36C26320B0003-004.docx
DOCX document Posted
- Solicitation number
- 36C26320B0003
About this file
36C26320B0003 SOW (4 pages).docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26320B0003-0004000.docx | DOCX document | |
| 36C26320B0003-0003000.docx | DOCX document | |
| 36C26320B0003-0002001.pdf | ||
| 36C26320B0003-0002000.docx | DOCX document | |
| 36C26320B0003-0001006.docx | DOCX document | |
| 36C26320B0003-003.docx | DOCX document | |
| 36C26320B0003-006.pdf | ||
| 36C26320B0003-005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Boiler Plant Stair Building 11 and DOM Anti Suicide Protection Building 5 Project Number 636A6-20-103 VA Central Iowa Health Care System
A. General Project Description: The projects are located at the VA Central Iowa Health Care System. Location: 3600 30th Street, Des Moines, IA 50310. Contractor shall complete two metal fabrication projects:
1. In Building 11 Boiler Plant, the existing stairs do not meet OSHA and applicable safety codes for rise height. New stairs are required to meet applicable design codes. Demolish the existing stairs and provide new steel stairs that meet applicable design code requirements.
2. In Building 5 Domiciliary in two similar stairwells, remove existing basement mesh panels with door and lock. Provide new mesh panels with door and lock. Provide new anti-suicide metal mesh panels inside stair center continuous vertically all three floors up to stair ceiling.
B. Summary of Building 11 Boiler Plant Work: Replace Stairs The successful Contractor shall perform the following work:
1. Conduct a site visit, field verify all dimensions and existing conditions.
2. Adhere to drawings, photographs, and specifications for additional project requirements and information.
3. Prepare and submit for approval complete shop drawings prepared by a licensed architect stair submittal that meets all applicable codes, including 29 CFR 1910.25(c)(2). Have a maximum riser height of 9.5 inches.
4. Remove and recycle off-site the existing metal stair system. Reference specification section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.
5. Provide temporary barriers at exposed upper landing during construction.
6. The new stairs shall be a 180 degree turn to accommodate the rise run requirements and overall length of stair. Riser clear dimension shall be 30” wide, treads shall be 10-7/8” deep. Landing shall be minimum of 30” deep. Existing height and length to wall limits are indicated on the photographs. Stair assembly, tread, and handrail material shall match as close as possible in scale, stair width, and finish of the existing stairs
7. See specification 05 51 00 METAL STAIRS for Industrial Stair requirements.
8. A minimum of 24” clearance is required between the front of the emergency boiler stop devise on existing east wall when with layout of new stairs.
9. Provide all work to patch and match existing materials and finishes all holes and connection points following removal of existing stairs. Grind welds smooth at handrail connections.
10. Provide a removable 10 gauge galvanized metal sheet plate direct to underside of upper flight of stairs that is removable for cleaning, similar to existing condition.
11. Provide all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the work summarized above.
12. Ensure that all new materials are on site PRIOR to commencing work to minimize the duration that the existing stairs are not accessible for the VA.
C. Summary of Building 5 Domiciliary Anti Suicide Protection Work: Install Metal Mesh Panels in Two Stairwells The successful Contractor shall perform the following work:
1. Conduct a site visit, field verify all dimensions and existing conditions.
2. Adhere to drawings, photographs, and specifications for additional project requirements and information.
3. Prepare and submit for approval shop drawings for the mesh panel system to replace the section with the door/lock, and for the three-floor mesh panels at stairwells. Include in submittal all framing, hardware, mesh system, braces, anchoring devises, door fabrication details, and all work for a complete system.
4. Remove and recycle the Level 1 existing wire mesh cage at stairwells. Reference specification section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.
5. Provide at Level 1 mesh panel system to enclose under the lowest level stair similar to existing. This system shall include a door and lock similar to existing. This mesh panel system material shall match the three-story stair mesh material.
6. Provide wire mesh panel system and framing extending from Level 1 up to ceiling above Level 3. The panel system shall be anchored at all four corners at each floor and at the top of the shaft to the ceiling. There is also a panel that shall extend from this shaft to the parallel wall to completely close at the top of the shaft. Include all framing, hardware, mesh system, braces, anchoring devises, door fabrication details, and all work for a complete system. Anchor the panel system at all four corners as required.
7. Paint at existing stairwell walls and ceilings may contain lead, so required removal procedures for fastening into these surfaces must follow specification section 028333.13 LEAD BASED PAINT REMOVAL AND DISPOSAL.
8. Include all work to patch and match existing materials and finishes all holes and connection points following removal of existing panels.
D. General Requirements:
1. Contractor firm shall provide licensed architect/engineers to prepare the submittals.
2. Changes in the Work: Any work that is not addressed by the contract and is considered a change order shall be immediately brought to the attention of the Contracting Officer. No “out-of-scope” or additional work shall be executed by the Contractor prior to negotiation with VA Central Iowa and approval by the Contracting Officer.
3. Ownership of Drawings: All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be and remains the sole property of the Government and may be used on any other work without additional compensation to the Contractor. With respect thereto, the Contractor agrees not to assert any rights and not to establish any claim under the design patent or copyright laws.
4. Environmental conditions shall be maintained to identified and adjacent spaces.
a. The Infection Control Risk Assessment (ICRA) will be developed during Pre- construction Phase and provided to the Contractor to incorporated into the construction. The ICRA will be developed after the submittals are approved, with all ICRA requirements to be included. This shall clarify dust and debris containment/control measures to be implemented to respond to construction methods.
5. All submittals shall be completed on AutoCAD (Version 2019) and PDF format. After project completion, as-built drawings shall be updated and submitted in AutoCAD and PDF format.
E. Design References
1. The Contractor shall incorporate, but not be limited to references for design, available at http://www.cfm.va.gov/til/spec.asp or from the Project Contracting Officer’s Representative:
a. Construction Criteria Base or Whole Building Design Guide
b. VA Central Iowa Health Care System Design Standards
c. VA Design Guides/Design Manuals
d. VA Master Specifications
e. VHA National CAD Standards and Details
f. International Building Codes, State and Federal Regulations, ASHRAE Standards
g. NFPA and Life Safety Code
h. VA Space Criteria
i. Fire Protection Design Manual
F. Proposed Construction Schedule (calendar days)
1. Milestone Schedule for complete project:
a. Task Order Awarded – D-Day
b. Pre-construction conference/Initiate Design – D+7
c. Notice to Proceed – D+14
d. 100% Submittals submission – D+51
e. 100% Submittals review completed by VAMC – D+65
f. Completed construction – D+180
2. Project Schedule Requirements
a. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements, and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for submittal preparation, fabrication, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized.
b. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and progress reporting with and to the Contracting Officer's Representative (COR).
c. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.
d. Schedule shall be updated monthly at a minimum and submitted with the Payment Application each month.
3. Responsibility for Completion: If it becomes apparent from the current revised monthly progress schedule that phasing or contract completion dates will not be met, the Contractor shall execute some or all of the following remedial actions:
a. Increase construction manpower in such quantities and crafts as necessary to eliminate the backlog of work.
b. Increase the number of working hours per shift, shifts per working day, working days per week, the amount of construction equipment, or any combination of the foregoing to eliminate the backlog of work.
c. Reschedule the work in conformance with the specification requirements.
d. Prior to proceeding with any of the above actions, the Contractor shall notify and obtain approval from the COTR for the proposed schedule changes. If such actions are approved, the representative schedule revisions shall be incorporated by the Contractor into the Project Schedule before the next update, at no additional cost to the Government.
G. The C&A requirements do not apply, and that a Security Accreditation Package is not required.
H. Location of work of this construction project will not be located in any area that has access to VA sensitive information.