Low Voltage IDIQ Solicitation Questions and Responses (2 pages).pdf

PDF 186 KB Posted

Attached to
Z1DA--Project: Low Voltage - Indefinite Delivery Indefinite Quantity (IDIQ) Contract Lowest Price Technically Acceptable Federal contract opportunity
Solicitation number
36C26320R0102
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Project: Low Voltage - Indefinite Delivery Indefinite Quantity (IDIQ) Contract Lowest Price Technically Acceptable, newest first.
File Type Posted
36C26320R0102 0002.docx DOCX document
Low Voltage IDIQ Price Schedule Sheet_updated 5.29.20 (1 page).xlsx XLSX spreadsheet
Redacted Justification for Single Source_Panduit (2 pages).pdf PDF
36C26320R0102 0001.docx DOCX document
Low Voltage IDIQ Site Visit Sign-In and Agenda 5.11.20 (2 pages).pdf PDF
Low Voltage IDIQ Price Schedule Sheet_updated 5.15.20 (1 page).xlsx XLSX spreadsheet
36C26320R0102-011.pdf PDF
36C26320R0102-008.pdf PDF
36C26320R0102-012.pdf PDF
36C26320R0102-007.docx DOCX document
36C26320R0102-009.xlsx XLSX spreadsheet
36C26320R0102-010.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Low Voltage IDIQ

Solicitation: 36C26320R0102 POC: Teresa Kohlbeck, Contract Specialist, teresa.kohlbeck@va.gov

May 20, 2020

RFP Questions and Responses

Question: 1 ‐ Bid Bond (2 questions received, same topic)

Can you tell me if a Bid Bond is required with our response to this solicitation? I understand that Bid Bonds may be required with each Task Order, but I want to make sure I provide one with our solicitation response if it’s required.

You are requiring a bid bond to be submitted with the bid, but our surety requires an estimated contract value per year to be able to issue a bid bond to us.

Answer: A Bid Bond is not required in response to this solicitation. A bid bond may be required with a Task Order (TO) depending on the anticipated value of the TO.

Question: 2 ‐ Panduit Brand Single Source

Is Panduit brand required?

Answer: Yes. The contract includes Panduit brand jacks, cables, patch panels and faceplates as specified in the project specifications. See attached document: Redacted Justification for Single Source_Panduit (2 pages).

Also, VAAR 852.236‐90 Restriction on Submission and Use of Equal Products is incorporated into this contract via

Amendment 1 to this solicitation.

Question: 3 – Subcontracting Limitations

For this contract since it is a NAICS Code 238210 which is a “specialty trade construction” we are assuming that the 25% self‐performance of installation labor is required by the prime contractor? Are there limitations on the percentage of the contract that can be subcontracted?

Answer: Correct, yes – 25% of labor must be completed by the prime contractor; and no more than 75% subcontracted to non‐SDVOSB.

Reference: VAAR Clause 852.219‐74 Limitations on Subcontracting—Monitoring and Compliance, and 13 CFR § 125.6:

In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

Question: 4 – OSHA certification/Superintendent

We are assuming that all persons performing labor are required to have either a OSHA 10 or OSHA 30 certification, do you require a 30 hour OSHA certified superintendent that is employed by the prime contractor to be onsite during all work that is performed?

Answer: Because these installs are small projects in nature, Superintendent will not be required to be on site. OSHA 10 or 30 is required for technicians.

Question: 5 ‐ Cable Install CLINs

On the bid form, CLINs 2, 3, 4, 5, 6, 9, 10, 11 are asking for installation of cable; for these items are we only including the cable material and cable install? Does the termination & testing get applied to CLINs 7, 8, 12, & 13? Note that cat 6 and

Cat 6A have a maximum individual run of 100 meters (330 feet) before they lose transmission quality; so would the quantity of 2000 LNFT on CLIN 0002 be for 6 or more individual runs of Cat 6 cable?

Answer:

Labor should be included when you are computing installed price of cable per LNFT.

The price of testing should be included with the Line item 7, 8, 12 & 13 because we are testing the integrity of the cable and terminals as a whole.

Cable runs will not exceed the 100 meter length. We are estimating there will be a total of 2000 feet of cable installed during the ordering period. Each run will vary in length.

Example:

Line item 0002 – 100 foot run: 100 ft x $X.00 = $X.00

Line item 0003 four additional 100 ft runs: 400 ft x $X.00 = $X.00

It is a total of 500 feet

Question: 6 ‐ Demolition

Should there be a line item for demolition?

Answer: Added line item 0039 for removing and relocating tip jack.

Question: 7 ‐ Patch Panel

Should there be a line item for a patch panel? Or relocating existing patch panels in the TR Rack to make room for new patch panels?

Answer: Added line item 0034, 0035, 0036, 0037 and 0038 for new patch panels. Added line item 0040 to move/relocate patch panel.

Question: 8 ‐ Wiremold

On CLIN 0021, what size wiremold (IE 700 series? I attached a factory brochure) are you requesting and do you want it supplied as a complete assembly with all material and labor provided by contractor?

Answer: 700 series is the correct wiremold raceway. Price should include complete wiremold assembly installed

(raceway, j‐box, and associated hardware).