This document provides details for a federal solicitation for sprinkler and alarm repair services. The solicitation is being conducted by the NCO 23 Contracting Office for the IOWA CITY VA Health Care System and seeks proposals for requirements including sprinkler and alarm repair. Questions regarding the solicitation should be directed to the points of contact listed, Erica Miller at erica.miller5@va.gov. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23. Proposals are sought for repair services to support the Iowa City VA Health Care System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - AMENDMENT 36C26324Q0337 0002.pdf | ||
| NWI-VAHCS Base Year Inspection Schedule 2023-2024.xlsx | XLSX spreadsheet | |
| S02 - AMENDMENT 36C26324Q0337 0001.pdf | ||
| S02 - 36C26324Q0337.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Intro
The Joint Commission
Life Safety & Environment of Care Document List and Review Tool
The following pages present documentation required by the Hospital Accreditation Program Life Safety (LS), and selected Environment of Care (EC) standards. The Life Safety surveyor will begin review of these documents soon after arrival for the onsite survey.
Surveyors may request other EC and LS documents, as needed, throughout the survey.
This list also includes some elements of performance that do not require documentation but appear as reminders to both organizations and surveyors of these expectations.
Organizations may want to consider using this tool in their continuous compliance and survey readiness efforts.
EC.02.03.05
| Omaha Sept 2023 - Sept 2024 | Grand Island Sept 2023 - Sept 2024 | ||||||
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Q1 | |
| Semi | Q2 | Q3 | |||||
| Semi | Q4 | ||||||
| Annual | Frequency | Q1 | |||||
| Semi | Q2 | Q3 | |||||
| Semi | Q4 |
Annual
| EC.02.03.05 | Fire Protection and Suppression Testing and Inspection | |||||||||
| EP 1 | Supervisory Signals-including: Control valves; pressure supervisory; pressure tank; pressure supervisory for a dry pipe (both high and low conditions); steam pressure; water level supervisory signal initialing device; water temperature supervisory; and room temperature supervisory. | Quarterly | 6-8 DEC 2023 | 23-31 OCT (Still need to test the mental health ward, and the EEO department where we did not have access | Quarterly | 4-5 DEC 2023 | 9-11 OCT | |||
| EP 2 | Water flow devices | Semiannual | 6-8 DEC 2023 | 23-31 OCT 2023 | Semiannual | 4-5 DEC 2023 | 9-11 OCT | |||
| Tamper Switches | Semiannual | 6-8 DEC 2023 | 23-31 OCT 2023 | Semiannual | 4-5 DEC 2023 | 9-11 OCT | ||||
| EP 3 | Duct, heat, smoke detectors, and manual fire alarm boxes | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 4 | Notification devices (audible & visual) and door-releasing devices | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 5 | Emergency services notification transmission equipment | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 6 | Electric motor-driven fire pumps tested under no-flow conditions | Monthly | N/A | Monthly | N/A | |||||
| Diesel-engine-driven fire pumps tested under no-flow conditions | Weekly | NA | Weekly | NA | ||||||
| EP 7 | Water storage tank high and low level alarms | Semiannual | NA | NA | Semiannual | NA | NA | |||
| EP 8 | Water storage tank low water temp alarms (cold weather only) | Monthly | NA | Monthly | NA | |||||
| EP 9 | Sprinkler systems main drain tests on all risers | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 10 | Fire department connections inspected (Fire hose connections N/A) | Quarterly | 6-8 DEC 2023 | 23-31 OCT 2023 | Quarterly | 4-5 DEC 2023 | 9-11 OCT | |||
| EP 11 | Fire pump(s) tested – under flow | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 12 | Standpipe flow test every 5 years | 5 years | 6 years | |||||||
| EP 13 | Kitchen suppression semiannual testing | Semiannual | 25-27 SEP 2023 | 18-19 MAR 2024 | Semiannual | 28-29 SEP 2023 | 11-Mar-24 | |||
| EP 14 | Gaseous extinguishing systems inspected (no discharge req.) | Annually | N/A | Annually | N/A | |||||
| EP 15 | Portable fire extinguishers inspected monthly | Monthly | SEP, OCT, NOV, and DEC Completed (DEC Reports are coming) | Monthly | SEP, OCT, NOV and DEC Complete (reports are coming for DEC) | |||||
