36C26319Q0995-003.docx
DOCX document Posted
- Attached to
- Service | Emergency/Backup Generator Maintenance and Load Bank Testing | Base plus 4 option years Federal contract opportunity
- Solicitation number
- 36C26319Q0995
- Issued by
- Department of Veterans Affairs
About this file
36C26319Q0995 VA BHHCS Emergency Generator Maintenance Chk Lst - Attachment B.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26319Q0995-002.docx | DOCX document | |
| 36C26319Q0995-004.docx | DOCX document | |
| 36C26319Q0995-001.docx | DOCX document | |
| 36C26319Q0995-001.docx | DOCX document | |
| 36C26319Q0995-002.docx | DOCX document | |
| 36C26319Q0995-004.docx | DOCX document | |
| 36C26319Q0995-003.docx | DOCX document | |
| 36C26319Q0995-000.docx | DOCX document | |
| 36C26319Q0995-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B
May/June– PREVENTIVE and MAINTENANCE INSPECTION REPORT EMERGENCY GENERATOR SETS - FORT MEADE AND HOT SPRINGS VA MEDICAL CENTERs
FORT MEADE AND HOT SPRINGS, SD
Equipment Location: _____________________________ Date of Inspection: ________________
| Engine: | ________________________________ EE ID #: ____________________ |
| Generator: _______________________________ | Hour Meter Reading: ______________ |
Inspection Data Code X=Checked Okay A=Additional Work Required R=Required Adjustment or Repair C=Critical Repair Required N/A=Not Applicable
______ 1. Check and adjust as required, mechanical fasteners, mounts, braces, and safety devices.
______ 2. Inspect engine and generator mounts.
______ 3. Examine all duct work and louvers.
______ 4. Checked condition of hoses and tighten clamps.
______ 5. Check engine coolant pump and coolant leaks.
______ 6. Check engine antifreeze solution ______degrees.
______ 7. Check engine block heater.
______ 8. Check for fuel or oil leaks.
______ 9. Check and adjust drive belts.
______10. Check all fluid levels.
______ 11. Inspect engine condition.
______ 12. Check crankcase breather.
______ 13. Check governor sensitivity and droop.
______ 14. Check all linkage and ball joints on governor.
______ 15. General inspection of all governor components.
______ 16. Lubricate all grease fittings.
______ 17. Inspect starter motor and check solenoid.
______ 18. Clean/inspect battery terminals, read gravity, and provide reading ___________
______ 19. Check battery charger for proper operation.
______ 20. Complete general inspection of exhaust system.
______ 21. Check for wet stacking.
______ 22. Check all safety shutdown and alarm circuits.
______ 23. Inspect generator condition.
______ 24. Inspect generator end bearing.
______ 25. Check condition of electrical wiring, secure in holder where broken or loose.
______ 26. Test transfer switch.
______ 27. Check day tank operation.
______ 28. During exercise operation, check for any unusual vibration or noise.
______ 29. Blow out any accumulation of dust in generator and ATS with clean, dry compressed air.
______ 30. Clean exterior of radiator.
_______31. Take megger reading of main rotor winding and record ____________________
_______32. Take megger reading of main stator winding and record ____________________
_______33. Take megger reading of exciter rotor and record ________________________
_______ 34. * Change oil per manufactures recommendations
NA_____35. Change fuel filter(s)
NA_____36. Change air filter(s)
NA_____37 Change oil filter(s)
NA_____38. Take oil sample and provide analysis report.
NA_____39. Take coolant sample and provide analysis report.
NA_____40. Take fuel sample and provide analysis report.
NA_____41. Load bank test annually per requirements and provide test report.
*Oil changes will be addressed and scheduled based on hour meter readings and will be addressed outside the scope of this contract. Contact FM/HS POC’s for approval before commencement of this work.
Comments: ____________________________________________________________________
Report Completed by: ______________________ Company: ____________________________
Submit report with recommendations, actions taken, etc. to Facility POC within 30 days of completion of inspection.