Questions and Answers Life Safety Drawing .docx
DOCX document 32 KB Posted
- Attached to
- Life Safety Drawings
- Solicitation number
- 36C26227Q0047
About this file
This is a Questions and Answers document related to Life Safety Drawing services for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 (Solicitation Number 36C26227Q0047). The document serves as a reference guide addressing inquiries from potential contractors regarding the solicitation requirements and expectations.
The underlying contract opportunity involves conducting mock audits, actions, and recommendations in accordance with The Joint Commission's (TJC) Physical Environment components and current Memoranda of Understanding and categorical waivers between VHA and TJC. Assessment activities must relate to the National Fire Protection Association (NFPA) 101 Life Safety Code and are designed to identify Environment of Care and Life Safety deficiencies to prepare facilities for accreditation surveys by TJC. The specific details regarding response dates, award dates, pricing terms, contract vehicle type, and set-aside status are not provided in this Questions and Answers file itself.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Life Safety Drawings
1. Can you confirm the due date for this RFQ is 11/20/2026 and not 11/04/2026. RFQ will close on 11/20/2026 at 3pm MST.
1. What is the anticipated award date of contract? NLT 12/08/2026
1. Under General Requirements it states all work to be completed by December. Can you please clarify if this is December 2026 or 2027? CY27 Q2.
| No. |
| Solicitation Reference |
| Question / Clarification Requested |
| Pricing/Scope Impact |
| 1 |
| SOW 6 (p. 34); |
B.2 Period of Performance (p. 4) The SOW requires completion “by end of December,” but the base period of performance begins 12-09-2026. Confirm the required draft and Staffing and schedule final delivery dates for the base year and the target survey and delivery month for each option year. December 8, 2027, for the Base year. For each Option Year has the final delivery date as stated 12/08/2028 OY1; 12/08/2029 OY2; 12/08/2030 OY3; 12/08/2031 OY4.
| 2 |
| SF1449 Block 8 and p. 1; E.1 (p. 42) |
| The SF1449 lists offers due 11-20-2026 and questions due 11-14-2026, while E.1 lists Nov 4 and Oct 30. The subject line on p. 1 shows RFQ 36C26226Q0047 rather than 36C26227Q0047. |
Confirm the governing dates and RFQ number. Questions are due 11/13/2026 and quotes are due 11/20/2026. RFQ36C26227Q0047 Submission compliance
| 3 |
| SOW 6.1 and 6.9 |
| Provide separate square footage for the Building 1 and Building 11 interstitial levels. Confirm whether interstitial spaces are walkable full-height levels, the extent of ACM, whether the VA provides air monitoring/PPE or abatement before entry, and whether above-ceiling observation in ACM areas is expected. |
Interstitial spaces vary with floor and are not fully walkable at full-height. PPE to be furnished by contractor. Above ceiling observation in ACM areas are required.
Building 1 Floor 1 interstitial: 175,050 Floor 2 Interstitial: 100,407 Floor 3 Interstitial: 99,430 Floor 4 Interstitial: 102,323 Floor 5 Interstitial: 97,948 Floor 6 Interstitial: 97,971 Floor 7/PH Mechanical: 5,662 Floor 8/PH Level 2 Mechanical: 2,874
Building 11 Basement Interstitial: 27,480 Floor 1 Interstitial: 29,592 Survey hours, safety, and PPE cost
| 4 |
| SOW 6.2 |
| Confirm the December 2025 CAD files include current architectural backgrounds compliant with VA CAD standards, the estimated percentage of square footage renovated since December 2025, and any active construction areas. |
December 2025 CAD files are VA CAD standard compliant. Assume 50,000 square foot renovation and/or currently under construction since December 2025.
Background update effort (5% assumed)
| 5 |
| SOW 6.3 |
| Confirm the format of the Building 26 2026 as-builts (DWG, Revit, or PDF), whether Building 26 is occupied or new construction, whether it connects to Building 1, and whether any existing life safety drawings exist. |
Building 26 2026 as-builts haven’t been provided yet as of 11/13/2026, but the expectation is DWG. Building 26 is new construction but is expected to be occupied CY27 Q1-2. Life Safety drawings dated December 2026 will be available CY27 Q1.
Building 26 drafting effort
| 6 |
| SOW 6.8.ii |
| For exit signs, fire extinguisher cabinets, standpipes, pull stations, O2 hook-ups, and FDCs: is every device to be field-verified, or transcribed from VA records and as-builts? Are existing device inventories available? |
Field-verified IAW with NFPA 101-2027 for the base year through Dec 2029. Field-verified IAW with NFPA 101-2030 for the OY exercised for December 2029-December 2030 and later.
No explicit device schedule/inventory will be provided.