| EP 16 | Portable fire extinguishers maintained annually | Annually | Planned 3-11 to 3-15 | Annually | Planned 3-18 to 3-20 | |||||
| EP 17 | Fire hoses hydro tested 5 years after install; every 3 years thereafter | 5 years/ | ||||||||
| 3 years | N/A | 6 years/ | ||||||||
| 3 years | N/A | |||||||||
| EP 18 | Smoke and fire dampers tested to verify full closure | 1 year after install | 2 year after install | |||||||
| At least every 6 years thereafter | At least every 6 years thereafter | |||||||||
| EP 19 | Smoke detection shutdown devices for HVAC tested | Annually | Annually | |||||||
| EP 20 | All horizontal and vertical roller and slider doors tested | Annually | 23-31 OCT 2023 | Annually | 9-11 OCT | |||||
| EP 25 | Inspection and testing of door assemblies by qualified person. Does not include nonrated doors, including corridor doors to patient care rooms and smoke barrier doors. | Annually | 23-31 OCT | Annually | 9-11 OCT | |||||
| EP 27 | Elevators with firefighters’ emergency operations | 9-11 OCT | ||||||||
| EP 28 | Documentation of maintenance testing and inspection activities for EPs 1-20 and 25 includes: activity name; date; inventory of devices, equipment or other items; frequency; contact info for person performing activity; NFPA standard; activity results | Pending | All submitted on 2 NOV except for Fire Alarm | Pending | Annual Tests submitted on 12 OCT | |||||
| COMMENTS: |
EC.02.05.07
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Yes | No--Missing Date |
| EC.02.05.07 | Emergency Power Systems are Maintained and Tested | ||||||
| EP 1 | At least monthly performs functional test of emergency lighting systems and exit signs required for egress and task lighting for a minimum duration of 30 seconds, along with a visual inspection of other exit signs | Monthly | |||||
| EP 2 | Every 12 months performs functional test of battery powered lights on the inventory required for egress and exit signs for a duration of 1 ½ hours |
For new construction, renovation, or modernization battery-powered lighting in locations where deep sedation and general anesthesia are administered is tested annually for 30 minutes with test results and completion
| dates documented | Annually | ||
| EP 3 | Functional test of Level 1 SEPSS, monthly; Level 2 SEPSS, quarterly, for 5 minutes or as specified for its class Annual test at full load for 60% of full duration of its class | Monthly |
Quarterly Annually
| Note 1: Non-SEPSS tested per manufacturer’s specifications | Per Mfr. | |
| Note 2: Level 1 SEPSS defined for critical areas and equipment | ||
| Note 3: Class defines minimum time which SEPSS is designed to operate at rated load without recharging | ||
| EP 4 | Emergency power supply system (EPSS) inspected weekly, including all associated components and batteries | Weekly |
| EP 5 | Emergency generators tested monthly for 30 continuous minutes under load (plus cool down) | Monthly |
| EP 6 | Monthly load test for diesel-powered emergency generators conducted with dynamic load at least 30% of nameplate rating or meets mfr. recommended prime movers’ exhaust gas temperature; OR | |
| Monthly | ||
| Emergency generators tested once every 12 |
months using supplemental loads of 50% of nameplate rating for 30 minutes, followed by 75% of nameplate rating for 60 minutes for
| total of 1 ½ continuous hours | Annually | ||
| EP 7 | All automatic and manual transfer switches monthly/12 times per year with results and completion dates documented | Monthly | |
| EP 8 | Fuel quality test to ASTM standards | Annually | |
| EP 9 | Generator load test once every 36 months for 4 hours | 36 Months | |
| EP 10 | Generator 4 hour test performed at, at least 30% nameplate | 36 Months | |
| COMMENTS: |
EC.02.05.09
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | THIS MAY BE SCORED AS CONDITIONAL OR STANDARD | Testing Dates | |
| YES | NO | ||||||
| EC.02.05.09 | Medical Gas and Vacuum Systems are Inspected and Tested | ||||||
| EP 7 | Test, inspect and maintain critical |
components of piped medical gas and vacuum systems, waste anesthetic gas disposal (WAGD), and support gas systems on the inventory.
