This is a Questions and Answers document related to a VA solicitation for repairs to MV Loop #1, consisting of four technical clarification questions about electrical work specifications. The document provides details about wire specifications, indicating that 2/0 Copper 15kV wire will be used for 3 phases, along with a green insulated ground wire, using MV-105 Sun Res insulation for CT Use, with no spare wires (3 conductors plus ground only).
The answers clarify that the scope involves pulling new wire through existing conduit without replacing the concrete duct bank, vaults, or sectionalizing cabinets. This suggests a focused electrical repair/replacement project rather than major infrastructure upgrades or replacements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26325B0005 0003.docx | DOCX document | |
| S04_Site Visit Sign In Sheet.pdf | ||
| 36C26325B0005 0002.docx | DOCX document | |
| 36C26325B0005 0001.docx | DOCX document | |
| S02 TMS 20939 VA Privacy Training - 3pp.pdf | ||
| S02_Drawings_Elec Site Map_1 Page.pdf | ||
| 36C26325B0005_1.docx | DOCX document | |
| S02_EMR_2 Pages.pdf | ||
| S02_Wage Determination_General Decision Number_8 Pages.pdf | ||
| S02 NARA Language for Contracts.pdf | ||
| S02_SOW_General Requirements_15 Pages.pdf | ||
| S02_Spec_26 05 13 Medium Voltage Cable_10 Pages.pdf | ||
| S02_SOW_3 Pages.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions and Answers
# SOW
Reference
Question Answer
1. What size conductor, insulation rating and number of conductors per conduit and if any are going to be spares
2/0 Copper 15kV wire is to be used for the 3 phases.
A ground wire (green insulation required) will also be pulled Insulation level MV-105 Sun Res for CT Use 3 + Ground, 0 spares (# of conductors) No spare wires will be pulled, it is only the 3 phases and one ground
2. Are we replacing the concrete duct bank or just repulling new wire in existing conduit?
Just pulling new wire.
3. Are we replacing the vaults, if so what size? There will be no vault replacement.
4. Are we replacing any sectionalizing cabinets, if so what size? There will be no replacement of cabinets.