Survey and drafting hours
| 7 |
| SOW 5; E.1 |
Factor 1 SOW 5 references “mock audits, actions and recommendations.” Is a separate TJC-style EC/LS mock survey and report required beyond the SOC and drawings? If so, define the scope and deliverable.
BBI, LS drawings, requirements for improvement/associated photos, LS deficiency keymap.
Potential added scope
| 8 |
| SOW 6.2–6.3 (BBI/SOC) |
| Will the contractor enter data in the TJC e-SOC tool, or provide BBI for VA entry? Is Plan for Improvement (PFI) development or entry required? |
Vendor to provide BBI, requirements/plan for improvement. Facilities responsible for entry.
Report and data-entry effort
| 9 |
| B.2 Option CLINs |
| Do option years require a full re-survey of all three buildings annually, or an update of changed areas only? What annual change percentage should be assumed? |
SOC: Field-verify all three buildings IAW with NFPA 101-2027 for the base year through Dec 2029. Field-verified IAW with NFPA 101-2030 for the OY exercised for December 2029-December 2030 and later.
Drawings: Assume 50,000 sqft renovation annually.
Option-year pricing
| 10 |
| SOW 6.7 |
| Confirm the expected sheet count, whether six copies are required per sheet or per set, whether sets are bound, and the delivery location. |
Expectancy is to print full sets of the LS drawings (bind each building separately): Assume 30 sheet count between buildings 1, 11, and 26. Provide six copies of the final product as follows: (1) 24inch x 36 inch, (5) 15inch x 22 inch, bound.
Delivery Address:
Myles Esmele, Engineering Jennifer Moreno Department of Veterans Affairs Medical Center 3350 La Jolla Village Dr San Diego, CA 92161 Printing cost
| 11 |
| B.2 CLIN x003 |
Travel Confirm travel is priced as a firm-fixed-price lump sum per CLIN and not reimbursable at GSA rates.
FFP, lump sum, commercial rates.
Travel pricing method
| 12 |
| SOW 6.6 and 14 |
| Confirm the daily huddle expectation, escort availability, the percentage of restricted or escort-only areas (OR, SPS, behavioral health, data rooms), and any after-hours access needs. |
Huddle expectations -Day 1: facility badging -Every day: daily schedule Escort: Approximately 80,000 square feet between OR, SPS, behavioral, IT, ELT (executive leadership) Early hours: ORs Survey productivity
| 13 |
| SOW 8.5 |
| Identify the acceptable 16-hour asbestos course (for example, EPA O&M per 40 CFR 763.92) and fit-test type. Will the VA or the contractor furnish respirators? |
OSHA 16 hour or equivalent. Fit test is whatever the inspector is medically cleared for. OPM PPE to be furnished by contractor.
Training and PPE cost
| 14 |
| Deliverable review |
| State the number of review cycles and the VA review period for draft submissions. |
One review cycle unless something egregious is identified. 21 calendar day review time.
Schedule and revision effort
| 15 |
| General |
| Is a pre-quote site visit or walkthrough planned? |
Schedule 11/17, 09:00am PST.
Pricing confidence
| 16 |
| Section 16 |
Invoice (p. 38) The invoicing clause references “storage containers” and monthly invoicing. Confirm milestone or deliverable-based invoicing for CLINs 0001–0002.
Storage containers is not applicable. CLINs are deliverable based for work completed (arrears).
Cash flow
| 17 |
| E.2 Factor 1 |
| E.2 references “the device you are providing.” Confirm the expected technical volume content and any page limits. Not a devise, it will be a service. |
| Proposal preparation |
Could you clarify whether the Government anticipates primarily minor updates to the existing Life Safety Drawings based on completed construction projects, renovations, and changes in building configurations, or whether substantial revisions and redevelopment of the existing drawings are expected?
Assume 50,000 sqft in renovations annually
Additionally, for the four option years, should contractors anticipate routine annual updates reflecting changes since the previous assessment, or more extensive drawing revisions each year?
Assume 50,000 sqft in renovations annually
1. Is it possible to visit the site before bid submission?
Schedule 11/17, 09:00am PST.
2. Can USG provide building as-built drawings necessary for estimating purposes, such as building elevation drawings, fire protection plans, floor plans, MEP plans, etc?
No.
3. Have any project amendments been issued? Please provide them to us.
Assume 50,000 sqft in renovations annually.
1. Can the VA provide the existing December 2025 CAD life safety drawings for Buildings 1 and 11, including interstitial spaces, along with the 2026 as-built drawings for Building 26? If these cannot be released before award, can you provide the approximate number of sheets and floors requiring updates?
Assume 50,000 sqft in renovations annually.
Expectancy is to print full sets of the LS drawings: Assume 30 sheet count between buildings 1, 11, and 26. Provide six copies of the final product as follows: (1) 24inch x 36 inch, (5) 15inch x 22 inch, bound.
2. Are there any known deficiencies, outstanding Joint Commission findings, or significant changes to the buildings that must be addressed under this contract?
No.
3. Is the contractor expected to verify every room, compartment, and life safety device throughout all three buildings, or primarily update existing drawings based on identified changes and field observations?
SOC: Field-verify all three buildings IAW with NFPA 101-2027 for the base year through Dec 2029. Field-verified IAW with NFPA 101-2030 for the OY exercised for December 2029-December 2030 and later.
Drawings: Assume 50,000 sqft renovation annually.
4. Is there an opportunity for a site walkthrough before proposals are due, or can the VA provide additional photographs, floor plans, or other information to help contractors estimate the work?
Schedule 11/17, 09:00am PST.
Schedule and staffing
5. The base period is scheduled to begin December 9, 2026, but the SOW requires completion by the end of December. Will the VA allow additional time for first-year deliverables if the award or building access is delayed?
Yes. CY27 Q2 is the expected date for final deliverables.
6. Is there a minimum number of onsite visits or days required each year? Can drawing production, CAD updates, and report preparation be completed offsite after the inspections?
Contractor’s means and methods.
7. Will the VA provide escorts and access to restricted areas, including interstitial spaces, during scheduled inspections? Are there any additional background checks or credentialing requirements that could affect mobilization?
Escort: Approximately 80,000 square feet between OR, SPS, behavioral, IT, ELT (executive leadership).
Refer to Contract SOW sections for Identification Badges and Normal Working Hours. Additional details will be provided during the pre-construction meeting.
8. For the asbestos training and fit-test requirements, must every proposed team member hold these certifications at the time of proposal submission, or only personnel who will enter asbestos-containing areas before onsite work begins?
Refer to Contract SOW Safety Requirements 8.5.
Pricing and payment
9. The pricing schedule separates the Statement of Conditions and Report, Drawings Update, and Travel. Should each be priced as one annual fixed-price deliverable, or are additional visits and updates expected throughout the year?
Each should be one annual fixed-price deliverable. Adding CLIN 0004 Urgent/Miscellaneous LS drawing Corrections, due to site updates/renovations.
10. The invoicing section mentions monthly billing for storage containers, which appears unrelated to this requirement. Can the VA clarify the correct invoicing and payment structure? Can completed and accepted milestones be invoiced separately, or is payment tied to final annual deliverables?
Storage containers are not applicable. CLINs are deliverable based for work completed (arrears).
11. If the VA requests additional drawing updates, inspections, or scope changes beyond the original requirements, would those be handled through a formal contract modification?
Outside the submittal review period(s), contract will be modified for any urgent miscellaneous LS drawing corrections due to site updates/renovations.
Subcontracting and proposal requirements
**12. As this is an SDVOSB set-aside, can the VA clarify how it expects compliance with the limitations on subcontracting to be demonstrated for a team using a specialized life safety engineering subcontractor? SDVOSB’s has provided services in the past without a subcontractor. Are there specific prime-contractor performance requirements beyond the applicable regulatory limitations? No
13. The solicitation states that both prime and subcontractor experience will be evaluated. Can a newer SDVOSB prime rely on its proposed technical subcontractor's relevant hospital life safety experience to demonstrate capability, while separately identifying the prime's own experience?
Both experiences should be listed though they should be listed separately.
14. For the required qualification certificates, which professional licenses or credentials are mandatory for the prime versus the personnel or subcontractors performing the technical work?
To survey asbestos containing areas, refer to Contract SOW Safety Requirements 8.5.
Experience/knowledge of NFPA 101 LSC and healthcare occupancies.
**15. A&K has already submitted its VA Customer Engagement Portal registration for vendor processing. Can the VA confirm whether proof of submission is sufficient with our quote while the registration is pending approval? No, the contract specialist or contracting officer has access to that system.
**16. Can the VA confirm the correct solicitation number and required email subject line? Some submission instructions appear to contain a different RFQ number than 36C26227Q0047. The solicitation is correct.
1. Ongoing and Planned Construction Projects
Are there any ongoing or planned construction, renovation, or facility modification projects scheduled between December 8, 2026, and December 9, 2027, that must be incorporated into the life safety assessments and drawing updates? None to my knowledge.
If so, could the Government identify the affected buildings or areas, describe the anticipated modifications, and provide the estimated completion dates for these projects?
Assume 50,000 sqft renovation annually with variable scope.