Inventory of critical components includes at least all source subsystems, control valves, alarms, manufactured assemblies containing patient gases, and inlets and outlets with activities, dates and results documented
No prescribed frequency; recommend risk
| assessment if < annual | Per Policy | ||
| EP 8 | Location of and signage for bulk oxygen systems | On Bldg. Tour | |
| EP 9 | Emergency oxygen supply connection | On Bldg. Tour | |
| EP 10 | Review medical gas installation/modification/breech certification results for cross connection, purity, correct gas, and pressure | As applicable | |
| EP 11 | Medical gas supply and zone valves are accessible and clearly labeled | On Bldg. Tour | |
| EP 12 | Handling, transfer, storage, labeling, transfilling of cylinders | Per Policy | |
| COMMENTS: |
LS.01.01.01
| Standard | ||||||
| EPs | C | NC | NA | Document/Requirement | YES | NO |
| LS.01.01.01 | Buildings serving patients comply with NFPA 101 (2012) | |||||
| EP 1 | Individual assigned to assess Life Safety Code® compliance | |||||
| EP 2 | Building Assessment to determine compliance with Life Safety (LS) chapter (frequency of assessment is defined by the hospital)/ | |||||
| EP 3 | Current and accurate drawings w/ fire safety features & related square footage |
a. Areas of building fully sprinklered (if building only partially sprinklered)
b. Locations of all hazardous storage areas
c. Locations of all fire-rated barriers
d. Locations of all smoke-rated barriers
e. Sleeping and non-sleeping suite boundaries, including size of identified suites
f. Locations of designated smoke compartments g. Locations of chutes and shafts
h. Any approved equivalencies or waivers
| EP 5 | Deemed Hospitals: Documentation of inspections and approvals made by state or local AHJs |
| COMMENTS: |
LS.01.02.01
| Standard | |||||||||
| EPs | C | NC | NA | Document/Requirement | Addressed in Policy? | Implemented as Required? | |||
| YES | NO | YES | NO | ||||||
| LS.01.02.01 | Interim Life Safety Measures (ILSM) | ||||||||
| EP 1 | ILSM policy identifying when and to what extent ILSM implemented | ||||||||
| EP 2 | Alarms out of service 4 or more hours in 24 hours or sprinklers out of service more than 10 hours in 24 hours in an occupied building - Fire watch / Fire Dept. notification | ||||||||
| EP 3 | Signs for alternate exits posted | ||||||||
| EP 4 | Daily inspection of routes of egress (See also 19.7.9.2 RE: daily inspections) | ||||||||
| EP 5 | Temporary but equivalent systems while system is impaired | ||||||||
| EP 6 | Additional firefighting equipment provided | ||||||||
| EP 7 | Smoke tight non-combustible temporary barriers | ||||||||
| EP 8 | Increased surveillance implemented | ||||||||
| EP 9 | Storage and debris removal | ||||||||
| EP 10 | Additional training on firefighting equipment | ||||||||
| EP 11 | Additional Fire drill per shift per quarter | ||||||||
| EP 12 | Temporary systems tested and inspected monthly | ||||||||
| EP 13 | Additional training on building deficiencies, construction hazards, temp measures | ||||||||
| EP 14 | Training for impaired structural or impaired compartment fire safety features | ||||||||
| EP 15 | Other ILSMs | ||||||||
| COMMENTS: |
EC.02.03.01
| Standard | ||||||
| EPs | C | NC | NA | Document/Requirement | YES | NO |
| EC.02.03.01 | Hospital Manages Fire Risk - Fire Response Plan |
| EP 9 | The written fire response plan describes the specific roles |
of staff and LIPs at and away from fire including
• When and how to sound and report fire alarms
• How to contain smoke and fire
• How to use a fire extinguisher
• How to assist and relocate patients
• How to evacuate to areas of refuge Staff and LIPs periodically instructed on/kept informed of duties under plan Copy of plan readily available with telephone operator or security
COMMENTS:
EC.02.03.03
| Standard | |||||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Q1 | Q2 | Q3 | Q4 |
Annual
| EC.02.03.03 | Fire Drills | |||
| EP 1 | Fire drills once per shift per quarter in health care occupancies; Quarterly in each building defined as ambulatory health care occupancy (If available, please provide five quarters of fire drill data) | Quarterly | ||
| EP 2 | Fire drills every 12 months from date of last drill: Business Occupancies | Annually | ||
| EP 3 | When quarterly fire drills are required, ALL are unannounced | |||
| • Drills held at unexpected times and under varying conditions – greater than one hour apart • Drills include transmission of fire alarm signal and simulation of emergency fire conditions | Quarterly (See fire drill matrix) | |||
| EP 4 | Staff participate in the drills according to the hospital's fire response plan | YES | NO |
EP 5 Critiques include fire safety equipment and building features, and staff response YES NO
COMMENTS:
EC.02.04.01
| Standard | ||||||
| EPs | C | NC | NA | Document/Requirement | YES | NO |
| EC.02.04.01 | Management of Medical Equipment Risks |
| EP 2 | Non-deemed status requirement: Maintains either a written inventory of all medical equipment or a written inventory of selected equipment categorized by physical risk associated with use (including all life-support equipment) and equipment incident history. |
Evaluates new types of equipment before initial use to determine whether they should be included in the inventory.
OR Deemed status requirement: Maintains a written inventory of all medical equipment.
| EP 3 | High-risk medical equipment identified on the inventory |
| EP 4 | Inventory includes activities and associated frequencies for maintaining, inspecting, and testing all medical equipment on the inventory. |
Activities and associated frequencies are in accordance with manufacturers’ recommendations or with strategies of an alternative equipment maintenance (AEM) program.
COMMENTS:
EC.02.04.03
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Yes | No--Missing Date |
| EC.02.04.03 |
Medical Equipment Inspection, Testing, and Maintenance
EP 2 All high-risk equipment.
