This federal contract opportunity and related amendment provide details for the demolition of multiple outdated buildings at the Nebraska-Western Iowa Health Care System campus in Omaha, Nebraska. The solicitation seeks a contractor to furnish all labor, equipment, materials and permits to demolish the structures within 90 calendar days of receiving a notice to proceed. The work includes preparation of the site for operations, demolition and removal of the existing structures, and disconnection of electrical, HVAC, sewer and water utilities. The contractor must also remove all debris from the property. The solicitation number is 36C26320B0002 and proposals are due on February 7, 2020. The project value is between $100,000 to $250,000 and has a NAICS code of 238910. The opportunity is set aside for service-disabled veteran-owned small businesses.

36C26320B0002 0002 36C26320B0002 0002.docx

View the file

Other files

File Type Posted
36C26320B0002-0001000.docx DOCX document
36C26320B0002-019.pdf PDF
36C26320B0002-017.pdf PDF
36C26320B0002-016.docx DOCX document
36C26320B0002-020.pdf PDF
36C26320B0002-018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-26-2020 636-18-302 N 36C236 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077 36C236 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha NE 68102-2077 To all Offerors/Bidders

36C26320B0002 02-11-2020

X X X

X The purpose of this amendment is to:

1. Inform bidders to meet on the concourse level in the break room no later than 1245 PM (CT) on March 4, 2020 for a bid opening time of 1:00 PM (CT).

2. Provide Vendor Questions and Answers (See page 2).

Shane Hilts Contracting Officer

VA-VHA-2020-5BEABA2B

VENDOR QUESTION AND ANSWERS

1. Is there any requirement for Asbestos Abatement/ORM Removal or Lead Paint removal for the above referenced bid project for The Department Of Veterans Affairs?

ANSWER: Yes, there was a complete study done and included in the solicitation.

2. Do any of the buildings currently have fire suppression that will need to be isolated before demolishing?

ANSWER: No

3. The existing parking lot noted as the staging area is in rough shape. Does the area need to be replaced after construction? Will we be held responsible for repairing the area since it is already damaged throughout?

ANSWER: No, return existing grade to consider slope and runoff.

4. Are there any reserved items that we will need to relocate per 1.8 A 1. In the spec?

ANSWER: No

5. Have all of the structures been tested for PCBs per 1.8 A 4 in Specs? Please identify if not provided.

ANSWER: No lead testing was conducted.

6. Will there be certain elevation requirements for backfill? No civil elevations were provided.

ANSWER: The site when finished will match existing grade.

7. Will Local Demolition Permits be required with the City of Omaha?

ANSWER: No

8. “I may have missed it but didn’t see anything about refrigerant recovery. Will this be done before we take over the site?”

ANSWER: Any HVAC units will be removed before turnover.