2. Notice to Proceed, Site Activation, and Completion Schedule
Could the Government clarify its preferred Notice to Proceed (NTP) date, anticipated onsite assessment start date, and required completion date for the assessments, reports, and updated life safety drawings? The Notice to Proceed will be emailed to the successful offer with the Period of Performance dates included.
General expected timeline is:
Contract Award (CA) Pre-Con meeting: CA +7 days Site Survey: CA +15 days Draft: CA +45 days Draft review: CA +66 days Final deliverable: CA +90 days
Expectation is CY27 Q2.
Section 6 of the Statement of Work requires completion by the end of December, while the solicitation identifies a base period of performance from December 9, 2026, through December 8, 2027.
Please confirm whether the Government expects all initial assessments and deliverables to be completed by December 31, 2026, or whether the December completion requirement refers to a different annual reporting deadline.
CY27 Q2 is the expected date for final deliverables.
3. Asbestos-Containing Areas and Personnel Certification Requirements
Will the scope require contractor personnel to physically enter asbestos-containing areas of Building 1, including the interstitial spaces?
Yes.
If so, please confirm whether the minimum 16-hour asbestos certification and valid respirator fit-test certification are mandatory for all personnel entering these areas or only for personnel directly performing inspections within asbestos-containing environments.
To survey asbestos containing areas, refer to Contract SOW Safety Requirements 8.5.
Additionally, are there any specific respiratory protection requirements, personal protective equipment (PPE), medical clearance requirements, or facility-specific asbestos safety procedures that contractors must satisfy before entering these spaces?
To survey asbestos containing areas, refer to Contract SOW Safety Requirements.
1. SOW Section 6 says the work must be complete “by end of December,” but the base period starts 12/09/2026 and the delivery date is 12/08/2027. Does the Government expect all three buildings (about 1.17M SF) delivered by December 31, 2026, or by a later date in the base year?
CY27 Q2 is the expected date for final deliverables.
2. In each option year, does the scope repeat the full field survey and SOC for Bldgs 1, 11 and 26? Or is it an update covering only changes since the prior year?
SOC: Field-verify all three buildings IAW with NFPA 101-2027 for the base year through Dec 2029. Field-verified IAW with NFPA 101-2030 for the OY exercised for December 2029-December 2030 and later.
Drawings: Assume 50,000 sqft renovation annually.
3. Will the December 2025 Life Safety CAD files for Bldgs 1 and 11 be provided before award so offerors can assess their condition? What AutoCAD version and layer standard are required?
No.
4. For Bldg 26, are the 2026 as-built files in CAD or PDF? Does any Life Safety drawing exist for Bldg 26, or are new LS drawings required from scratch?
Building 26 2026 as-builts haven’t been provided yet as of 11/13/2026, but the expectation is DWG. Building 26 is new construction but is expected to be occupied CY27 Q1-2. Life Safety drawings dated December 2026 will be available CY27 Q1.
5. Who is the incumbent? Please provide the prior contract number and award value.
Not applicable.
6. Is the Travel CLIN priced as a firm fixed price, or reimbursed at actuals per the JTR with a not-to-exceed amount?
FFP, lump sum, commercial rates.
7. Section 5 mentions mock audits and identifying EC/LS deficiencies. Is a mock TJC survey or EC/LS deficiency assessment in scope? Or is the scope limited to the SOC/BBI and drawing updates?
BBI, LS drawings, requirements for improvement/associated photos, LS deficiency keymap.
8. Which NFPA 101 edition will the drawings and SOC be based on?
Field-verify all three buildings IAW with NFPA 101-2027 for the base year through Dec 2029. Field-verified IAW with NFPA 101-2030 for the OY exercised for December 2029-December 2030 and later. Drawings to match.
9. Will the contractor enter the SOC/BBI into the TJC e-SOC portal, or deliver the data to the facility for entry?
Facilities responsible for entry.
10. Does the 16-hour asbestos certification for Bldg 1 interstitial spaces need to be a specific course, such as EPA/OSHA Class III O&M? Will the VA provide escorts and access for those spaces?
OSHA 16 hour or equivalent. VA to provide access, but interstitial spaces is not an escorted space.
11. Do the drawings require a PE stamp or any other specific license or certification?
Not a prerequisite for performing the SOC and/or preparing life safety drawings; however, a licensed architect or engineer may bring added value through their specialized training and authority.
12. Are the six printed copies (one 24x36 and five 15x22) per building, or one combined set total?
Expectancy is to print full sets of the LS drawings (bind each building separately): Assume 30 sheet count between buildings 1, 11, and 26. Provide six copies of the final product as follows: (1) 24inch x 36 inch, (5) 15inch x 22 inch, bound.
13. Will a site visit be held before quotes are due?
Schedule 11/17, 09:00am PST.