Note 1: High-risk equipment includes medical equipment for which there is a risk of serious injury or even death to a patient or staff member should it fail, which includes life-support equipment.
Note 2: Required activities and associated frequencies for maintaining, inspecting, and testing of medical equipment completed in accordance with manufacturers’ recommendations must have a 100% completion rate.
Note 3: Scheduled maintenance activities for high-risk medical equipment in an alternative equipment maintenance (AEM) program inventory must have a 100% completion rate. AEM frequency is determined by the hospital's AEM program.
EP 3 Non-high-risk equipment identified on the medical equipment inventory Note: Scheduled maintenance activities for non-high-risk medical equipment in an alternative equipment maintenance (AEM) program inventory must have a 100% completion rate. AEM frequency is determined by the hospital’s AEM program.
| EP 4 | Conducts performance testing of and maintains all sterilizers |
| EP 10 | All occupancies containing hyperbaric facilities comply with construction, equipment, administration, and maintenance requirements of NFPA 99-2012: Chapter 14 |
| COMMENTS: |
EC.02.05.01
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Yes | No--Missing Date |
| EC.02.05.01 | Manages risks associated with utility systems |
EP 3 Non-deemed status requirement: Maintains written inventory of all operating components of utility systems or maintains a written inventory of selected operating components of utility systems based on risks for infection, occupant needs, and systems critical to patient care (including all life-support systems).
Evaluates new types of utility components before initial use to determine whether they should be included in the inventory.
Deemed status requirement: Maintains written inventory of all operating components of utility systems.
EP 4 Identifies high-risk operating components of utility systems on the inventory for which there is a risk of serious harm or death to a patient or staff member should the component fail.
Note: High-risk utility system components include life-support equipment.
EP 5 Identifies activities and associated frequencies, in writing, for inspecting, testing, and maintaining all operating components of utility systems on the inventory. These activities and associated frequencies are in accordance with manufacturers’ recommendations or with strategies of an alternative equipment maintenance (AEM) program.
Note 1: The strategies of an AEM program must not reduce the safety of equipment and must be based on accepted standards of practice. * Note 2: For guidance on maintenance and testing activities for Essential Electric Systems (Type I), see NFPA 99-2012: 6.4.4. Footnote *: An example of guidelines for physical plant equipment maintenance is the American Society for Healthcare Engineering (ASHE) book Maintenance Management for Health Care Facilities.
EP 14 Minimizes pathogenic biological agents in cooling towers, domestic hot- and cold-water systems, and other aerosolizing water systems Deemed status requirement: Review the following policies, procedures and reports:
• Facility risk assessment to identify where Legionella and other opportunistic waterborne pathogens could grow and spread in the facility water system
• Water management program that considers the ASHRAE industry standard and the CDC toolkit
• Testing protocols and acceptable ranges for control measures o Documented results of testing o Corrective actions taken when control limits are not maintained EP 15 In critical care areas designed to control airborne contaminants (such as biological agents, gases, fumes, dust), the ventilation system provides appropriate pressure relationships, air-exchange rates, filtration efficiencies, temperature and humidity. (form of and frequency of assessment per hospital policy)
Note: For more information about areas designed for control of airborne contaminants, the basis for design compliance is the Guidelines for Design and Construction of Health Care Facilities, based on the edition used at the time of design (if available).
| EP17 | Distribution maps of utility systems |
| COMMENTS: |
EC.02.05.05
| Standard | |||||||
| EPs | C | NC | NA | Document/Requirement | Frequency | Yes | No--Missing Date |
| EC.02.05.05 | Utility System Inspection, testing and maintenance |
EP 4 High-risk utility system components on the inventory with completion date and results of activities documented
Note 1: A high-risk utility system includes components for which there is a risk of serious injury or even death to a patient or staff member should it fail, which includes life-support equipment.
Note 2: Required activities and associated frequencies for maintaining, inspecting, and testing of utility systems components completed in accordance with manufacturers’ recommendations must have a 100% completion rate.
Note 3: Scheduled maintenance activities for high-risk utility systems components in an alternative equipment maintenance (AEM) program inventory must have a 100% completion rate.
EP 5 Infection control utility system components on the inventory with completion date and results of activities documented
Note 1: Required activities and associated frequencies for maintaining, inspecting, and testing of utility systems components completed in accordance with manufacturers’ recommendations must have a 100% completion rate.
Note 2: Scheduled maintenance activities for infection control utility systems components in an alternative equipment maintenance (AEM) program inventory must have a 100% completion rate.
EP 6 Non-high-risk utility system components on the inventory with completion date and results of activities documented
Note: Scheduled maintenance activities for non-high-risk utility systems components in an alternative equipment maintenance (AEM) program inventory must have a 100% completion rate. AEM frequency is determined by the hospital AEM program.
COMMENTS: