36C26320B0003-0003000.docx

DOCX document Posted

Attached to
636A6-20-103, Boiler Plant Stair and DOM Anti Suicide Protection (DM)
Solicitation number
36C26320B0003
Issued by

About this file

36C26320B0003 0003 36C26320B0003 0003.docx

View the file

Other files

File Type Posted
36C26320B0003-0004000.docx DOCX document
36C26320B0003-0002001.pdf PDF
36C26320B0003-0002000.docx DOCX document
36C26320B0003-0001006.docx DOCX document
36C26320B0003-003.docx DOCX document
36C26320B0003-004.docx DOCX document
36C26320B0003-006.pdf PDF
36C26320B0003-005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 OF

02-27-2020 636-20-2-9284-0011 636A6-20-103 36C263 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha

NE

68102-2077 36C263 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha

NE

68102-2077 To all Offerors/Bidders

36C26320B0003 01-31-2020

X X X

March 3, 2020 at 1:00 PM (CST)

636-3600162-9284-854200-3220 23NRNR009

X Project #: 636A6-20-103, Boiler Plant Stair DOM Anti Suicide Protection, Des Moines, Iowa VA Contracting POC: Christine Mason, phone: (402) 996-3528,email: christine.mason3@va.gov

The questions and answers response to all offerors/bidders is attached.

Sharon A. Spohn NCO 23 Contracting Officer

NCO2315L3-0644

Solicitation Questions and Answers 636A6-20-103 - Boiler Plant Stair and DOM Anti Suicide Protection

#
SOW Reference
Question
Answer

1.

Would we be allowed to use a 10 ga. wire (0.135” dia) 1 ½” diamond intercrimp mesh infill (as seen in the pictures you attached on the panels). I have attached a spec for you to review. It would serve the same function as the McNichols product called out in the spec and strength would not be compromised. Please review the attached spec and let us know.

No, we require the mesh called for in the specs.

2.

Can the entire structure be painted? Does the entire structure need to be stainless steel or does just the mesh need to be stainless steel?
We require the mesh called for in the specs.

We will accept entire structure painted.

3.

What clearance is the structure required to have from the handrail?
NFPA 101 7.2.2.4.5.5 requires 2 ¼” clearance between the handrail and the wall/fence which it’s fastened to.

4.

Do we have to have the two doors keyed to a VA master key or will the VA take care of buying lock cylinders?
The VA will provide the lock cylinder

5.

Will the fire sprinkler have to be relocated when the structure goes to the ceiling? (specific clearance of objects from the sprinkler) NFPA
No, the fire sprinkler head will not need to be relocated. The structure must maintain 18” clearance from the sprinkler head. The structure will not be allowed to be secured to the sprinkler pipe.

6.

Does the floor, stairwell, or ceiling have asbestos and require special attention when drilling into
No asbestos present in the walls, floor, or ceiling.

7.

Are footings required for the Boiler Plant Stairs? Are footing already there for the new landing? How thick is the slab? Will support without additional footings?
Slab is 6”. No extra footings are required.

8.

Is there any door required for the Mesh Panels? No door on the plan drawings, but it is mentioned in the specifications. The pictures on files show a door but some of the pictures are from another building and not in Building 5.
Yes, a door is required for the space under the first landing.

9.

Is there any mesh panels required under the first landing? Not shown on drawing but want clarification.
Yes, a door and mesh panels are required for the space under the first landing.

10.

Is Stainless panels only option for pricing?
We require the mesh called for in the specs.

11.

Would you like a price option for Hot Dipped Galvanized same as used at VA in Detroit?
No

12.

How would you like the proposal to be submitted? Electronically?

How would you like the Bid Bond Submitted? Original and electronically?

Since this is a sealed bid, we will require a hard copy of the proposal. Bonds are always hard copy. Electronic will not be accepted.

13.

Can the entire structure be painted? (or does the entire structure need to be stainless steel, just mesh need to be stainless steel)
Refer to answer to question 2.

14.

What clearance is the structure required to have from the handrail?

Refer to answer to question 4.

15.

Will the fire sprinkler have to be relocated when the structure goes to the ceiling? (specific clearance of objects from the sprinkler) If so, since there is no spec, what will the sprinkler requirements be?

Refer to answer to question 5.

16.

Has there been a hazardous material study done for the stairwell? The specs include lead paint abatement, but there is no quantity or scope to price. Would the VA prefer to have the contractors include an allowance for removals since the quantity is unknown?

No, do not include an allowance for abatement. There is no asbestos present in the walls, floor, or ceiling. No lead paint is present in the walls and floor, the ceiling can be checked when it can be reached.

17.

Will there be a painting spec included in the project as we are patching existing?
There is no painting spec. Touch up paint should use Sherman Williams SW61060 Kilim Beige, sheen to match.

18.

What submittals need to be prepared by a licensed architect / engineer?
Plans, Details, Elevations, Materials, Calculations.

19.

Submittals and As Builts are being requested in AutoCAD, which will be an additional cost to the government. As the current drawings are not in AutoCAD, what portions of the submittals and As Builts need to be in AutoCAD?
Submittals can be in PDF form. As Built should be provided in AutoCAD and pdf.

20.

The scope of work tells us to incorporate several references for design. Outside of the design of the stairs and mesh cage, what are the design requirements that we will be expected to adhere to? There are several items in that list that do not appear to be applicable to for designing stairs and cage mesh.
These are for use as reference as they apply.

21.

Is the general contractor required to use an electronic submittal program like Submittal Exchange or Procore?
Yes, Submittal Exchange will be provided by the VA for this project.

22.

Can the superintendent and the SSHO be the same person on this project?

Yes.

23.

Is Tuberculosis screening required on this project?

We require the specification to be followed.

24.

Has the paint ever tested for lead? Was a report produced? Were any steps taken to remediate? Are all fastening into these surfaces to be treated as if they do contain lead?
Refer to answer to question 17.

25.

There is a light on the soffit at the top floor that will likely need to be relocated. Can you confirm the scope is to include the relocation of the light? Is the fixture to be reused or provide new?

This light will not need to be relocated. The mesh panel will be above the light per sketch in solicitation package,