36C26324R0008 0002.pdf
PDF 153 KB Posted
- Attached to
- Q522--Diagnostic Radiology Technician Services
- Solicitation number
- 36C26324R0008
About this file
This document is a solicitation amendment for diagnostic radiology technician services. The amendment updates the experience requirement under Sub Factor B to one year and provides instructions for acknowledgement of receipt. The solicitation seeks offers for diagnostic radiology technician services to be performed for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Evaluation will be based on technical excellence, past performance, and price, with technical excellence being the most important factor. Technical excellence will be evaluated on personnel qualifications, experience/skills, collaborative skills, and management/administrative capabilities. Offerors must provide documentation demonstrating staff qualifications, experience operating imaging equipment and performing exams, references, and management plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26324R0008 0003.pdf | ||
| 36C26324R0008_4.docx | DOCX document | |
| 36C26324R0008_3.docx | DOCX document | |
| 36C26324R0008_2.docx | DOCX document | |
| 36C26324R0008 0001.pdf | ||
| D.6 - Attachment 6 - Organizational Conflict of Interest.pdf | ||
| D.2 Attachment 2 - Background Investigation Procedure and Documents.pdf | ||
| D.1 Attachment 1 - VA Rules of Behavior.pdf | ||
| D.4 Attachment 4 - Immigration and Nationality Act Requirement.pdf | ||
| 36C26324R0008_1.docx | DOCX document | |
| S02 - 36C26324R0008.pdf | ||
| D.5 Attachment 5 - Security Checklist - 6500.6.pdf | ||
| D.3 - Attachment 3 - QASP.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
None
36C263
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
Daniel Vagts
316 Robert Street N. STE. 506
St. Paul MN 55101
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
316 Robert Street N. STE. 506
St. Paul MN 55101
To all Offerors/Bidders
36C26324R0008
X
X 1
The purpose of this amendment is to update Sub Factor B (Experience/Skills). 1 year experience required.
Daniel Vagts
Contract Officer
EVALUATION FACTORS:
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offer:
(1) Technical Excellence
(a) Personnel Qualifications
(b) Experience/Skills
(c) Collaborative Skills
(d) Contractor’s Management/Administrative Capabilities and Responsibility
Relative Importance: Technical Excellence and Past Performance will be afforded primary emphasis with Technical Excellence being more important than Past Performance. Sub-factors within the technical evaluation are equal importance. Evaluation factors other than cost/price, when combined, are significantly more important than cost/price.
FACTOR 1 - TECHNICAL EXCELLENCE
Offers will be evaluated on the sub-factors listed below. Offerors must submit the following requested documentation and information in the following format:
Technical Sub Factor A Personnel Qualifications: The Technical Panel will evaluate each candidate’s personal qualifications.
The offeror must provide the following documents /information demonstrating the qualifications of personnel to meet the requirements to include:
• A listing of all DRT staff who will be assigned to perform the required services.
• Copies of resumes and ARRT certification.
Technical Sub Factor B Experience/Skills: The Technical Panel will evaluate each candidate’s experience based on:
• Provide list of Imaging equipment that you can operate.
• Provide list and volumes of imaging exams you have performed.
• Provide years of experience 1 Year required.
Technical Sub Factor C Collaborative Skills:
• Provide three professional written letters of reference.
Technical Sub Factor D Contractor’s Management/Administrative Capabilities and Responsibility: The Technical Panel will evaluate the contractor’s management and administrative capabilities and responsibility:
The offer must provide information that demonstrates their company’s ability to provide required services and to manage and administer an awarded contract. This includes information regarding:
Provide information that corroborates your company has adequate personnel to provide required Imaging services and the capability to maintain continuity in staffing in a timely manner. Include recruitment, staffing, back-up, and retention plans.
FACTOR 2 – PAST PERFORMANCE
An offeror’s past performance is important in determining its ability to successfully perform required services. The government is especially interested in recent and relevant past performance that relates very closely to the requirement set forth in the performance-based work statement.
1. Identify the type and scope of practice for the past three (3) years addressing professional background, experience, and level of professional competence.
2. Provide a list of no more than five (5) of the most relevant contracts performed for
Federal agencies and commercial customers within the past three (3) years, including name, address, telephone number, and email address of contract key personnel.
3. Provide documentation of any past/pending malpractice/tort claims.
4. Provide a list of four (4) professional references.
FACTOR 3: PRICE
The offer should contain the offeror’s best terms from a price standpoint. In determining the competitive range, price will be considered. Unreasonably low or incomplete proposed prices may be grounds for eliminating a proposal from competition either on the basis that either the offeror does not understand the requirement or the offeror has made an unreasonable or incomplete price proposal.
For the purposes of the award of this Contract, the Government intends to evaluate the option to extend services under FAR 52.217-8 as follows: The evaluation will consider the possibility that the option can be exercised at any time and can be exercised in increments of one to six months, but for no more than a total of six months during the life of the contract. The evaluation will assume that the prices for any option exercised under FAR 52.217-8 will be at the same rates as those in effect under the contract at the time the option is exercised. The evaluation will therefor assume that the addition of the price or prices of any possible extension or extensions under FAR 52.217-8 to the total price for the basic requirement and the total price for the priced options has the same effect on the total price of all proposals relative to each other and will not affect the ranking of proposals based on price, unless, after reviewing the proposals, the Government determines that there is a basis for finding otherwise. This evaluation will not obligate the Government to exercise any option under FAR 52.217-8.
Although the price proposal is lower than the others in importance, it will contribute to the source selection decision. The price proposal will be evaluated in terms of fairness and reasonableness. After an evaluation of the Technical Excellence, Past Performance criteria have been completed, price will be compared against these evaluations to determine the combination that is most likely to provide the best value to the Government, utilizing the tradeoff process.
File details come from the government source that posted it. Updated .