MS30_MFR_36C26325B0010 0001.pdf
PDF 166 KB Posted
- Solicitation number
- 36C26325B0010
About this file
This memorandum is an Amendment (0001) to extend the Invitation for Bid (IFB) due date for a construction project at the Black Hills VA Health Care System in Hot Springs, South Dakota. The amendment extends the bid submission deadline by 18 calendar days, from 2:00 PM (CT) on 20 May 2025 to 2:00 PM (CT) on 6 June 2025. The project involves upgrading the Nutrition and Food Service (NFS) building, including renovating the existing kitchen and serving area in Building 2, with improvements to finishes, HVAC, plumbing, and electrical systems.
The solicitation is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a NAICS code of 236220 and a small business size standard of $45,000,000. The project scope includes creating a kitchen capable of serving three meals per day for 100 residents, involving new wall configurations, ceiling, flooring, and wall coverings. The construction period is 180 calendar days from the Notice to Proceed, with an estimated project value between $2,000,000 and $5,000,000. Bidders must be registered and certified in the Veteran Small Business Certification (VetCert) database and will obtain solicitation documents through the System for Award Management (SAM) Contract Opportunities website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26325B0010 0002_IFB CANCELLATION.pdf | ||
| S02_Specifications_Upgrade NFS Bldg 2_HS.pdf | ||
| S02_Wage Det_1.3.25_568A4-22-205.pdf | ||
| 36C26325B0010_1.pdf | ||
| S02_Drawings_Upgrd NFS Bldg 2_HS.pdf | ||
| 36C26325B0010.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Memorandum Veterans Health Administration
Date: 19 May 2025
From: Calvin L. Courtney, Contracting Officer
Subj: IFB/Amendment Number 36C26325B0010 0001; Upgrade NFS Building 2 (HS);
PN: 568A4-22-205; IFB Extension
To: File
Amendment 0001 is being processed to extend the IFB due date by 18 calendar-days, from 2:00 PM (CT) on 20 May 2025 to 2:00 PM (CT) on 6 June 2025. The pre-bid site visit was held on 23 April 2025, with all official questions due NLT 29 April 2025. All questions received were reviewed by the CO, consolidated into one (1) document and provided to the COR on 1 May 2025. On 9 May 2025 I received an email from the COR stating there are new federal requirements relating to the HVAC refrigerant that could involve some re-design. I followed up and received another email from the COR on 13 May 2025, stating the same thing, I requested confirmation before cancelling the requirement. On 16 May 2025, the COR provided an email stating he’d been unable to get an estimate from the AE regarding how long a re-design would take, with no confirmation. On 19 May 2025, the CAM contacted me and stated after some research into the possible changes required in a redesign, he did not believe one was required.
The CAM made the decision to press forward with the current design but the answers for the site visit questions have yet to be completed. The Amendment is being accomplished to extend the IFB due date to allow time to complete the responses, issue a second Amendment to publish the responses and then allow enough time for interested vendors to complete their bid.
CALVIN L. COURTNEY
Contracting Officer Network Contracting Office (NCO) 23