.
v. Eddy current testing shall be performed in Fiscal Year 2028 (Every 3 calendar years). Centrifugal Chillers- Analyses are to be performed on both evaporator and condenser tubes. Both end bells shall be removed during the process of the Eddy Current Testing and the evaporator/ condenser cleaning procedure.
| Parameters tested: | Results: | |
| Corrosion | Verbal report | |
| Support wear | Written report | |
| Freeze bulge | Charts/diagrams | |
| Split fins | Recommendations | |
| Leakers | Pitting |